[Fiware-cebit] Presentations at CEBIT 2014

CARLOS RALLI UCENDO ralli at tid.es
Wed Mar 5 10:26:10 CET 2014


Philipp,

If we do not update the program giving more room to those presentations I
am afraid it will happen anyway, because I do not believe they can make
them in 10/15min, including the time to swap speakers.
The point is not if there is a demo or not, they could use slides and
10/15' would still remain too less. We may reconsider this point.

I'm just trying to be realistic and therefore ask everybody to keep
sessions to 20min, so you will not have to speed up/cut unnecessarily.

Perhaps a workaround is not to update the agenda in the official program
but to keep in mind this timeline for our session and communicate it to
the moderator. I understand this variation is not significant to update
the official agenda accordingly.

Would you agree this way?

Ivan, can you please let me know your position?

Thanks to both for your understanding.
Best regards
--
---------------------------------------------------------------------------
---------------------------------------------
Carlos Ralli Ucendo (ralli at tid.es)
Cell: +34696923588
Twitter: @carlosralli
Blog: http://the-internet6.blogspot.com.es
<http://the-internet6.blogspot.com.es/>
Telefónica I+D SAU
Madrid, Spain
---------------------------------------------------------------------------
---------------------------------------------
Follow FI-WARE project (Future Internet Services Core Platform):
Website:  http://www.fi-ware.eu <http://www.fi-ware.eu/>
Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242
Twitter: @fiware
LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932
---------------------------------------------------------------------------
---------------------------------------------





El 04/03/14 22:46, "Philipp Slusallek" <Philipp.Slusallek at dfki.de>
escribió:

>Hi Carlos,
>
>Sorry, but such very last minute changes are not really possible any
>more for a number of reasons:
>
>-- The Future Talk program (that runs through the entire week and of
>which we are part on Wednesday) operates on 30 min slots for the entire
>CeBIT week, we cannot simply change that.
>
>-- The Future Talk program has been printed weeks ago. We may make small
>changes to the topics of each slot but it is way too late for any larger
>changes of the sort your propose. Any changes should stay close to the
>announced topics.
>
>-- Also, we have the separate tables for demos, I do not think that
>running demos on stage is actually a very good use of the little time we
>have (unless maybe as a teaser (best are images, from my point of view)
>for the real demos on the floor).
>
>We should make sure that we arrange the talks in within the slots that
>we have agreed on early in the process. Thanks!
>
>
>Best,
>
>       Philipp
>
>
>Am 04.03.2014 15:12, schrieb CARLOS RALLI UCENDO:
>> Dear Philipp and Ivan,
>>
>> I'm in charge of reviewing the final version of the agenda for this
>> event available at:
>>
>>https://docs.google.com/spreadsheet/ccc?key=0AoNGoA5Ii_6cdC1XRVZnVnp1TFhU
>>cktUaUROMldKQ3c#gid=0
>>
>>
>> We've got an issue with SAP, Fernando's Cloud and the testimonials
>> around FI-WARE (there will be 3 teams presenting there, not two) slots,
>> now planned to last 10/15min each.
>>
>> Therefore I'm trying to squeeze all the other sessions a bit. My plan
>> ­if you guys agree- is the following:
>>
>> Session 2  ­ 20 Min (it was 30)
>> Session 3  ­ 20 Min (it was 30)  ---> Includes Demo
>> Session 4a ­ 25 Min (it was 15) ---> Includes Demo
>> Session 4b ­ 20 Min (it was 15)
>> Session  5  ­ 45 Min (it was 30) ---> 15min per team.
>> Session  6  ­ 20 Min (it was 30)
>> Session 7   ­ 20 Min (it was 30)
>>
>> There are some 10min extra that we may use for a small break or to
>> adjust a bit the speakers swap time.
>>
>> Please, let me know if there is any problem reducing your slots 10min
>> each, so we can divide the time in a more rational way as shown above.
>>
>> Thanks in advance for your collaboration.
>> Best regards,
>> --
>>
>>
>>-------------------------------------------------------------------------
>>-----------------------------------------------
>>
>> Carlos Ralli Ucendo (ralli at tid.es <mailto:ralli at tid.es>)
>>
>> Cell: +34696923588
>>
>> Twitter: @carlosralli
>>
>> Blog: http://the-internet6.blogspot.com.es
>> <http://the-internet6.blogspot.com.es/>
>>
>> Telefónica I+D SAU
>>
>> Madrid, Spain
>>
>>
>>-------------------------------------------------------------------------
>>-----------------------------------------------
>>
>> Follow FI-WARE project (Future Internet Services Core Platform):
>>
>> Website: http://www.fi-ware.eu <http://www.fi-ware.eu/>
>>
>> Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242
>>
>> Twitter: @fiware
>>
>> LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932
>>
>>
>>-------------------------------------------------------------------------
>>-----------------------------------------------
>>
>>
>> ------------------------------------------------------------------------
>>
>> Este mensaje se dirige exclusivamente a su destinatario. Puede consultar
>> nuestra política de envío y recepción de correo electrónico en el enlace
>> situado más abajo.
>> This message is intended exclusively for its addressee. We only send and
>> receive email on the basis of the terms set out at:
>> http://www.tid.es/ES/PAGINAS/disclaimer.aspx
>
>
>--
>
>-------------------------------------------------------------------------
>Deutsches Forschungszentrum für Künstliche Intelligenz (DFKI) GmbH
>Trippstadter Strasse 122, D-67663 Kaiserslautern
>
>Geschäftsführung:
>   Prof. Dr. Dr. h.c. mult. Wolfgang Wahlster (Vorsitzender)
>   Dr. Walter Olthoff
>Vorsitzender des Aufsichtsrats:
>   Prof. Dr. h.c. Hans A. Aukes
>
>Sitz der Gesellschaft: Kaiserslautern (HRB 2313)
>USt-Id.Nr.: DE 148646973, Steuernummer:  19/673/0060/3
>--------------------------------------------------------------------------
>-


________________________________

Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra política de envío y recepción de correo electrónico en el enlace situado más abajo.
This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at:
http://www.tid.es/ES/PAGINAS/disclaimer.aspx



More information about the Fiware-cebit mailing list

You can get more information about our cookies and privacy policies clicking on the following links: Privacy policy   Cookies policy