From markus.heller at sap.com Mon Nov 4 12:35:12 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 4 Nov 2013 11:35:12 +0000 Subject: [Fiware-apps] WPL/WPA updates from 4.11 telco Message-ID: <393554EDCF801348BC53C7813C6CB73B1A686188@DEWDFEMB14A.global.corp.sap> Dear all in WP3, some news from today's WPL/WPA telco for you: 1. M30 Review December - Dates are fixed now: o Rehearsal: 16.12. and 17.12. o Official Review: 18.December 2013 - Juanjo/Miguel reported/wrote in minutes: o The EC conveyed the message that they want to assess the work done on an individual per partner basis (external availability, individual exploitation plans...) to see if the work in some GEis should be discontinued. This will have to be shared by the WPL/WPAs with the members of the chapters. In principle, we expect same attendees as always. Nothing precludes other partners from attending (as Intel did in the past). Suggestion to the WPL/WP o IMPORTANT: Each partner who would like to attend himself, can do so. Please contact TID or me for this. o Review Day Agenda is under preparation by TID ? The expected nature of the review meeting: ? Focus might be "more" on sustainability aspects, how to commercialize your results, based on the input given beforehand to reviewers/EC ? External availibility section in Cataloq gives this answer. ? Juanjo expects, that only listening to FI-WARE is topic, not decisions by EC/Reviewers communicated to us... o Reviewers/EC will use beforehand the following input from us send before the meeting: ? The "Lutz Schubert Report" (!!), ? Individual (confidential) exploitation plans, ? Catalog Info / Major updates according to review (e.g. sustainability information was lacking...(!)) - Juanjo: So each WP3 partner has in general to make sure and prepare for review (no immediate action item now, I will send around if needed later) o Explain what they have done in the catalog w.r.t. software and its documentation for each GE o Solid entries in updated catalog properly o Exploitation plans will be used o Prepare an WP3 chapter answer for the results in the "Lutz Schubert Report" (written? TBD) 2. Lutz Schubert Report / FI-WARE review report - As already commented, the analysis by Lutz Schubert will be taken as input for the month 30 review in December (see above). - During the last confcall we agreed not to ask for a new review by Lutz. - We just need to prepare a reply for the next review about issues identified by Lutz. Some of the items will require an update of software, software documentation or even information available in the Catalogue. We have to document what we have done. 3. Delivery of FI-WARE Third Release - Message to the whole consortium with guidelines sent on 2/Nov/2013. A preview was sent to the WPL/WPA a week before. - In summary: o Same rules as in R2 o Please note: EDITING ON THE PUBLIC WIKI IS NOT ALLOWED o R2 rejections stand o R3 is due on M33 (Jan 2014) o Deadline for delivery: 15.12.2013 4. Discussion of the "FI-WARE extension " - Email with our clarification questions has been sent by Juanjo to Arian, I have forwarded to you already - No consensus, no answer by Juanjo to Arian for the consortium so far sent out. - Juanjo to set up a doodle poll for opinions by all partners after he has received answer from Arian for our mails with clarification questions Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Nov 4 09:13:43 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 4 Nov 2013 08:13:43 +0000 Subject: [Fiware-apps] FI-WARE: Second group of remarks (FORM-C-2) In-Reply-To: <77A22C1085494D48B4018F06A40DB2C72FFE0281@EX10-MB2-MAD.hi.inet> References: <77A22C1085494D48B4018F06A40DB2C72FFE0281@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A685F11@DEWDFEMB14A.global.corp.sap> Hi FYI only: Some of us have some tasks here, therefore I chose to forward it in duplication to you? Best wishes Markus From: fiware-administrative-bounces at lists.fi-ware.eu [mailto:fiware-administrative-bounces at lists.fi-ware.eu] On Behalf Of JAVIER DE PEDRO SANCHEZ Sent: Montag, 4. November 2013 00:50 To: 'fiware-administrative at lists.fi-ware.eu'; Henrik Abramowicz; Alen Jusufbasic (alen.jusufbasic at ericsson.com) Subject: [Fiware-administrative] FI-WARE: Second group of remarks (FORM-C-2) Importance: High Dear all, Please find enclosed the second group of remarks from the Commission to the last submission of the FORM-C-2. (My responses in red). I need your contribution if your company is highlighted in yellow. Deadline, Tuesday 5th, 2013 EOB. Thank you in advance. BR Javier. Green highlighted: It?s ok. Yellow highlighted: Required action of the partner. Beneficiary 3 IBM Israel ? Science and Technology LTD : Please note that 3.469 ? are claimed in the Form C. The costs of the CFS are incurred in Period 3 therefore should not be charged in this reporting period but in the next reporting period. Please remove this costs from the Form C. Could you please explain why 3.469 ? are charged when the fee according to the CFS is 4.050 ? (excluding VAT) ? Normally 4.050 ? should be charged in the next reporting period. I think it is correct and no action is required. IBM-IL has provided two CFS, one per period. 3.469 ? are claimed in P2 as cost of the CFS of P1. 4.050 ? will be claimed in P3 as cost of CFS of P2. [cid:image001.jpg at 01CED93E.11A29330] SIGNED FORM-C-1 of IBM-IL [cid:image002.jpg at 01CED93E.11A29330] Beneficiary 3 IBM Israel ? Thank you for the additional letter from the auditors but the amount mentioned are only regarding the eligible costs of period 1 and adjustment of period 1, they do not refer of the costs of period 2. Could you please ask them to resubmit the letter taking into account also period 2 ? Ok, I will ask them to resubmit the letter again. Beneficiary 4 IBM Research : Thank you for your clarification about the adjustment. Could you please confirm that the adjustment is only of direct costs ? We were expecting to have a split of direct and indirect costs, as per the rejection in period 1. I?m going to ask them to update their adjustment because I think they didn?t split their adjustment. The financial statement says: [cid:image003.jpg at 01CED93E.11A29330] ?FI-WARE-rejections-RP1? excel file provided by the Commission says: [cid:image004.jpg at 01CED93E.11A29330] and IBM-CH has declared: [cid:image005.png at 01CED93E.11A29330] Beneficiary 5 : Thales Communications & Security SAS + Third Parties : Beneficiary 5 Thales Communications & Security SAS : Please note that in previous period a comment was made : "A total of 456.442 ? (including the third parties) may be resubmitted as adjustment in the next reporting period" The calculation of the costs resubmitted for TC and the third parties show an amount of 570.305 ? Please clarify? You are right. I?m going to ask them to clarify it. ?FI-WARE-rejections-RP1? excel file provided by the Commission says: [cid:image006.jpg at 01CED93E.11A29330] and THALES (beneficiary + third parties) have declared higher adjustment as follows: [cid:image007.png at 01CED93E.11A29330] [cid:image008.png at 01CED93E.11A29330] Beneficiary 6 Telecom Italia : Please note that the cost of the CFS can only be claimed in the next reporting period because the costs are incurred in reporting period 3. Please remove this costs from the Form C and claim those costs in the next reporting period. Regarding the CFS : Please note that the name of the person who has signed the CFS is required for the Beneficiary in the terms of reference (name and function of the an authorised representative) to be added when submitting the original version. Yes, there is a mistake, they have declared the second CFS cost instead of the first one. I?m going to ask them to update it. TI has provided two CFS, one per period. 3.025 ? should be claimed in P2 as cost of the CFS of P1. 2.050 ? would be claimed in P3 as cost of CFS of P2. [cid:image009.jpg at 01CED93E.11A29330] [cid:image010.jpg at 01CED93E.11A29330] [cid:image011.jpg at 01CED93E.11A29330] Beneficiary 7 Orange : Please note that the costs for the CFS are incurred in period 3, therefore those costs could not be charged in period 2. Please remove those costs and claim them in the next reporting period. I think it is correct and no action is required. FT has provided two CFS, one per period. 3.800 ? are claimed in P2 as cost of the CFS of P1. 3.800 ? will be claimed in P3 as cost of CFS of P2. [cid:image012.jpg at 01CED93E.11A29330] [cid:image013.jpg at 01CED93E.11A29330] Beneficiary 9 Nokia Siemens HU : Could you please confirm that it is usual accounting practice to charge Courier Services as direct costs ? Normally those costs are included in the indirect costs? Please provide in the management report an annex documents with those confirmations. I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. Beneficiary 9 Nokia Siemens Hungary : Please note that maximum amount of 90.547 ? could be resubmitted in Period 2 as adjustment of period 1. This amount should normally be split between direct costs and indirect costs. Could you please make the correction accordingly? I think they have to split them between direct costs and indirect costs. So, I?ll ask it to them. Financial Statement says: [cid:image014.jpg at 01CED93E.11A29330] ?FI-WARE-rejections-RP1? excel file provided by the Commission says: [cid:image015.jpg at 01CED93E.11A29330] and NSN-HU has declared on NEF the following: [cid:image016.jpg at 01CED93E.11A29330] Beneficiary 11 Deutsche Telekom AG : Reminder Comment from previous session : Please note that the DVI-D (36 ?) and the USB (35 ?) should be mentioned as consumables. Please note that those costs should normally be included in the overheads. Could you please confirm that it is usual accounting practice to charge those costs as direct costs ? (please add the e-mail confirmation in Annex of the Management report). As mentioned before, I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. Beneficiary 12 Technicolor R&D France SNC : Please note that the costs of the CFS can only be claimed in Period 3 because the costs are incurred in period 3 and not period 2. Please remove this costs from the current Form C and claim it in the next reporting period. You are right. I?m going to ask them to remove it. [cid:image017.jpg at 01CED93E.11A29330] Beneficiary 12 Technicolor R&D France SNC : Please note that according to the comment made in the reporting period 1, a total of 395.177 ? (including Third Party) may be resubmitted as adjustment in the next reporting period. Currently we have 278.175 ? + 118.787 ? = 396.962 ?. Please clarify the difference ? You are right. I?m going to ask them about it. Financial Statement says: [cid:image018.jpg at 01CED93E.11A29330] [cid:image019.jpg at 01CED93E.11A29330] ?FI-WARE-rejections-RP1? excel file provided by the Commission says: [cid:image020.jpg at 01CED93E.11A29330] and TRDF has declared on NEF the following: [cid:image021.png at 01CED93E.11A29330] Beneficiary 12 Technicolor R&D Paris : Please note that we acknowledge the Form C of Period 2 for the Third party (who left the project on 31/12/2012). Please provide in annex to the management report a statement that the costs are from 01/05/2012 to 31/12/2012. This e-mail confirmation is still missing. I?m going to ask for it again. It will be included in the Periodic Report too. Beneficiary 12 Technicolor R&D Paris : Please note that for the Third party, there is an adjustment Form C of period 2 in period 2 which is empty. Could you please remove this adjustment ? I?ve just removed it. Before: [cid:image022.jpg at 01CED93E.11A29330] [cid:image023.jpg at 01CED93E.11A29330] Now: [cid:image024.jpg at 01CED93E.11A29330] Beneficiary 13 Ericsson AB : Please provide a letter stated that the costs charged in the Form Cs are until 23/01/2013 (date of termination of the participation of Ericsson in the project) and not 30/04/2013 as mentioned in the Form C. Please attach this confirmation to an annex of the management report. As mentioned before, I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. Beneficiary 13 Ericsson AB : Please note that we acknowledge the submission of the costs previously rejected: 260.608 ?. Please note that this amount should have been split between direct and indirect costs. Could you please correct ? You are right. I?m going to ask them to split this amount between direct and indirect costs. Financial Statement says: [cid:image025.jpg at 01CED93E.11A29330] ?FI-WARE-rejections-RP1? excel file provided by the Commission says: [cid:image026.jpg at 01CED93E.11A29330] and EAB has declared on NEF the following: [cid:image027.jpg at 01CED93E.11A29330] Beneficiary 14 ATOS Please note that I did not see the separate excel sheet a breakdown of travel per Travel, person, dates, place, purpose and Amount. Please add this form in the Annex of the Management report with the other clarifications. It was a mistake including the excel file into the REMARKS-FORM-C-2 report. It was included as image, not as file. [cid:image028.jpg at 01CED93E.11A29330] It will be included in the Periodic Report. No action is required except to include the provided excel file in the Periodic Report. Beneficiary 19 INTEL IRELAND : Please note that we have acknowledged the resubmission of the costs rejected in period 1. Regarding the Third Party : We have noticed that INTEL GMBH does not request EC funding, could you please confirm this in the annex of the management report ? As mentioned before, I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. Beneficiary 27 Entidad Publica Empresarial Red Could you please provide a written confirmation that the costs charged in the Form C of RP2 are from 01/06/2012 to 30/04/2013 together with the signed Form C? As mentioned before, I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. Beneficiary 28 ZHAW : Could you please provide a written confirmation that the costs charged in the Form C of RP2 are from 01/11/2012 to 30/04/2013? To be attached in the Management report or send with the signed FormC. As mentioned before, I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. Beneficiary 29 DFKI : Could you please provide a written confirmation that the costs charged in the Form C of RP2 are from 01/11/2012 to 30/04/2013 ? To be attached in the Management report or send with the signed Form C. As mentioned before, I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. Beneficiary 30 USAAR-CISPA Could you please provide a written confirmation that the costs charged in the Form C of RP2 are from 01/11/2012 to 30/04/2013 ? To be attached in the Management report or send with the signed Form C. Beneficiary 31 EPROS : Could you please provide a written confirmation that the costs charged in the Form C of RP2 are from 01/11/2012 to 30/04/2013?To be attached in the Management report or send with the signed FormC. As mentioned before, I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. Beneficiary 32 iMinds : Could you please provide a written confirmation that the costs charged in the Form C of RP2 are from 01/02/2013 to 30/04/2013? To be attached in the Management report or send with the signed FormC. As mentioned before, I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. Beneficiary 33 NSNG1 : Could you please provide a written confirmation that the costs charged in the Form C of RP2 are from 05/05/2012 to 30/04/2013 ? To be attached in the Management report or send with the signed Form C. Please remove the adjustment Form C in period 2 for period 2. As mentioned before, I will include all the remarks and their responses in a new section of the Periodic Report. So, the confirmation e-mail you mean (provided in the last NEF session) will be included. No action is required except to include the provided confirmation e-mail in the Periodic Report. BR Javier ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 12768 bytes Desc: image001.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.jpg Type: image/jpeg Size: 90878 bytes Desc: image002.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image003.jpg Type: image/jpeg Size: 83074 bytes Desc: image003.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image004.jpg Type: image/jpeg Size: 24899 bytes Desc: image004.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image005.png Type: image/png Size: 15975 bytes Desc: image005.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image006.jpg Type: image/jpeg Size: 21777 bytes Desc: image006.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image007.png Type: image/png Size: 34476 bytes Desc: image007.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image008.png Type: image/png Size: 33559 bytes Desc: image008.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image009.jpg Type: image/jpeg Size: 11859 bytes Desc: image009.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image010.jpg Type: image/jpeg Size: 86859 bytes Desc: image010.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image011.jpg Type: image/jpeg Size: 86988 bytes Desc: image011.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image012.jpg Type: image/jpeg Size: 12944 bytes Desc: image012.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image013.jpg Type: image/jpeg Size: 81897 bytes Desc: image013.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image014.jpg Type: image/jpeg Size: 84837 bytes Desc: image014.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image015.jpg Type: image/jpeg Size: 19777 bytes Desc: image015.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image016.jpg Type: image/jpeg Size: 22184 bytes Desc: image016.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image017.jpg Type: image/jpeg Size: 44944 bytes Desc: image017.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image018.jpg Type: image/jpeg Size: 76147 bytes Desc: image018.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image019.jpg Type: image/jpeg Size: 70726 bytes Desc: image019.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image020.jpg Type: image/jpeg Size: 21230 bytes Desc: image020.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image021.png Type: image/png Size: 39466 bytes Desc: image021.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image022.jpg Type: image/jpeg Size: 33930 bytes Desc: image022.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image023.jpg Type: image/jpeg Size: 39243 bytes Desc: image023.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image024.jpg Type: image/jpeg Size: 28256 bytes Desc: image024.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image025.jpg Type: image/jpeg Size: 79077 bytes Desc: image025.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image026.jpg Type: image/jpeg Size: 23727 bytes Desc: image026.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image027.jpg Type: image/jpeg Size: 47961 bytes Desc: image027.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image028.jpg Type: image/jpeg Size: 32667 bytes Desc: image028.jpg URL: From markus.heller at sap.com Mon Nov 4 12:00:20 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 4 Nov 2013 11:00:20 +0000 Subject: [Fiware-apps] FW: [Fiware-wpl] Fwd: FI-WARE Project extension In-Reply-To: <52777E04.6030001@tid.es> References: <5274F26A.8050200@tid.es> <52777E04.6030001@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A686134@DEWDFEMB14A.global.corp.sap> FYI From: fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] On Behalf Of Juanjo Hierro Sent: Montag, 4. November 2013 11:59 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] Fwd: FI-WARE Project extension Hi, This is the email with questions about FI-WARE project extension that I sent to Arian. Cheers, -- Juanjo -------- Original Message -------- Subject: FI-WARE Project extension Date: Sat, 02 Nov 2013 13:39:06 +0100 From: Juanjo Hierro To: Arian.ZWEGERS at ec.europa.eu CC: jhierro >> "Juan J. Hierro" Dear Arian, As already commented to Jesus and you, we have opened a thread of discussion within FI-WARE about an extension of 4 months to the project in line with the recommendation given in the last review report. In order to give a definitive answer, some partners are asking for some elaborated answer to the following questions: 1. What kind of activities are foreseen during the extended period ? Would they only be related to support, dissemination and training ? 2. Will a given FI-WARE GEi owner be able to chose between a) closing its contribution to FI-WARE GE Open Specifications and its FI-WARE GEi development activities as already planned in the DoW (i.e., delivering updated GE Open Specifications as well as GEi software, testing plans and related documentation in month 33, that is end of January) or b) delay them to be in month 36 ? Ability to choose would be certainly useful, because some GEi owners can adapt to the extension provided that a delay in deliverables is approved, while others can live with the extension but provided that they can close their activities in the dates originally planned in the DoW. Telefonica, as coordinator, doesn't see any problem allowing a partner to close its activities as planned in the DoW. Just to avoid any burden we most probably would submit all the mentioned deliverables in month 36 (despite some partners would submit them internally at month 33) 3. Could month 36 be preserved as the date for submission of deliverables in WP11 (exploitation) ? 4. Could month 40 be defined as the date for submission of deliverables linked to WP12 (communication, collaboration and dissemination) ? 5. Can partners assuming a WPL or WPA role discontinue that role in month 36 if another partner is ready to take over their role until the end of the project ? Could you please answer these questions ? This and any other information that may be helpful to understand what the extension will mean in terms of workload would be certainly helpful to reach an agreement within the consortia as we would love to during this upcoming week. Best regards, -- Juanjo ------------- Product Development and Innovation (PDI) - Telefonica Digital website: www.tid.es email: jhierro at tid.es twitter: twitter.com/JuanjoHierro FI-WARE (European Future Internet Core Platform) Coordinator and Chief Architect FI-PPP Architecture Board chairman You can follow FI-WARE at: website: http://www.fi-ware.eu facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 twitter: http://twitter.com/FIware linkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From markus.heller at sap.com Thu Nov 7 08:54:04 2013 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 7 Nov 2013 07:54:04 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1A741B8E@DEWDFEMB14A.global.corp.sap> Dear FI-WARE WP3 colleagues, After moving to a morning slot now, I invite you to our WP3 Call on Thursdays 10-11. Please use the dial-in info below to dial-in. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller (The meeting roome may not always be used, I recommend that you dial into the audio conference with the phone numbers always) Audio Conference Details: Audio Participant Code: 124 225 33 29 Audio Dial-In Numbers: Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 5092 bytes Desc: not available URL: From markus.heller at sap.com Thu Nov 7 08:55:37 2013 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 7 Nov 2013 07:55:37 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1A741BCC@DEWDFEMB14A.global.corp.sap> Dear all, Today I need to move our meeting into the afternoon, sorry for short notice. I hope you can attend also today. BW Markus --- Dear FI-WARE WP3 colleagues, After moving to a morning slot now, I invite you to our WP3 Call on Thursdays 10-11. Please use the dial-in info below to dial-in. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller (The meeting roome may not always be used, I recommend that you dial into the audio conference with the phone numbers always) Audio Conference Details: Audio Participant Code: 124 225 33 29 Audio Dial-In Numbers: Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 5250 bytes Desc: not available URL: From markus.heller at sap.com Thu Nov 7 10:22:36 2013 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 7 Nov 2013 09:22:36 +0000 Subject: [Fiware-apps] test Message-ID: <393554EDCF801348BC53C7813C6CB73B1A741EFB@DEWDFEMB14A.global.corp.sap> -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Thu Nov 7 11:57:32 2013 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 7 Nov 2013 10:57:32 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74214F@DEWDFEMB14A.global.corp.sap> Hi, I guess I better move since my proposed today slot seems to be not optimal for many....Let's cut half to 30 minutes and let's see if we can find a slot tomorrow (if needed I would have time 11:00-12:00 tomorrow)). --- Dear all, Today I need to move our meeting into the afternoon, sorry for short notice. I hope you can attend also today. BW Markus --- Dear FI-WARE WP3 colleagues, After moving to a morning slot now, I invite you to our WP3 Call on Thursdays 10-11. Please use the dial-in info below to dial-in. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller (The meeting roome may not always be used, I recommend that you dial into the audio conference with the phone numbers always) Audio Conference Details: Audio Participant Code: 124 225 33 29 Audio Dial-In Numbers: Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 5382 bytes Desc: not available URL: From markus.heller at sap.com Fri Nov 8 09:40:55 2013 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 8 Nov 2013 08:40:55 +0000 Subject: [Fiware-apps] PPR WP3 contribution to Periodic Report - Draft Message-ID: <393554EDCF801348BC53C7813C6CB73B1A742BF0@DEWDFEMB14A.global.corp.sap> Hi all, Here I share the compiled draft WORD for WP3 contribution to the Periodic Report M25-M30 with you. There are yellow/red markings for Todos, we can go over it in the telco. Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.5 - WP3 -v0.2.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 76701 bytes Desc: D.1.2.5 - WP3 -v0.2.docx URL: From andreas.klein at sap.com Fri Nov 8 11:39:20 2013 From: andreas.klein at sap.com (Klein, Andreas) Date: Fri, 8 Nov 2013 10:39:20 +0000 Subject: [Fiware-apps] WP3 Meeting Minutes 2013-11-08 Message-ID: <556F697ADC3400408FBBCF7C6040979D6037A5B4@DEWDFEMB15B.global.corp.sap> Dear WP3 partners, please find the minutes of today's WP3 call in the docman: https://forge.fi-ware.eu/docman/view.php/12/3032/2013_11_08_FI-WARE_WP3_Minutes.doc Best regards Andreas Andreas Klein SAP AG SAP Research Center Karlsruhe Vincenz-Priessnitz-Strasse 1 D - 76131 Karlsruhe T +49-6227-7-52554 -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Nov 11 11:09:43 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 11 Nov 2013 10:09:43 +0000 Subject: [Fiware-apps] WP3 repsonse to Lutz Report Message-ID: <393554EDCF801348BC53C7813C6CB73B1A743C42@DEWDFEMB14A.global.corp.sap> Hi, We have received the Lutz Schubert Report, all chapter are to prepare a WP-chapter response according to Juanjo's request. For WP3, I propose to draft a "response" on this and I hope you agree with this idea along the following idea: a) For whole Wp3, a text with "general" response text (over ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FiWare_PPP_Evaluation v02 by Lutz Schubert.pdf Type: application/pdf Size: 985876 bytes Desc: FiWare_PPP_Evaluation v02 by Lutz Schubert.pdf URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From marco.ughetti at telecomitalia.it Mon Nov 11 11:48:32 2013 From: marco.ughetti at telecomitalia.it (Ughetti Marco) Date: Mon, 11 Nov 2013 11:48:32 +0100 Subject: [Fiware-apps] R: WP3 repsonse to Lutz Report In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1A743C42@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1A743C42@DEWDFEMB14A.global.corp.sap> Message-ID: <51508CA9C4AE774DAC3FC6B8F0E5A538472D17303C@GRFMBX707BA020.griffon.local> Hello all, In our case (Mediator GE) we are investigating the finding of LS report in order write a response As one of the finding is not clear to us, probably we will have to ask a specific question in order to clarify it Anyway we agree that we have to write a response for each item (about Mediator) in LS report Marco ____________________ Telecom Italia Marco Ughetti Tilab & Global Consulting Services Platforms & Technology Evolution Services Platforms Innovation via G. Reiss Romoli, 274 - 10148 Torino +39 011228 5654 +39 331 6001596 Da: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] Per conto di Heller, Markus Inviato: luned? 11 novembre 2013 11:10 A: 'fiware-apps at lists.fi-ware.eu' Oggetto: [Fiware-apps] WP3 repsonse to Lutz Report Hi, We have received the Lutz Schubert Report, all chapter are to prepare a WP-chapter response according to Juanjo's request. For WP3, I propose to draft a "response" on this and I hope you agree with this idea along the following idea: a) For whole Wp3, a text with "general" response text (over [mailto:fiware-wpl-bounces at lists.fi-ware.eu] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Donnerstag, 7. November 2013 17:48 To: fiware-ge-owners at lists.fi-ware.eu Cc: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] Lutz Report Dear Partners, Please, let me share with you the report by Lutz Schubert since some GE Owners inform not knowing it. It's important to know its content in order to identify corrective actions. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [cid:00000000000000000000000000000003 at TI.Disclaimer]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: logo Ambiente_foglia2.jpg Type: image/jpeg Size: 677 bytes Desc: logo Ambiente_foglia2.jpg URL: From markus.heller at sap.com Mon Nov 11 11:58:34 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 11 Nov 2013 10:58:34 +0000 Subject: [Fiware-apps] WP3 repsonse to Lutz Report In-Reply-To: <51508CA9C4AE774DAC3FC6B8F0E5A538472D17303C@GRFMBX707BA020.griffon.local> References: <393554EDCF801348BC53C7813C6CB73B1A743C42@DEWDFEMB14A.global.corp.sap> <51508CA9C4AE774DAC3FC6B8F0E5A538472D17303C@GRFMBX707BA020.griffon.local> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A743D23@DEWDFEMB14A.global.corp.sap> Hi all, Marco, Thank you, Marco, for your opinion sharing so that we/I could learn your opinion on this. To add on my mail below, where I had accidentally left out a specification of the proposed Todo for us all: Can please all GE-owners create their text until Thursday telco this week, we can the briefly discuss the general response texts surrounding the GE-specific texts and then finalize this task. We need to send this response back with no deadline given, but I propose to set a deadline for our submission to Juanjo until Friday EOB this week. Best wishes Markus From: Ughetti Marco [mailto:marco.ughetti at telecomitalia.it] Sent: Montag, 11. November 2013 11:49 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Cc: Cappadona Davide (Guest) Subject: R: WP3 repsonse to Lutz Report Hello all, In our case (Mediator GE) we are investigating the finding of LS report in order write a response As one of the finding is not clear to us, probably we will have to ask a specific question in order to clarify it Anyway we agree that we have to write a response for each item (about Mediator) in LS report Marco ____________________ Telecom Italia Marco Ughetti Tilab & Global Consulting Services Platforms & Technology Evolution Services Platforms Innovation via G. Reiss Romoli, 274 - 10148 Torino +39 011228 5654 +39 331 6001596 Da: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] Per conto di Heller, Markus Inviato: luned? 11 novembre 2013 11:10 A: 'fiware-apps at lists.fi-ware.eu' Oggetto: [Fiware-apps] WP3 repsonse to Lutz Report Hi, We have received the Lutz Schubert Report, all chapter are to prepare a WP-chapter response according to Juanjo's request. For WP3, I propose to draft a "response" on this and I hope you agree with this idea along the following idea: a) For whole Wp3, a text with "general" response text (over [mailto:fiware-wpl-bounces at lists.fi-ware.eu] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Donnerstag, 7. November 2013 17:48 To: fiware-ge-owners at lists.fi-ware.eu Cc: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] Lutz Report Dear Partners, Please, let me share with you the report by Lutz Schubert since some GE Owners inform not knowing it. It's important to know its content in order to identify corrective actions. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [rispetta l'ambiente]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 677 bytes Desc: image001.gif URL: From markus.heller at sap.com Mon Nov 11 12:33:15 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 11 Nov 2013 11:33:15 +0000 Subject: [Fiware-apps] FW: [Fiware-ge-owners] Backlog - Snapshot to be delivered -> last deadline 13.Nov - 12:00 AM In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90B891174C6@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90B891174C6@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A743DCA@DEWDFEMB14A.global.corp.sap> Hi all, please consider to do a final effort to fix your inconsistencies and bring your content up-to-date. Attention: The minor inconsistencies that are listed in red color in this XLS might nevertheless be reported to EC 1:1 in the RED color which I consider rather unfortunate then. So at least we from SAP try to avoid this and have corrected most red items already. Or let's hope we again do backlog printouts on paper and in black-white printing, would solve at least this red color problem :) (In WPOL telco we have asked Manuel to send around a mail with the exact snapshot base _date_ when he draws his official snapshot exactly. He might send this around soon, but I suggest to please consider that the snapshot to be delivered to EC might be taken very asap....no real date was given.) Best wishes Markus From: fiware-ge-owners-bounces at lists.fi-ware.eu [mailto:fiware-ge-owners-bounces at lists.fi-ware.eu] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Montag, 11. November 2013 11:48 To: fiware-ge-owners at lists.fi-ware.eu Cc: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-ge-owners] Backlog - Snapshot to be delivered -> last deadline 13.Nov - 12:00 AM Dear Partners, Attending the request received during the management board, a final effort is allowed to improve content and to fix inconsistencies in the backlog - dashboard views. It would be much appreciated your taking action to fix ALL items marked red. Please, if you had any doubt on the reason why a specific items is marked red, let me know. It is also an opportunity for the IoT and Security chapters to better improve their backlogs, their current sprint planning level goes to 25% of the other chapters. Thanks again for cooperation!! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From markus.heller at sap.com Mon Nov 11 15:52:20 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 11 Nov 2013 14:52:20 +0000 Subject: [Fiware-apps] Your additons to WP3 for Periodic Report until today EOB Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74407E@DEWDFEMB14A.global.corp.sap> Hi All, I would like to receive your input until today EOB to go on (I have now received a request for our contribution today), can you please make your changes and submit to me today? This would be a change of plans (delivery was planned until tomorrow EOB) but I would rather like to be more rapid. Best wishes Markus --- >From our WP3 meeting minutes I copy: * Periodic Report * Thanks for your contributions * Precompiled version was already sent around * Missing in the first part - please summarize your activities in one line "Main deviation..." and provide it to Markus * Main Results - input from SAP missing * Please provide explanations to Markus for possible under/over spending. * All in all document is already in a good shape -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Tue Nov 12 11:33:29 2013 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 12 Nov 2013 10:33:29 +0000 Subject: [Fiware-apps] WP3 Periodic Report: Input needed Message-ID: <393554EDCF801348BC53C7813C6CB73B1A7446CD@DEWDFEMB14A.global.corp.sap> Dear all, I attach the current version 0.3 of our Periodic Report Contribution WP3. Important: I had to adapt the reporting layout now (--> more indiv. partner work transparency). In the general section and within each task section, you will now find your per-partner input arranged in 1 partner-specific text fragment with 3 sections (progress, results, deviations and actions). So each company please check this WORD and see how you are reported now... I have added some COMMENTS for you in review-mode, please watch out for comments to your company. Use TRACK CHANGES to insert your missing input into this WORD and send it back this track-changes version, please. @ALL: Please edit and fill in your missing inputs, check that your input has been copied correctly. Many partners will need to add some content along with the adoption of the new reporting format as per template. Deadline: Tomorrow Tuesday 13.11 Lunch time (12:00). @E-ISS: You have 10 PM in Task 3.3 in DOW Amdmt 5., if I am right. Can you please fill in your text input for T3.3. It is currently missing completely (?) Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.5 - WP3 -v0.3.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 76432 bytes Desc: D.1.2.5 - WP3 -v0.3.docx URL: From lucio at tid.es Tue Nov 12 14:21:23 2013 From: lucio at tid.es (JAVIER LUCIO RUIZ-ANDINO) Date: Tue, 12 Nov 2013 13:21:23 +0000 Subject: [Fiware-apps] WP3 Periodic Report: Input needed In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1A7446CD@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1A7446CD@DEWDFEMB14A.global.corp.sap> Message-ID: <47E859DB20D4CD4281639C75E324CD8F2F7D25CB@EX10-MB1-MAD.hi.inet> Dear Markus: Find attached TID contribution in the overall WP3 description. Best regards, Javier De: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] En nombre de Heller, Markus Enviado el: martes, 12 de noviembre de 2013 11:33 Para: 'fiware-apps at lists.fi-ware.eu' Asunto: [Fiware-apps] WP3 Periodic Report: Input needed Dear all, I attach the current version 0.3 of our Periodic Report Contribution WP3. Important: I had to adapt the reporting layout now (--> more indiv. partner work transparency). In the general section and within each task section, you will now find your per-partner input arranged in 1 partner-specific text fragment with 3 sections (progress, results, deviations and actions). So each company please check this WORD and see how you are reported now... I have added some COMMENTS for you in review-mode, please watch out for comments to your company. Use TRACK CHANGES to insert your missing input into this WORD and send it back this track-changes version, please. @ALL: Please edit and fill in your missing inputs, check that your input has been copied correctly. Many partners will need to add some content along with the adoption of the new reporting format as per template. Deadline: Tomorrow Tuesday 13.11 Lunch time (12:00). @E-ISS: You have 10 PM in Task 3.3 in DOW Amdmt 5., if I am right. Can you please fill in your text input for T3.3. It is currently missing completely (?) Best wishes Markus ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D 1 2 5 - WP3 -v0 3-TID.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 69213 bytes Desc: D 1 2 5 - WP3 -v0 3-TID.docx URL: From Bettina.Lehmann at telekom.de Tue Nov 12 16:25:48 2013 From: Bettina.Lehmann at telekom.de (Bettina.Lehmann at telekom.de) Date: Tue, 12 Nov 2013 16:25:48 +0100 Subject: [Fiware-apps] Your additons to WP3 for Periodic Report until today EOB In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1A74407E@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1A74407E@DEWDFEMB14A.global.corp.sap> Message-ID: Dear Markus: Find attached DT contribution to WP3. Regards Bettina From: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] On Behalf Of Heller, Markus Sent: Montag, 11. November 2013 15:52 To: 'fiware-apps at lists.fi-ware.eu' Subject: [Fiware-apps] Your additons to WP3 for Periodic Report until today EOB Hi All, I would like to receive your input until today EOB to go on (I have now received a request for our contribution today), can you please make your changes and submit to me today? This would be a change of plans (delivery was planned until tomorrow EOB) but I would rather like to be more rapid. Best wishes Markus --- >From our WP3 meeting minutes I copy: * Periodic Report * Thanks for your contributions * Precompiled version was already sent around * Missing in the first part - please summarize your activities in one line "Main deviation..." and provide it to Markus * Main Results - input from SAP missing * Please provide explanations to Markus for possible under/over spending. * All in all document is already in a good shape -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D 1 2 5 - WP3 -v0 3DT.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 76408 bytes Desc: D 1 2 5 - WP3 -v0 3DT.docx URL: From markus.heller at sap.com Tue Nov 12 19:15:41 2013 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 12 Nov 2013 18:15:41 +0000 Subject: [Fiware-apps] FYI Current version D.1.2.5 - WP3 -v0.4.docx Message-ID: <393554EDCF801348BC53C7813C6CB73B1A744B4C@DEWDFEMB14A.global.corp.sap> Hi all, FYI I attach the current version for tonight...Please contribute until tomorrow lunch - for the remaining partners... Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.5 - WP3 -v0.4.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 77525 bytes Desc: D.1.2.5 - WP3 -v0.4.docx URL: From markus.heller at sap.com Wed Nov 13 09:52:44 2013 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 13 Nov 2013 08:52:44 +0000 Subject: [Fiware-apps] FYI Current version D.1.2.5 - WP3 -v0.4.docx Message-ID: <393554EDCF801348BC53C7813C6CB73B1A745802@DEWDFEMB14A.global.corp.sap> Hi all, I have a thought: We could try to collect what has been done in the WP3 w.r.t. integration (of our tools with each other, of our tools with some other tools - e.g. in live demonstrators or use case projects or alike). If done well, it would serve quite nice as a proof point for our teamwork and more the usability of the GEs and their integration capabilities. @GE owners: In order to see, if that works, can you please write (per mail) to all statements like this: - integration of GE XY with tool / GE for (project/demonstrator/use case project) - integration of GE XY with tool / GE for (project/demonstrator/use case project) - ... If we can achieve a useful critical mass, I would write a paragraph on this in the general section, which could be one of the successes for the overall GE as team effort. Suggestion: Can you just do this until today EOB to let me know if that works? Best wishes Markus From: Heller, Markus Sent: Dienstag, 12. November 2013 19:16 To: 'fiware-apps at lists.fi-ware.eu' Subject: FYI Current version D.1.2.5 - WP3 -v0.4.docx Hi all, FYI I attach the current version for tonight...Please contribute until tomorrow lunch - for the remaining partners... Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: From lucio at tid.es Wed Nov 13 18:28:27 2013 From: lucio at tid.es (JAVIER LUCIO RUIZ-ANDINO) Date: Wed, 13 Nov 2013 17:28:27 +0000 Subject: [Fiware-apps] WP3 repsonse to Lutz Report In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1A743D23@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1A743C42@DEWDFEMB14A.global.corp.sap> <51508CA9C4AE774DAC3FC6B8F0E5A538472D17303C@GRFMBX707BA020.griffon.local> <393554EDCF801348BC53C7813C6CB73B1A743D23@DEWDFEMB14A.global.corp.sap> Message-ID: <47E859DB20D4CD4281639C75E324CD8F2F7D3E11@EX10-MB1-MAD.hi.inet> Dear Markus: For the RSS GE the following comment appears in the report: Revenue Sharing System A Revenue Sharing System (RSS Engine), which allows the calculation and distribution of revenues according to the agreed business models. The RSS GE requires a revenue sharing (RS) model to calculate the incomes and revenue shares to be distributed among parties (application/service providers). GE Implementation(s): ? none Our answer to this comment is the following one: The implementation of the GE is available from the FI-WARE PPP RESTRICTED area at: https://forge.fi-ware.eu/frs/?group_id=23 This implementation is available for private use in the PPP programme from 26th June 2013 as seen in the above URL: [cid:image002.jpg at 01CEE09D.23606410] Let me know if this is enough. Best regards, Javier De: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] En nombre de Heller, Markus Enviado el: lunes, 11 de noviembre de 2013 11:59 Para: Ughetti Marco; 'fiware-apps at lists.fi-ware.eu' Asunto: Re: [Fiware-apps] WP3 repsonse to Lutz Report Hi all, Marco, Thank you, Marco, for your opinion sharing so that we/I could learn your opinion on this. To add on my mail below, where I had accidentally left out a specification of the proposed Todo for us all: Can please all GE-owners create their text until Thursday telco this week, we can the briefly discuss the general response texts surrounding the GE-specific texts and then finalize this task. We need to send this response back with no deadline given, but I propose to set a deadline for our submission to Juanjo until Friday EOB this week. Best wishes Markus From: Ughetti Marco [mailto:marco.ughetti at telecomitalia.it] Sent: Montag, 11. November 2013 11:49 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Cc: Cappadona Davide (Guest) Subject: R: WP3 repsonse to Lutz Report Hello all, In our case (Mediator GE) we are investigating the finding of LS report in order write a response As one of the finding is not clear to us, probably we will have to ask a specific question in order to clarify it Anyway we agree that we have to write a response for each item (about Mediator) in LS report Marco ____________________ Telecom Italia Marco Ughetti Tilab & Global Consulting Services Platforms & Technology Evolution Services Platforms Innovation via G. Reiss Romoli, 274 - 10148 Torino +39 011228 5654 +39 331 6001596 Da: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] Per conto di Heller, Markus Inviato: luned? 11 novembre 2013 11:10 A: 'fiware-apps at lists.fi-ware.eu' Oggetto: [Fiware-apps] WP3 repsonse to Lutz Report Hi, We have received the Lutz Schubert Report, all chapter are to prepare a WP-chapter response according to Juanjo's request. For WP3, I propose to draft a "response" on this and I hope you agree with this idea along the following idea: a) For whole Wp3, a text with "general" response text (over [mailto:fiware-wpl-bounces at lists.fi-ware.eu] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Donnerstag, 7. November 2013 17:48 To: fiware-ge-owners at lists.fi-ware.eu Cc: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] Lutz Report Dear Partners, Please, let me share with you the report by Lutz Schubert since some GE Owners inform not knowing it. It's important to know its content in order to identify corrective actions. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [rispetta l'ambiente]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.jpg Type: image/jpeg Size: 11361 bytes Desc: image002.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image003.gif Type: image/gif Size: 677 bytes Desc: image003.gif URL: From markus.heller at sap.com Thu Nov 14 09:56:18 2013 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 14 Nov 2013 08:56:18 +0000 Subject: [Fiware-apps] For telco: Current Draft version 0.5 for WP3 Periodic Report Message-ID: <393554EDCF801348BC53C7813C6CB73B1A7462D8@DEWDFEMB14A.global.corp.sap> Hi, FYI / For telco: Current Draft version 0.5 for WP3 Periodic Report Best wishes Markus -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.5 - WP3 -v0.5.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 78846 bytes Desc: D.1.2.5 - WP3 -v0.5.docx URL: From markus.heller at sap.com Thu Nov 14 10:50:52 2013 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 14 Nov 2013 09:50:52 +0000 Subject: [Fiware-apps] FW: Backlog content: Dashboard and Review's update In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911A3F6@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911A3F6@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A746372@DEWDFEMB14A.global.corp.sap> FYI We have much red lights... FYI Here is for the backlog we are compared with the other WPs (just the red/green images...): [cid:image001.png at 01CEE127.623B2320] From: fiware-ge-owners-bounces at lists.fi-ware.eu [mailto:fiware-ge-owners-bounces at lists.fi-ware.eu] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Mittwoch, 13. November 2013 13:25 To: fiware-ge-owners at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu Cc: fiware-wpa at lists.fi-ware.eu Subject: [Fiware-ge-owners] Backlog content: Dashboard and Review's update Dear Partners, Please, find linked dashboards and reviews updated. They have been beautified. Reviews have now new different graphs focused on the issues - stats graphs are left for the last page WC4. Dashboards -> for activity management Apps: https://forge.fi-ware.eu/docman/view.php/27/3060/FIWARE.backlog.apps.dashboard.20131113.xlsx Cloud: https://forge.fi-ware.eu/docman/view.php/27/3061/FIWARE.backlog.cloud.dashboard.20131113.xlsx IoT: https://forge.fi-ware.eu/docman/view.php/27/3064/FIWARE.backlog.iot.dashboard.20131113.xlsx Data:https://forge.fi-ware.eu/docman/view.php/27/3062/FIWARE.backlog.data.dashboard.20131113.xlsx I2nd:https://forge.fi-ware.eu/docman/view.php/27/3063/FIWARE.backlog.i2nd.dashboard.20131113.xlsx Sec: https://forge.fi-ware.eu/docman/view.php/27/3065/FIWARE.backlog.security.dashboard.20131113.xlsx Reviews -> for fixing issues on the tracker and wiki Apps: https://forge.fi-ware.eu/docman/view.php/27/3054/FIWARE.backlog.apps.review.20131113.xlsx Cloud: https://forge.fi-ware.eu/docman/view.php/27/3055/FIWARE.backlog.cloud.review.20131113.xlsx IoT: https://forge.fi-ware.eu/docman/view.php/27/3058/FIWARE.backlog.iot.review.20131113.xlsx Data: https://forge.fi-ware.eu/docman/view.php/27/3056/FIWARE.backlog.data.review.20131113.xlsx I2nd: https://forge.fi-ware.eu/docman/view.php/27/3057/FIWARE.backlog.i2nd.review.20131113.xlsx Sec: https://forge.fi-ware.eu/docman/view.php/27/3059/FIWARE.backlog.security.review.20131113.xlsx If anything, please, don't hesitate to let me know. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 128257 bytes Desc: image001.png URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From markus.heller at sap.com Thu Nov 14 10:56:47 2013 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 14 Nov 2013 09:56:47 +0000 Subject: [Fiware-apps] FW: Some guidelines for going to FI-LAB In-Reply-To: <9F2BAF5AA3E43A448F6B3DC7D4C56F584CA1694B@EX10-MB2-MAD.hi.inet> References: <9F2BAF5AA3E43A448F6B3DC7D4C56F584CA1694B@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A746406@DEWDFEMB14A.global.corp.sap> FYI may be of interest so someone to read this view of Henar... -----Original Message----- From: fiware-testbed-bounces at lists.fi-ware.eu [mailto:fiware-testbed-bounces at lists.fi-ware.eu] On Behalf Of HENAR MU?OZ FRUTOS Sent: Donnerstag, 14. November 2013 08:10 To: fiware-testbed at lists.fi-ware.eu Subject: [Fiware-testbed] Some guidelines for going to FI-LAB Dear all It seems there are a lot of confusion about what is needed to go to FI-LAB. 1.- If your GE is a global instance, you need to provide an image in the testbed. Then, the testbed team will check it and deploy in the FI-LAB. You have to take into account, that your GE should be Oath-security, which means that your image should include it. 2.- If you GE is a dedicated instance you need to satisfy: 2.1- You need to create an image 2.2.- you need to create recipes for your GE. Tell me if you have any doubt. Regards, Henar ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-testbed mailing list Fiware-testbed at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-testbed From markus.heller at sap.com Fri Nov 15 15:15:11 2013 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 15 Nov 2013 14:15:11 +0000 Subject: [Fiware-apps] FW: Backlog content: Dashboard and Review's update In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911B1EB@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911A3F6@EX10-MB2-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1A7463CD@DEWDFEMB14A.global.corp.sap> <65CDBE2E7E5A964BB8BC5F4328FDE90B8911AD7F@EX10-MB2-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1A746D87@DEWDFEMB14A.global.corp.sap> <65CDBE2E7E5A964BB8BC5F4328FDE90B8911B1EB@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A748323@DEWDFEMB14A.global.corp.sap> Hi, I forward current snapshots (as of this morning) for the dashboard and the apps review, so that you can go on deleting red entries in the dashboard (will be reported to EC). Manuel mentioned that today he would take a new snaphot and use it. Attention: Mediator has lots of open entries in this snapshot. Maybe already done, but nevertheless I would like recommend to fix them today (snaphost is taken today for EC, if I understood right). Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.apps.dashboard.20131115.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 357117 bytes Desc: FIWARE.backlog.apps.dashboard.20131115.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.apps.review.20131115.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 169745 bytes Desc: FIWARE.backlog.apps.review.20131115.xlsx URL: From markus.heller at sap.com Fri Nov 15 16:45:38 2013 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 15 Nov 2013 15:45:38 +0000 Subject: [Fiware-apps] FW: Backlog content: Dashboard and Review's update In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1A748323@DEWDFEMB14A.global.corp.sap> References: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911A3F6@EX10-MB2-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1A7463CD@DEWDFEMB14A.global.corp.sap> <65CDBE2E7E5A964BB8BC5F4328FDE90B8911AD7F@EX10-MB2-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1A746D87@DEWDFEMB14A.global.corp.sap> <65CDBE2E7E5A964BB8BC5F4328FDE90B8911B1EB@EX10-MB2-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1A748323@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74925A@DEWDFEMB14A.global.corp.sap> Hi, I have forwarded current snapshots (as of this morning) for the dashboard and the apps review, so that you can go on deleting red entries in the dashboard (will be reported to EC). Manuel mentioned that today he would take a new snaphot and use it. Please focus on the dashboard XLS and see your red entries there: Attention: Mediator has lots of open entries in this snapshot. Maybe already done, but nevertheless I would like recommend to fix them today (snaphost is taken today for EC, if I understood right). --> @Thales, Joaquin: Can you please do this for your own items in the backlog for mediator (remove red entries) etc. , Davide has repaired the TI backlog items now (to scheduled state) accordingly. Would be best today, since Manuel takes snapshot very soon (no details known by me). Of course, beside this do fix bugs in the backlog review XLS also as usual, both need to be done. Best wishes Markus [cid:image001.png at 01CEE222.1B6C4950] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 136561 bytes Desc: image001.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.apps.dashboard.20131115.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 357117 bytes Desc: FIWARE.backlog.apps.dashboard.20131115.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.apps.review.20131115.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 169745 bytes Desc: FIWARE.backlog.apps.review.20131115.xlsx URL: From markus.heller at sap.com Fri Nov 15 17:31:05 2013 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 15 Nov 2013 16:31:05 +0000 Subject: [Fiware-apps] Backlog content: Dashboard and Review's update References: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911A3F6@EX10-MB2-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1A7463CD@DEWDFEMB14A.global.corp.sap> <65CDBE2E7E5A964BB8BC5F4328FDE90B8911AD7F@EX10-MB2-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1A746D87@DEWDFEMB14A.global.corp.sap> <65CDBE2E7E5A964BB8BC5F4328FDE90B8911B1EB@EX10-MB2-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1A748323@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A749322@DEWDFEMB14A.global.corp.sap> Hi all, Please each of you consider sending a ?Thank you? mail to Thorsten Sandfuchs individually asap ? After some analysis, Thorsten managed to improve the WP3 backlog performance KPI (new red/green diagram in the tracker review XLS) considerably bringing our KPI performance to new heights: He was able to ?automate away? some of our biggest inconsistencies/problems with the help of scripting today: The T-C2 criterion results has been seriously improved by his ?bugfixing? in the backlog. This saved all of us in the team from huge manual effort (!). So after having introduced the ?global? well received deliverable generation tool for FI-WARE in earlier years? he now did it again? ? Thank you & Have a nice weekend Markus From: Heller, Markus Sent: Freitag, 15. November 2013 16:46 To: 'fiware-apps at lists.fi-ware.eu' Subject: FW: Backlog content: Dashboard and Review's update Hi, I have forwarded current snapshots (as of this morning) for the dashboard and the apps review, so that you can go on deleting red entries in the dashboard (will be reported to EC). Manuel mentioned that today he would take a new snaphot and use it. -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Sat Nov 16 17:21:24 2013 From: markus.heller at sap.com (Heller, Markus) Date: Sat, 16 Nov 2013 16:21:24 +0000 Subject: [Fiware-apps] FW: [Fiware-testbed] catalogue status as for today In-Reply-To: References: Message-ID: <393554EDCF801348BC53C7813C6CB73B1A7494FF@DEWDFEMB14A.global.corp.sap> Hi all, This is Stefano's reports to WPL/WPA as of 12.11. with his current approval pipeline state for the catalog, I forward it here for your information: Please check status of approval for your GE in the catalog. a) If red and you have not fixed something yet, then you can please act now. I suggest that you can ask Stefano directly for feedback (please me in CC) on your GE why the red entry is there and how to fix it (I do not know the semantics of this chart either, sorry..). b) If something is "green" but you are not satisfied with your GE presence, please also ask Stefano (me in CC). Best wishes Markus cell: +39-335-7542-567 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: Testbed-V2_catalogue_publication_status.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 49761 bytes Desc: Testbed-V2_catalogue_publication_status.xlsx URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From markus.heller at sap.com Sat Nov 16 17:52:50 2013 From: markus.heller at sap.com (Heller, Markus) Date: Sat, 16 Nov 2013 16:52:50 +0000 Subject: [Fiware-apps] 1 WP3 course in Edu Platform, please add Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74955F@DEWDFEMB14A.global.corp.sap> Hi, Please add your input here, since only 1 course is available for our chapter....what about your existing webinars etc or other online courseware-like documentation that can be deployed here... Best wishes Markus [cid:image001.jpg at 01CEE2F4.A96AF620] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 23348 bytes Desc: image001.jpg URL: From markus.heller at sap.com Mon Nov 18 19:03:45 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 18 Nov 2013 18:03:45 +0000 Subject: [Fiware-apps] FW: [Fiware-ge-owners] Backlog: Dashboard, Review and hotTopics -> updated In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911B817@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911B817@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A749F61@DEWDFEMB14A.global.corp.sap> Hi FYI Please inspect for your Ges... As usual, some issues reported here can be already done by you - I guess - which I cannot check in this XLS ....So some are done as I have checked, nevertheless here I pass it on... Per 1) Dashboard: @BEMES, @CompositionEditor, @mediator, --> please check and act if not done... Per 2) Apps tracker: ...as usual... at All.. Per 3) hot Topics, Work on your assigned tasks / for your GE in all 3 hot topic areas... at All Best wishes Markus From: fiware-ge-owners-bounces at lists.fi-ware.eu [mailto:fiware-ge-owners-bounces at lists.fi-ware.eu] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Montag, 18. November 2013 10:47 To: fiware-ge-owners at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu Cc: fiware-wpa at lists.fi-ware.eu Subject: [Fiware-ge-owners] Backlog: Dashboard, Review and hotTopics -> updated Dear Partners, Please, find below the links to updated views: Dashboards: Apps: https://forge.fi-ware.eu/docman/view.php/27/3083/FIWARE.backlog.apps.dashboard.20131118.xlsx Cloud: https://forge.fi-ware.eu/docman/view.php/27/3084/FIWARE.backlog.cloud.dashboard.20131118.xlsx IoT: https://forge.fi-ware.eu/docman/view.php/27/3087/FIWARE.backlog.iot.dashboard.20131118.xlsx Data: https://forge.fi-ware.eu/docman/view.php/27/3085/FIWARE.backlog.data.dashboard.20131118.xlsx I2nd: https://forge.fi-ware.eu/docman/view.php/27/3086/FIWARE.backlog.i2nd.dashboard.20131118.xlsx Sec: https://forge.fi-ware.eu/docman/view.php/27/3088/FIWARE.backlog.security.dashboard.20131118.xlsx Please, notice the flow chart has now an additional curve. Review: Apps: https://forge.fi-ware.eu/docman/view.php/27/3089/FIWARE.backlog.apps.review.20131118.xlsx Cloud: https://forge.fi-ware.eu/docman/view.php/27/3090/FIWARE.backlog.cloud.review.20131118.xlsx IoT: https://forge.fi-ware.eu/docman/view.php/27/3093/FIWARE.backlog.iot.review.20131118.xlsx Data: https://forge.fi-ware.eu/docman/view.php/27/3091/FIWARE.backlog.data.review.20131118.xlsx I2nd: https://forge.fi-ware.eu/docman/view.php/27/3092/FIWARE.backlog.i2nd.review.20131118.xlsx Sec: https://forge.fi-ware.eu/docman/view.php/27/3094/FIWARE.backlog.security.review.20131118.xlsx Hot Topics: Catalogue: https://forge.fi-ware.eu/docman/view.php/27/3095/FIWARE.backlog.hotTopic-Catalogue.20131118.xlsx TrainingMaterial: https://forge.fi-ware.eu/docman/view.php/27/3097/FIWARE.backlog.hotTopic-TrainingMaterial.20131118.xlsx LutzReport: https://forge.fi-ware.eu/docman/view.php/27/3096/FIWARE.backlog.hotTopic-LutzReport.20131118.xlsx If anything, please, don't hesitate to let me know. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From markus.heller at sap.com Mon Nov 18 19:12:48 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 18 Nov 2013 18:12:48 +0000 Subject: [Fiware-apps] WP3: Check your License open Spec (implcit/essential) correct.....open spec legal notice usage in fi-ware wiki Message-ID: <393554EDCF801348BC53C7813C6CB73B1A749FA5@DEWDFEMB14A.global.corp.sap> Hi all, please make sure that you have your license correctly written in the WIKI, this was a reviewer request. You have chosen implicit or essential license, please update then (most often "interim License" is used in your GEs in WP3). For SAP GEs we have corrected this, feel inspired. See what we wrote for Marketplace as an example (we chose essential ...) --> http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/FIWARE.ArchitectureDescription.Apps.Marketplace You can check your license with these related overview pages to ease up click-through & fixing this: Who used new license "essential" or "implicit": NEW: http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Special:WhatLinksHere/FI-WARE_Open_Specification_Legal_Notice_(essential_patents_license)?limit=500 http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Special:WhatLinksHere/FI-WARE_Open_Specification_Legal_Notice_(implicit_patents_license)?limit=500 Who uses the outdated licenses: OLD: http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php?title=Special:WhatLinksHere/Open_Specifications_Interim_Legal_Notice&limit=500 http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php?title=Special:WhatLinksHere/FI-WARE_Open_Specifications_Legal_Notice&limit=500 What to do: Go to "License" are on top of WIKI page for your GE(s) and update license statement with a text. Attention, this is not really free text as you know, it is sort of standardized...So better just replace old link to "Interrim license "with link to your license. You have received mails on this from TID. So, If you find yourself in "OLD" then cross the water and join us in the "NEW" section... Best wishes Markus --- Below one old mail on this open task. From: fiware-wpa-bounces at lists.fi-ware.eu [mailto:fiware-wpa-bounces at lists.fi-ware.eu] On Behalf Of Juanjo Hierro Sent: Sonntag, 23. Juni 2013 17:03 To: fiware at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] ToDos from now and the following months Dear colleagues, I would like to highlight a number of points that we have to deal with, and we have to concentrate our efforts on, during the following weeks. All these points will be followed up regularly at our joint WPLs/WPAs follow-up confcalls. Staty tuned regarding further clarifications that will come from your WPLs/WPAs or us in the following days. If someone believes there are additional points to add which require a close follow-up, please don't hesitate to comment. Now the list: * FI-WARE Catalogue: * Entries have to comply with the guidelines provided at http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Working_with_the_FI-WARE_catalogue#Guidelines_on_what_to_write * A reference example can be found at: http://catalogue.fi-ware.eu/enablers/application-mashup-wirecloud * Entries which do not comply with the guidelines or whose contents are considered weak will not be made visible and corresponding FI-WARE GEis will therefore not be made available as part of the FI-WARE OIL and Testbed, with potential implications in rejection of costs * Don't forget that FI-WARE GEi have to make public their terms of availability beyond the FI-PPP ("External availability" in "Terms and Conditions") * FI-WARE Legal Notice: * All FI-WARE specifications have to be updated (if not already) to make a reference to any of the two final Legal Notices that have been finally approved: * with implicit patents license: http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/FI-WARE_Open_Specification_Legal_Notice_(implicit_patents_license) * with explicit license on essential patents: http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/FI-WARE_Open_Specification_Legal_Notice_(essential_patents_license) * Detailed instructions about how to update the corresponding sections will be provided * Detailed revision of FI-WARE GEi software and accompanying documentation: * A more in-depth and demanding revision will be carried out from now until end of July, targeted to avoid publication of FI-WARE GEis that we may foresee can receive criticism by developers beyond the research community. * This revision will be carried by programmers from Telefonica and Engineering, other volunteers are welcome. * Note that FI-WARE GEis that have been allowed to be part of FI-WARE r2.2 in our recent submission to the EC may be rejected to be made available in OIL. * In-depth revision of the Architecture and FI-WARE Open Specifications on the wiki * FI-WARE OIL, Testbed and internal Cloud environments setup * The teams in WP10 will have to work hard in order to setup three different FI-WARE Clouds for: * internal developments within FI-WARE (testing of patches, development of new releases) * the FI-WARE Testbed offered to UC projects * the FI-WARE OIL, dealing with quotas * Proper security mechanisms have to be put in place * The deliverables that had to do with Integration Plan and Report will have to be submitted * FI-WARE OIL: recipes for automated deployment of FI-WARE GEi dedicated instances * some FI-WARE GEis may be deployed as a global instance, accessible "as a Service" so that functions can be invoked through well-defined Service End Points and APIs * however, it is highly desirable that some FI-WARE GEis can also be instantiated by application developers on top of the virtual infrastructure they will setup to run their application (Dedicated instances). For this, it is highly recommended that FI-WARE GEi owners support one or several of the following options: * virtual machine images with the FI-WARE GEi properly installed and configured * deployment "recipes" that can be used together with the FI-WARE Cloud tools enabling automated deployment of software on individual VMs * deployment "recipes" that can be used together with the FI-WARE Cloud Blueprint management tools * webinars training on how to build "recipes" have to be organized and run * FI-WARE OIL/Testbed and GEis Support * A JIRA environment will be setup per FI-WARE GEi and for each of the three environments defined above (internal, FI-WARE Testbed and FI-WARE OIL) * A workflow will be defined regarding how tickets can be issued, monitored and resolved. * Access to the corresponding JIRA should be made available from the FI-WARE Catalogue * Generation of training material * WP9 will provide an eLearning and webinar platform which will be adopted as main vehicle for providing training contents * FI-WARE GEi owners will be requested to prepare training material targeted to developers. At least one recorded webinar should be made available per FI-WARE GEi * Organization of Campus Party * There will be a 1-hour session at the main starge of the Campus Party, either on Monday afternoon or Tuesday (most likely this second), where the FI-WARE OIL will be announced. Tentatively, the structure of this session might be (not necessarily in this order): * 15' of someone from the Kroes cabinet that will elaborate on the FI-PPP and will announce launch of the FI-WARE OIL * 15' of keynote speech from some reputed person in the Developers' Community endorsing the initiative (and helping to attract audience :-) * 30' of some sort of panel involving executives from some of the major industry partners (maybe they seating in sofas at the stage and someone acting as chairing/interviewer) * A number of workshops should be programmed, targeted to architects and developers and trying to cover programming practices/exercises that enable attendees to make "hands on" the technology: * Currently we have secured 4 2-hours slot workshops in the workshop area of the Campus Party booked for us. We had initially asked for 6 but seems to be not feasible and I'm trying to negotiate for 5. * Following are the workshops that we have currently identified as suitable for the audience of the Campus Party (programmers), we may decide which to go because there may not be enough number of workshop slots: * Cloud (every function provided through the portal, from deployment of Object Storage and individual VMs, through automated deployment of software on top of available VM instances up to the definition and deployment of blueprints) * Context/Data Management platform (combining a comprehensive review of the Context Broker, CEP and BigData GEs) * IoT, focused on how to connect sensors and make measured data available on the FI-WARE OIL * WireCloud * Identity Management and OAuth2-based Access Control to APIs (potentially to be merged with Cloud) * Advanced Middleware * Media-related GEis (subject to availability of GEis coming from FI-INMEDIA) * Advanced 3D and augmented reality (subject to availability of a first version of GEis coming from WeX) * There will be 2 1-hour sessions where we will be able to introduce the FI-PPP, FI-WARE, explain the ambition, main results, etc as well as announce the different challenges. There will be a space for the UC projects to announce their open calls * There will be a booth we will need to agree how to attend so that we can answer people who may come with questions. * We are negotiating a room for FI-WARE internal meetings for about 10 people, with whiteboard and projector. Our intention is that the different chapters may book slots during the Campus Party for them to meet there, therefore having a f2f meeting there. This way, attendance to the Campus Party may work as a kind of plenary meeting. * FI-WARE OIL terms and conditions * Telefonica has circulated a first draft of terms and conditions and legal departments has been asked to come to a final version by end of July. * The technical/business lead of the different FI-WARE partners should approach their legal departments to make sure they understand the whole thing. * The deadline by end of July is unmovable. FI-WARE GEis for which the corresponding owner do not subscribe the terms and conditions available by then will not be published in the FI-WARE OIL. * FI-WARE Backlog * A report on the status regarding revision and clean up of the FI-WARE Backlog will be submitted to the EC and reviewers by end of June. * Teams have to keep going in all regarding APs related to clean up of the FI-WARE Backlog and adoption of Agile practices * FI-WARE State of the Art deliverable: * We have to get it done. * FI-WARE 3rd Party Innovation Enablement: * We have to find out how we can finish a revised version Best regards, -- Juanjo ------------- Product Development and Innovation (PDI) - Telefonica Digital website: www.tid.es email: jhierro at tid.es twitter: twitter.com/JuanjoHierro FI-WARE (European Future Internet Core Platform) Coordinator and Chief Architect You can follow FI-WARE at: website: http://www.fi-ware.eu facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 twitter: http://twitter.com/FIware linkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Nov 18 19:20:11 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 18 Nov 2013 18:20:11 +0000 Subject: [Fiware-apps] some WPL/WPA news Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74A033@DEWDFEMB14A.global.corp.sap> Hello, I share some news, not much here.: 1. Next M33 Review We have a meeting room for the rehearsal. It is Telef?nica's office (Avenue des Arts, 20). Meeting will start at 11:15-12:00. Background info from previous meetings ============================================= This is fixed now: * Rehearsal: 16-17/Dec * Review: 18/Dec The EC conveyed the message that they want to assess the work done on an individual per partner basis (external availability, individual exploitation plans...) to see if the work in some GEis should be discontinued. This will have to be shared by the WPL/WPAs with the members of the chapters. In principle, we expect same attendees as always. Nothing precludes other partners from attending (as Intel did in the past). Suggestion to the WPL/WPA to inform the partners on the focus on the next review in case any want to attend. We will have to prepare a response to Lutz report and present it in the review. AP: All the chapters to prepare for the review an explanation on what they have done in the catalogue since the receipt of Lutz' report. 2. IA Book 2014 We are invited to submit papers to this book. FI-WARE should consider sending one or more contributions. >From the announcement: Authors are invited to submit full or short papers that fall into, or are related to a group of Future Internet subjects and at least one of the networked system and service areas that are listed below. Within the structure of the book, the following topics will be covered: ? Softwarization of Infrastructures for Future Internet ? Future Internet foundations ? Applications and Experimentation More information at http://www.future-internet.eu/fiabook Long ones (12 pages) y short ones (8 pages) Schedule: ? 12th January 2014 - Submission of contributions ? 9th February 2014 - Notification on acceptance ? 18th February 2014 - Camera-ready copies due ? 18th March 2014 - Book publishing (e.g. coordinated with the timing of the FIA Conference 2014 in Athens, Greece 18-20 March 2014) We do not see a previous stage with abstract submission and fear that we could waste time. AP: to check with the lead editors how to deal with this. And also number of contributions they expect from us (only one general overview or one general and several further elaborating on technical chapters, FI-LAB, application to Smart Cities, etc). -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Tue Nov 19 11:20:03 2013 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 19 Nov 2013 10:20:03 +0000 Subject: [Fiware-apps] FW: [Fiware-wpl] Fwd: FP7-ICT - 285248 FI-WARE - Official Invitation to Review Meeting - Brussels, 18th December 2013 In-Reply-To: <528B39B1.4070501@tid.es> References: <528B39B1.4070501@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74A3F0@DEWDFEMB14A.global.corp.sap> Hi colleagues, FYI, see also the objectives of the review, also Lutz Schubert attends as independent expert. Best wishes Markus From: fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] On Behalf Of Juanjo Hierro Sent: Dienstag, 19. November 2013 11:13 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] Fwd: FP7-ICT - 285248 FI-WARE - Official Invitation to Review Meeting - Brussels, 18th December 2013 Hi, Distributed as convenient. Cheers, -- Juanjo ------------- Product Development and Innovation (PDI) - Telefonica Digital website: www.tid.es email: jhierro at tid.es twitter: twitter.com/JuanjoHierro FI-WARE (European Future Internet Core Platform) Coordinator and Chief Architect FI-PPP Architecture Board chairman You can follow FI-WARE at: website: http://www.fi-ware.eu facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 twitter: http://twitter.com/FIware linkedIn: http://www.linkedin.com/groups/FIWARE-4239932 -------- Original Message -------- Subject: FP7-ICT - 285248 FI-WARE - Official Invitation to Review Meeting - Brussels, 18th December 2013 Date: Tue, 19 Nov 2013 07:55:46 +0000 From: To: , CC: , , , , , , , Dear Mr. Hierro, In accordance with Article II.23 of the contract, and as agreed with you recently, I hereby inform you of the Commission's intention to hold a review meeting of the project FP7-ICT-285248 FI-WARE in Brussels, Belgium on 18th December 2013. The meeting will take place in the premises of the European Commission in avenue de Beaulieu, 1160 Brussels Meeting rooms: 18th December 2013, avenue de Beaulieu BU25 0/S2 As agreed with you, the Commission will be assisted by the following independent experts: - Mr Renaud Di Fancesco - Mr Dominic Greenwood - Mrs Man-Sze Li - Mrs Irena Pavlova - Mr Lutz Schubert The objectives of the review are, in particular, to establish: ? the degree of fulfillment of the project work plan for the relevant period and of the related deliverables; ? the continued relevance of the objectives and breakthrough potential with respect to the scientific and industrial state of the art; ? the resources planned and utilized in relation to the achieved progress, in a manner consistent with the principles of economy, efficiency and effectiveness; ? the management procedures and methods of the project; ? the beneficiaries' contributions and integration within the project; ? the expected potential impact in scientific, technologic, economic, competitive and social terms (where relevant), and the plans for the use and dissemination of results. If you have not sent the deliverables for this review period (months 25 to 30) to the European Commission yet, please do so as soon as possible and put the experts (see cc) in copy. Please send us the draft agenda of this meeting before Wednesday 4th December 2013. Please send me the names of the people attending the review Wednesday 11th December 2013. Should you have any questions before the meeting, please do not hesitate to contact me. Thank you for your co-operation. Best Regards, Vanessa Vanhumbeeck European Commission DG CONNECT Unit E3 - Net Innovation Tel.: +32 2 296 49 39 Email: vanessa.vanhumbeeck at ec.europa.eu ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From markus.heller at sap.com Tue Nov 19 11:49:41 2013 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 19 Nov 2013 10:49:41 +0000 Subject: [Fiware-apps] Current State: Emailing: D.1.2.5 - Periodic Report M30 (DRAFT v1) - V3 - WP3.docx Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74A45B@DEWDFEMB14A.global.corp.sap> Hi all, Here I send the current state, please see WORD comments for your Todos. Please use TRACK CHANGES and send back your input asap today. Best wishes Markus -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.5 - Periodic Report M30 (DRAFT v1) - V3 - WP3.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 292547 bytes Desc: D.1.2.5 - Periodic Report M30 (DRAFT v1) - V3 - WP3.docx URL: From lucio at tid.es Wed Nov 20 12:57:59 2013 From: lucio at tid.es (JAVIER LUCIO RUIZ-ANDINO) Date: Wed, 20 Nov 2013 11:57:59 +0000 Subject: [Fiware-apps] 1 WP3 course in Edu Platform, please add In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1A74955F@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1A74955F@DEWDFEMB14A.global.corp.sap> Message-ID: <47E859DB20D4CD4281639C75E324CD8F2F7F0936@EX10-MB2-MAD.hi.inet> Hi, There is an already existing webminar for the business framework including BEMES, Store and RSSS GEs at https://forge.fi-ware.eu/docman/view.php/7/2642/WP3+Business+Framework+Webinar_v1.5.pptx and http://youtu.be/gSebBr-fN5k I think it could be a good candidate to include there. Perhaps iMinds or UPM have already considered to add it or what is your opinion about that? Best regards, Javier De: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] En nombre de Heller, Markus Enviado el: s?bado, 16 de noviembre de 2013 17:53 Para: 'fiware-apps at lists.fi-ware.eu' Asunto: [Fiware-apps] 1 WP3 course in Edu Platform, please add Hi, Please add your input here, since only 1 course is available for our chapter....what about your existing webinars etc or other online courseware-like documentation that can be deployed here... Best wishes Markus [cid:image001.jpg at 01CEE5ED.6F763230] ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 23348 bytes Desc: image001.jpg URL: From markus.heller at sap.com Wed Nov 20 17:11:21 2013 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 20 Nov 2013 16:11:21 +0000 Subject: [Fiware-apps] D.1.2.5 - Periodic Report M30 (DRAFT v1) WP3 overall Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74AFA3@DEWDFEMB14A.global.corp.sap> Hi all, this is the WP3 PPR current state. Please check and send improvements asap for this version. I will send the final version to Javier today EOB in approx. half an hour or so. Then the overall PPR draft can be consolidated and distributed. Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.5 - Periodic Report M30 (DRAFT v1) - SAP - V6 - WP3.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 286979 bytes Desc: D.1.2.5 - Periodic Report M30 (DRAFT v1) - SAP - V6 - WP3.docx URL: From rfernandez at fi.upm.es Wed Nov 20 18:18:39 2013 From: rfernandez at fi.upm.es (=?ISO-8859-1?Q?Rafael_Fern=E1ndez?=) Date: Wed, 20 Nov 2013 18:18:39 +0100 Subject: [Fiware-apps] 1 WP3 course in Edu Platform, please add In-Reply-To: <47E859DB20D4CD4281639C75E324CD8F2F7F0936@EX10-MB2-MAD.hi.inet> References: <393554EDCF801348BC53C7813C6CB73B1A74955F@DEWDFEMB14A.global.corp.sap> <47E859DB20D4CD4281639C75E324CD8F2F7F0936@EX10-MB2-MAD.hi.inet> Message-ID: Hi Markus, Javier, Yes, UPM is currently working on creating the BF course and we'll make it available as soon as possible. We also hope to get the Wirecloud one uploaded by tomorrow. Best regards, Rafa On Wed, Nov 20, 2013 at 12:57 PM, JAVIER LUCIO RUIZ-ANDINO wrote: > > > Hi, > > There is an already existing webminar for the business framework including > BEMES, Store and RSSS GEs at > https://forge.fi-ware.eu/docman/view.php/7/2642/WP3+Business+Framework+Webinar_v1.5.pptxand > http://youtu.be/gSebBr-fN5k > > > > I think it could be a good candidate to include there. Perhaps iMinds or > UPM have already considered to add it or what is your opinion about that? > > > > Best regards, > > Javier > > > > > > *De:* fiware-apps-bounces at lists.fi-ware.eu [mailto: > fiware-apps-bounces at lists.fi-ware.eu] *En nombre de *Heller, Markus > *Enviado el:* s?bado, 16 de noviembre de 2013 17:53 > *Para:* 'fiware-apps at lists.fi-ware.eu' > *Asunto:* [Fiware-apps] 1 WP3 course in Edu Platform, please add > > > > Hi, > > > > Please add your input here, since only 1 course is available for our > chapter?.what about your existing webinars etc or other online > courseware-like documentation that can be deployed here? > > > > Best wishes > > Markus > > > > > > > > > ------------------------------ > > Este mensaje se dirige exclusivamente a su destinatario. Puede consultar > nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace > situado m?s abajo. > This message is intended exclusively for its addressee. We only send and > receive email on the basis of the terms set out at: > http://www.tid.es/ES/PAGINAS/disclaimer.aspx > > _______________________________________________ > Fiware-apps mailing list > Fiware-apps at lists.fi-ware.eu > https://lists.fi-ware.eu/listinfo/fiware-apps > > -- *Dr. Rafael Fern?ndez* Dept. Lenguajes y Sistemas Inform?ticos e Ingenier?a de Software Facultad de Inform?tica - Universidad Polit?cnica de Madrid Campus Internacional de Excelencia Montegancedo 28660 - Boadilla del Monte, Madrid Spain -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 23348 bytes Desc: not available URL: From jsoriano at fi.upm.es Wed Nov 20 20:56:25 2013 From: jsoriano at fi.upm.es (Javier Soriano (FI-UPM)) Date: Wed, 20 Nov 2013 20:56:25 +0100 Subject: [Fiware-apps] 1 WP3 course in Edu Platform, please add In-Reply-To: References: <393554EDCF801348BC53C7813C6CB73B1A74955F@DEWDFEMB14A.global.corp.sap> <47E859DB20D4CD4281639C75E324CD8F2F7F0936@EX10-MB2-MAD.hi.inet> Message-ID: Dear Markus, dear all, This is just to clarify that we have started to work on the BF course today, after having had a short telco with Javier Lucio, from Telef?nica. It takes some time to understand the tool and the constraints imposed in terms of functionality, formats, etc. and we acquired some experience while creating the Wirecloud course, so we can do this on behalf of T3.3 if our colleagues from iMinds agree on it. So I just want to check with them whether they are fine with this approach or not. Best regards, Javier 2013/11/20 Rafael Fern?ndez > Hi Markus, Javier, > > Yes, UPM is currently working on creating the BF course and we'll make it > available as soon as possible. We also hope to get the Wirecloud one > uploaded by tomorrow. > > Best regards, > Rafa > > > On Wed, Nov 20, 2013 at 12:57 PM, JAVIER LUCIO RUIZ-ANDINO wrote: > >> >> >> Hi, >> >> There is an already existing webminar for the business framework >> including BEMES, Store and RSSS GEs at >> https://forge.fi-ware.eu/docman/view.php/7/2642/WP3+Business+Framework+Webinar_v1.5.pptxand >> http://youtu.be/gSebBr-fN5k >> >> >> >> I think it could be a good candidate to include there. Perhaps iMinds or >> UPM have already considered to add it or what is your opinion about that? >> >> >> >> Best regards, >> >> Javier >> >> >> >> >> >> *De:* fiware-apps-bounces at lists.fi-ware.eu [mailto: >> fiware-apps-bounces at lists.fi-ware.eu] *En nombre de *Heller, Markus >> *Enviado el:* s?bado, 16 de noviembre de 2013 17:53 >> *Para:* 'fiware-apps at lists.fi-ware.eu' >> *Asunto:* [Fiware-apps] 1 WP3 course in Edu Platform, please add >> >> >> >> Hi, >> >> >> >> Please add your input here, since only 1 course is available for our >> chapter?.what about your existing webinars etc or other online >> courseware-like documentation that can be deployed here? >> >> >> >> Best wishes >> >> Markus >> >> >> >> >> >> >> >> >> ------------------------------ >> >> Este mensaje se dirige exclusivamente a su destinatario. Puede consultar >> nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace >> situado m?s abajo. >> This message is intended exclusively for its addressee. We only send and >> receive email on the basis of the terms set out at: >> http://www.tid.es/ES/PAGINAS/disclaimer.aspx >> >> _______________________________________________ >> Fiware-apps mailing list >> Fiware-apps at lists.fi-ware.eu >> https://lists.fi-ware.eu/listinfo/fiware-apps >> >> > > > -- > *Dr. Rafael Fern?ndez* > Dept. Lenguajes y Sistemas Inform?ticos e Ingenier?a de Software > Facultad de Inform?tica - Universidad Polit?cnica de Madrid > Campus Internacional de Excelencia Montegancedo > 28660 - Boadilla del Monte, Madrid > Spain > > _______________________________________________ > Fiware-apps mailing list > Fiware-apps at lists.fi-ware.eu > https://lists.fi-ware.eu/listinfo/fiware-apps > > -- -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 23348 bytes Desc: not available URL: From markus.heller at sap.com Wed Nov 20 21:55:36 2013 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 20 Nov 2013 20:55:36 +0000 Subject: [Fiware-apps] FW: Input from WP3 for Periodic Report M25-M30 In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1A74B451@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1A74B451@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74B46C@DEWDFEMB14A.global.corp.sap> FYI From: Heller, Markus Sent: Mittwoch, 20. November 2013 21:54 To: JAVIER DE PEDRO SANCHEZ Cc: subsidies at tid.es Subject: FW: Input from WP3 for Periodic Report M25-M30 Dear Javier, colleagues, I attach the WP3 chapter contribution for the PPR M25-M30. It includes the input of all partners including SAP and is the "official WP3 submission" to you (attachment). [...] Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.5 - Periodic Report M30 (DRAFT v1) - V07 - WP03.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 280384 bytes Desc: D.1.2.5 - Periodic Report M30 (DRAFT v1) - V07 - WP03.docx URL: From markus.heller at sap.com Thu Nov 21 10:52:50 2013 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 21 Nov 2013 09:52:50 +0000 Subject: [Fiware-apps] [Fiware-wpl] D2.1.6-M30 Requirements Backlog open for comments - delivery tomorrow 21.Nov 11:00 AM In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911CD7F@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90B8911CD7F@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74C092@DEWDFEMB14A.global.corp.sap> Hi all, I forward this ZIP from Manuel with the contents sent to EC (not the really final one, but close). Please extra note: there is a PDF in the ZIP (besides the dashboards per chapter): it contains some definition of the C-xy metrics. The data basis is frozen for the report, the whole deliverable is planned to be delivered today, so no action needed on this. Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: Data from Manuel on backlog.zip Type: application/x-zip-compressed Size: 2247116 bytes Desc: Data from Manuel on backlog.zip URL: From markus.heller at sap.com Thu Nov 21 14:25:11 2013 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 21 Nov 2013 13:25:11 +0000 Subject: [Fiware-apps] FW: D2.1.6-M30 - Just Delivered!! In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90B8912C7F1@EX10-MB1-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90B8912C7F1@EX10-MB1-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74D5BF@DEWDFEMB14A.global.corp.sap> Hi, As announced, here we are, this is the final version submitted for D2.1.6 M30 (backlog) from Manuel. Best wishes Markus From: fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Donnerstag, 21. November 2013 12:30 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] D2.1.6-M30 - Just Delivered!! Dear Partners, Let me inform you that D2.1.6-M30 has just been delivered. https://forge.fi-ware.eu/docman/view.php/7/3113/D2.1.6-M30+Requirements+Backlog.zip Thanks all for cooperation! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From markus.heller at sap.com Mon Nov 25 18:48:35 2013 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 25 Nov 2013 17:48:35 +0000 Subject: [Fiware-apps] News from WPL/WPA Telco Message-ID: <393554EDCF801348BC53C7813C6CB73B1A74ED09@DEWDFEMB14A.global.corp.sap> Hi All, here is send some preliminary news from WPL/WPA telco for you. Please note that for some topics separate e-mails from colleagues are planned and will be distributed soon... My mail here is more to make you aware what is under discussion since we are now in a "fast-move-mode" a bit... please rely on the other mails for strict deadlines etc.... FI-WARE Catalog Entries for Review / External availability: Reviewers and EC perform the assessment only after end of this month November (!). Until then, you can change and add. - A separate mail planned, if I recall right, on this topic for distribution - FI-WARE-Catalog: Terms and Conditions and Licenses information. Junajo assumes that extra care might be spent here by reviewers (!) - Question for Catalog: How will reviewers consume it? Paper or online only? Arian said they will check catalog online....but do not rely on this info IMHO. Review 18.12.: - Review Agenda Draft will be sent by Juanjo/Miguel to EC this week, including a slot for exploitation questions per GE owners (they can attend then if needed), Answer by EC requested until 11.12 (one week ahead). SW-Release / Catalog uploads of software ZIPs for the Review: - Software information / ZIPs not always up-to-date (some "newest" releases date from mid of 2012...) --> update/upload of new software there is needed to let the _reviewers_ see that we have very "fresh tomatoes" to offer... - An Email will be sent from TID (Miguel) to clarify procedures & deadlines what needs to be done - JH: In general, every partner can update the SW and documents for its Catalog areas without waiting until the end of major release. But it will only be listed to public if the reviews are completed. If you add manuals before a date given by TID then it can be public before the review Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: From thorsten.sandfuchs at sap.com Tue Nov 26 13:03:05 2013 From: thorsten.sandfuchs at sap.com (Sandfuchs, Thorsten) Date: Tue, 26 Nov 2013 12:03:05 +0000 Subject: [Fiware-apps] News from WPL/WPA Telco In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1A74ED09@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1A74ED09@DEWDFEMB14A.global.corp.sap> Message-ID: <2981E9D6242FCF47ADC9B5DBA5DFD66486A86A34@DEWDFEMB11B.global.corp.sap> Dear colleagues, let me add some thoughts here: 1. Catalog content - in general ? I want to emphasize that you should REALLY focus on this within this week. These entries are rather low-level to fix and it poses a high effect towards the outside. And as we have some internal approval barriers, I would strongly advise for a solution implemented today or tomorrow to allow for this approval process to finalize in time. 2. Catalog content - T&C Please see the attached WORD file with open questions on T&C for the partners: UPM, THALES, TI, ECE, DT 3. Catalog entries - missing GEs ? BEMES - try to fix all pending editorial changes and comply to the given rules of the approvers, otherwise you will have a hard time defending your GE in front of the review 4. Catalog entries - content I only briefly looked over them - please use the word template in order to check spelling and grammar mistakes and correct them! 5. Catalog entries - download sections PLEASE update the download sections - e.g. it gives very bad impression on your contributions, which actually is not the case - e.g for UPM: [cid:image001.jpg at 01CEEAA7.D7874E90] ? Is this really the "latest" version that is linked here - why is this even called "1.1.0"? Where do I find addtionaly and "current" downloads - we are in sprint/release 3.2 and there is not even 2.X mentioned.... ? I didn't to a checklist for all partners please work on this autonomously for EVERY component. 6. Catalog - all other tabs In general - check all tabs of the catalogue and work on the content as much as possible to achieve most updated content and links and information! Thanks for listening in :) /Thorsten From: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] On Behalf Of Heller, Markus Sent: Montag, 25. November 2013 18:49 To: 'fiware-apps at lists.fi-ware.eu' Subject: [Fiware-apps] News from WPL/WPA Telco Hi All, here is send some preliminary news from WPL/WPA telco for you. Please note that for some topics separate e-mails from colleagues are planned and will be distributed soon... My mail here is more to make you aware what is under discussion since we are now in a "fast-move-mode" a bit... please rely on the other mails for strict deadlines etc.... FI-WARE Catalog Entries for Review / External availability: Reviewers and EC perform the assessment only after end of this month November (!). Until then, you can change and add. - A separate mail planned, if I recall right, on this topic for distribution - FI-WARE-Catalog: Terms and Conditions and Licenses information. Junajo assumes that extra care might be spent here by reviewers (!) - Question for Catalog: How will reviewers consume it? Paper or online only? Arian said they will check catalog online....but do not rely on this info IMHO. Review 18.12.: - Review Agenda Draft will be sent by Juanjo/Miguel to EC this week, including a slot for exploitation questions per GE owners (they can attend then if needed), Answer by EC requested until 11.12 (one week ahead). SW-Release / Catalog uploads of software ZIPs for the Review: - Software information / ZIPs not always up-to-date (some "newest" releases date from mid of 2012...) --> update/upload of new software there is needed to let the _reviewers_ see that we have very "fresh tomatoes" to offer... - An Email will be sent from TID (Miguel) to clarify procedures & deadlines what needs to be done - JH: In general, every partner can update the SW and documents for its Catalog areas without waiting until the end of major release. But it will only be listed to public if the reviews are completed. If you add manuals before a date given by TID then it can be public before the review Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 14171 bytes Desc: image001.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: catalogue_wp3_2013-11-25.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 59685 bytes Desc: catalogue_wp3_2013-11-25.docx URL: From thorsten.sandfuchs at sap.com Wed Nov 27 08:29:01 2013 From: thorsten.sandfuchs at sap.com (Sandfuchs, Thorsten) Date: Wed, 27 Nov 2013 07:29:01 +0000 Subject: [Fiware-apps] News from WPL/WPA Telco - ACTIONS with due date THIS WEEK! Message-ID: <2981E9D6242FCF47ADC9B5DBA5DFD66486A887DC@DEWDFEMB11B.global.corp.sap> Another point I want to stress is the email send around by markus already (again attached) - there are still a very high number of components linking to the "OLD" terms and conditions of open specifications: ? 19 pages link still to either the one or the other old T&C ? For 16 pages there was a transition to the "new" T&C Related overview pages to ease up click-through & fixing this: NEW: http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Special:WhatLinksHere/FI-WARE_Open_Specification_Legal_Notice_(essential_patents_license)?limit=500 http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Special:WhatLinksHere/FI-WARE_Open_Specification_Legal_Notice_(implicit_patents_license)?limit=500 OLD: http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php?title=Special:WhatLinksHere/Open_Specifications_Interim_Legal_Notice&limit=500 http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php?title=Special:WhatLinksHere/FI-WARE_Open_Specifications_Legal_Notice&limit=500 It is really easy: 1. Click on both of the link in "OLD" - check if your component still linking wrongly licencies 2. Change the link as appropriate to one or the other existing (if you don't know which one applies to "you" - ask your legal contact, there was a consensus reacht already in april by all legal contact which one to chose for your component!) I'm resending this complete email now ith high priority - if you didn't pay attention to the tasks below so far, please reconsider doing them And please pay attention to the emails send by juanjo and the colleagues to fiware@ as well during this week - there is a high sense of urgency behind all this!! Best /Thorsten From: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] On Behalf Of Sandfuchs, Thorsten Sent: Dienstag, 26. November 2013 13:03 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Subject: Re: [Fiware-apps] News from WPL/WPA Telco Dear colleagues, let me add some thoughts here: 1. Catalog content - in general ? I want to emphasize that you should REALLY focus on this within this week. These entries are rather low-level to fix and it poses a high effect towards the outside. And as we have some internal approval barriers, I would strongly advise for a solution implemented today or tomorrow to allow for this approval process to finalize in time. 2. Catalog content - T&C Please see the attached WORD file with open questions on T&C for the partners: UPM, THALES, TI, ECE, DT 3. Catalog entries - missing GEs ? BEMES - try to fix all pending editorial changes and comply to the given rules of the approvers, otherwise you will have a hard time defending your GE in front of the review 4. Catalog entries - content I only briefly looked over them - please use the word template in order to check spelling and grammar mistakes and correct them! 5. Catalog entries - download sections PLEASE update the download sections - e.g. it gives very bad impression on your contributions, which actually is not the case - e.g for UPM: [cid:image001.jpg at 01CEEB4A.BC649A20] ? Is this really the "latest" version that is linked here - why is this even called "1.1.0"? Where do I find addtionaly and "current" downloads - we are in sprint/release 3.2 and there is not even 2.X mentioned.... ? I didn't to a checklist for all partners please work on this autonomously for EVERY component. 6. Catalog - all other tabs In general - check all tabs of the catalogue and work on the content as much as possible to achieve most updated content and links and information! Thanks for listening in :) /Thorsten From: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] On Behalf Of Heller, Markus Sent: Montag, 25. November 2013 18:49 To: 'fiware-apps at lists.fi-ware.eu' Subject: [Fiware-apps] News from WPL/WPA Telco Hi All, here is send some preliminary news from WPL/WPA telco for you. Please note that for some topics separate e-mails from colleagues are planned and will be distributed soon... My mail here is more to make you aware what is under discussion since we are now in a "fast-move-mode" a bit... please rely on the other mails for strict deadlines etc.... FI-WARE Catalog Entries for Review / External availability: Reviewers and EC perform the assessment only after end of this month November (!). Until then, you can change and add. - A separate mail planned, if I recall right, on this topic for distribution - FI-WARE-Catalog: Terms and Conditions and Licenses information. Junajo assumes that extra care might be spent here by reviewers (!) - Question for Catalog: How will reviewers consume it? Paper or online only? Arian said they will check catalog online....but do not rely on this info IMHO. Review 18.12.: - Review Agenda Draft will be sent by Juanjo/Miguel to EC this week, including a slot for exploitation questions per GE owners (they can attend then if needed), Answer by EC requested until 11.12 (one week ahead). SW-Release / Catalog uploads of software ZIPs for the Review: - Software information / ZIPs not always up-to-date (some "newest" releases date from mid of 2012...) --> update/upload of new software there is needed to let the _reviewers_ see that we have very "fresh tomatoes" to offer... - An Email will be sent from TID (Miguel) to clarify procedures & deadlines what needs to be done - JH: In general, every partner can update the SW and documents for its Catalog areas without waiting until the end of major release. But it will only be listed to public if the reviews are completed. If you add manuals before a date given by TID then it can be public before the review Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 14171 bytes Desc: image001.jpg URL: -------------- next part -------------- An embedded message was scrubbed... From: "Heller, Markus" Subject: [Fiware-apps] WP3: Check your License open Spec (implcit/essential) correct.....open spec legal notice usage in fi-ware wiki Date: Mon, 18 Nov 2013 18:12:48 +0000 Size: 61512 URL: From thorsten.sandfuchs at sap.com Thu Nov 28 10:04:07 2013 From: thorsten.sandfuchs at sap.com (Sandfuchs, Thorsten) Date: Thu, 28 Nov 2013 09:04:07 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call In-Reply-To: <2981E9D6242FCF47ADC9B5DBA5DFD6646101F278@DEWDFEMB11A.global.corp.sap> References: <2981E9D6242FCF47ADC9B5DBA5DFD6646101F278@DEWDFEMB11A.global.corp.sap> Message-ID: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8A805@DEWDFEMB11B.global.corp.sap> Hi, please use the following dial in to access the today's call: Web conference: https://sap.emea.pgiconnect.com/sandfuchs Participant Code: 651 183 4120 Country Number Blackberry Friendly Format Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x6511834120# tel:+4969222210764;6511834120# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x6511834120# tel:+431253021750;6511834120# France, Paris tel:+33170701777 tel:+33170701777x6511834120# tel:+33170701777;6511834120# Italy, Milan tel:+390236009839 tel:+390236009839x6511834120# tel:+390236009839;6511834120# Spain, Madrid tel:+34917699443 tel:+34917699443x6511834120# tel:+34917699443;6511834120# Switzerland, Zurich tel:+41434569248 tel:+41434569248x6511834120# tel:+41434569248;6511834120# UK, London tel:+442033645639 tel:+442033645639x6511834120# tel:+442033645639;6511834120# Oversea Australia, Sydney tel:+61290090688 tel:+61290090688x6511834120# tel:+61290090688;6511834120# India, Bangalore tel:+918061275055 tel:+918061275055x6511834120# tel:+918061275055;6511834120# USA, New York tel:+16464340499 tel:+16464340499x6511834120# tel:+16464340499;6511834120# -----Original Appointment----- From: Heller, Markus [mailto:markus.heller at sap.com] Sent: Donnerstag, 25. April 2013 23:18 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Cc: Ughetti Marco; Ronco Enrico; Klein, Andreas; Leidig, Torsten Subject: [Fiware-apps] FI-WARE: WP3 Call When: Donnerstag, 28. November 2013 10:00-11:00 (UTC+01:00) Amsterdam, Berlin, Bern, Rome, Stockholm, Vienna. Where: SAP Connect from Markus Dear FI-WARE WP3 colleagues, After moving to a morning slot now, I invite you to our WP3 Call on Thursdays 10-11. Please use the dial-in info below to dial-in. Best wishes Markus ---- << File: ATT00001.txt >> -------------- next part -------------- An HTML attachment was scrubbed... URL: From andreas.klein at sap.com Thu Nov 28 11:06:56 2013 From: andreas.klein at sap.com (Klein, Andreas) Date: Thu, 28 Nov 2013 10:06:56 +0000 Subject: [Fiware-apps] WP3 Meeting Minutes 2013-11-28 Message-ID: <556F697ADC3400408FBBCF7C6040979D6037D8F5@DEWDFEMB15B.global.corp.sap> Dear WP3 partners, please find the minutes of today's WP3 call in the docman: https://forge.fi-ware.eu/docman/view.php/12/3146/2013_11_28_FI-WARE_WP3_Minutes.doc Best regards Andreas Andreas Klein SAP AG SAP Research Center Karlsruhe Vincenz-Priessnitz-Strasse 1 D - 76131 Karlsruhe T +49-6227-7-52554 -------------- next part -------------- An HTML attachment was scrubbed... URL: From thorsten.sandfuchs at sap.com Fri Nov 29 07:59:33 2013 From: thorsten.sandfuchs at sap.com (Sandfuchs, Thorsten) Date: Fri, 29 Nov 2013 06:59:33 +0000 Subject: [Fiware-apps] FW: FI-WARE: Periodic report M30 - Third iteration In-Reply-To: <77A22C1085494D48B4018F06A40DB2C730047298@EX10-MB2-MAD.hi.inet> References: <77A22C1085494D48B4018F06A40DB2C730047298@EX10-MB2-MAD.hi.inet> Message-ID: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8C1DA@DEWDFEMB11B.global.corp.sap> Dear colleagues, please 1. Check if you input provided was reflected as it should have in the current version of the M30 Periodic report 2. Send changes directly to me and Markus Heller in at least CC. We will compile the final version for Javier on Monday noon, therefore please work until then on this task the latest. Thanks, /Thorsten From: fiware-wpa-bounces at lists.fi-ware.eu [mailto:fiware-wpa-bounces at lists.fi-ware.eu] On Behalf Of JAVIER DE PEDRO SANCHEZ Sent: Donnerstag, 28. November 2013 23:21 To: 'fiware-administrative at lists.fi-ware.eu'; 'fiware-wpl at lists.fi-ware.eu'; fiware-wpa at lists.fi-ware.eu Cc: subsidies at tid.es Subject: [Fiware-wpa] FI-WARE: Periodic report M30 - Third iteration Importance: High Dear all, please find the second draft version of the Periodic Report M30. Please check it and contact with the WPL if you want/need to update something. We?ll only accept changes from WPL. @WPL: Please if needed, send an updated version with track changes activated to me (using the attached version). Deadline: Monday the 2nd of December, EOB. Note: The following partners have ?No input from partner? or ?No activities? or ?No justification? (regarding their PM in the DoW by task) No input from partner 02 ? SAP 07 - FT 12 ? TRDF 14 ? ATOS 15 ? E-IIS 16 ? ALU-I 19 - INTEL 22 ? INRIA 23 - UPM 32 ? IMINDS 31 ? EPROS 36 - ADMINO No activities 01- TID 03- IBM-IL 06 ? TI 07 - FT 11 - DT 12 ? TRDF 15 ? E-IIS 16 ? ALU-I 18 ? SIEMENS 19 - INTEL 23 ? UPM 28 ? ZHAW 29 ? DFKI 30 ? USAAR-CISPA 31 - EPROS 32 - IMINDS No justification provided 01 ? TID 02 - SAP 03 ? IBM-IL 05 ? THALES 12 ?TRDF 14 ? ATOS 15 ? E-IIS 16 ? ALU-I 22 ? INRIA 23 ? UPM 28 - ZHAW 30 ? USAAR-CISPA 31 ? EPROS 34 - PLAYSIGN BR Javier. _____ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.5 - Periodic Report M30 (DRAFT v2).docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 1422035 bytes Desc: D.1.2.5 - Periodic Report M30 (DRAFT v2).docx URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From thorsten.sandfuchs at sap.com Fri Nov 29 08:29:12 2013 From: thorsten.sandfuchs at sap.com (Sandfuchs, Thorsten) Date: Fri, 29 Nov 2013 07:29:12 +0000 Subject: [Fiware-apps] FI-WARE: Periodic report M30 - Third iteration In-Reply-To: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8C1DA@DEWDFEMB11B.global.corp.sap> References: <77A22C1085494D48B4018F06A40DB2C730047298@EX10-MB2-MAD.hi.inet> <2981E9D6242FCF47ADC9B5DBA5DFD66486A8C1DA@DEWDFEMB11B.global.corp.sap> Message-ID: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8C279@DEWDFEMB11B.global.corp.sap> Please use ?track-changes? in any case like Javier requested! ? From: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] On Behalf Of Sandfuchs, Thorsten Sent: Freitag, 29. November 2013 08:00 To: 'fiware-apps at lists.fi-ware.eu' Subject: [Fiware-apps] FW: FI-WARE: Periodic report M30 - Third iteration Importance: High Dear colleagues, please 1. Check if you input provided was reflected as it should have in the current version of the M30 Periodic report 2. Send changes directly to me and Markus Heller in at least CC. We will compile the final version for Javier on Monday noon, therefore please work until then on this task the latest. Thanks, /Thorsten From: fiware-wpa-bounces at lists.fi-ware.eu [mailto:fiware-wpa-bounces at lists.fi-ware.eu] On Behalf Of JAVIER DE PEDRO SANCHEZ Sent: Donnerstag, 28. November 2013 23:21 To: 'fiware-administrative at lists.fi-ware.eu'; 'fiware-wpl at lists.fi-ware.eu'; fiware-wpa at lists.fi-ware.eu Cc: subsidies at tid.es Subject: [Fiware-wpa] FI-WARE: Periodic report M30 - Third iteration Importance: High Dear all, please find the second draft version of the Periodic Report M30. Please check it and contact with the WPL if you want/need to update something. We?ll only accept changes from WPL. @WPL: Please if needed, send an updated version with track changes activated to me (using the attached version). Deadline: Monday the 2nd of December, EOB. Note: The following partners have ?No input from partner? or ?No activities? or ?No justification? (regarding their PM in the DoW by task) No input from partner 02 ? SAP 07 - FT 12 ? TRDF 14 ? ATOS 15 ? E-IIS 16 ? ALU-I 19 - INTEL 22 ? INRIA 23 - UPM 32 ? IMINDS 31 ? EPROS 36 - ADMINO No activities 01- TID 03- IBM-IL 06 ? TI 07 - FT 11 - DT 12 ? TRDF 15 ? E-IIS 16 ? ALU-I 18 ? SIEMENS 19 - INTEL 23 ? UPM 28 ? ZHAW 29 ? DFKI 30 ? USAAR-CISPA 31 - EPROS 32 - IMINDS No justification provided 01 ? TID 02 - SAP 03 ? IBM-IL 05 ? THALES 12 ?TRDF 14 ? ATOS 15 ? E-IIS 16 ? ALU-I 22 ? INRIA 23 ? UPM 28 - ZHAW 30 ? USAAR-CISPA 31 ? EPROS 34 - PLAYSIGN BR Javier. ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From thorsten.sandfuchs at sap.com Fri Nov 29 11:16:28 2013 From: thorsten.sandfuchs at sap.com (Sandfuchs, Thorsten) Date: Fri, 29 Nov 2013 10:16:28 +0000 Subject: [Fiware-apps] participation in the M30 review meeting in person Message-ID: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8CAA9@DEWDFEMB11B.global.corp.sap> Dear colleagues, FYI: the hard deadline as announced by project management (TID) for registering your personal participation on the M30 review meeting in Brussels will be next week on the 03.12.2013 Best, /Thorsten -- Thorsten Sandfuchs SAP AG | Vincenz-Priessnitz-Strasse 1 | D-76131 Karlsruhe, Germany | www.sap.com Pflichtangaben/Mandatory Disclosure Statements: http://www.sap.com/company/legal/impressum.epx Diese E-Mail kann Betriebs- oder Gesch?ftsgeheimnisse oder sonstige vertrauliche Informationen enthalten. Sollten Sie diese E-Mail irrt?mlich erhalten haben, ist Ihnen eine Kenntnisnahme des Inhalts, eine Vervielf?ltigung oder Weitergabe der E-Mail ausdr?cklich untersagt. Bitte benachrichtigen Sie uns und vernichten Sie die empfangene E-Mail. Vielen Dank. This e-mail may contain trade secrets or privileged, undisclosed, or otherwise confidential information. If you have received this e-mail in error, you are hereby notified that any review, copying, or distribution of it is strictly prohibited. Please inform us immediately and destroy the original transmittal. Thank you for your cooperation. Please consider the environment before printing this mail! -------------- next part -------------- An HTML attachment was scrubbed... URL: From thorsten.sandfuchs at sap.com Fri Nov 29 12:30:37 2013 From: thorsten.sandfuchs at sap.com (Sandfuchs, Thorsten) Date: Fri, 29 Nov 2013 11:30:37 +0000 Subject: [Fiware-apps] participation in the M30 review meeting in person In-Reply-To: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8CAA9@DEWDFEMB11B.global.corp.sap> References: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8CAA9@DEWDFEMB11B.global.corp.sap> Message-ID: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8CB8A@DEWDFEMB11B.global.corp.sap> Correction: the deadline for registration is the 10.12.2013 Best, /Thorsten From: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] On Behalf Of Sandfuchs, Thorsten Sent: Freitag, 29. November 2013 11:16 To: 'fiware-apps at lists.fi-ware.eu' Subject: [Fiware-apps] participation in the M30 review meeting in person Dear colleagues, FYI: the hard deadline as announced by project management (TID) for registering your personal participation on the M30 review meeting in Brussels will be next week on the 03.12.2013 Best, /Thorsten -- Thorsten Sandfuchs SAP AG | Vincenz-Priessnitz-Strasse 1 | D-76131 Karlsruhe, Germany | www.sap.com Pflichtangaben/Mandatory Disclosure Statements: http://www.sap.com/company/legal/impressum.epx Diese E-Mail kann Betriebs- oder Gesch?ftsgeheimnisse oder sonstige vertrauliche Informationen enthalten. Sollten Sie diese E-Mail irrt?mlich erhalten haben, ist Ihnen eine Kenntnisnahme des Inhalts, eine Vervielf?ltigung oder Weitergabe der E-Mail ausdr?cklich untersagt. Bitte benachrichtigen Sie uns und vernichten Sie die empfangene E-Mail. Vielen Dank. This e-mail may contain trade secrets or privileged, undisclosed, or otherwise confidential information. If you have received this e-mail in error, you are hereby notified that any review, copying, or distribution of it is strictly prohibited. Please inform us immediately and destroy the original transmittal. Thank you for your cooperation. Please consider the environment before printing this mail! -------------- next part -------------- An HTML attachment was scrubbed... URL: From thorsten.sandfuchs at sap.com Fri Nov 29 12:51:40 2013 From: thorsten.sandfuchs at sap.com (Sandfuchs, Thorsten) Date: Fri, 29 Nov 2013 11:51:40 +0000 Subject: [Fiware-apps] FW: Agile dynamic : Sprint 3.2.2 Closing -LAST CALL In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90B89139A34@EX10-MB1-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90B89139A34@EX10-MB1-MAD.hi.inet> Message-ID: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8CC19@DEWDFEMB11B.global.corp.sap> Dear colleagues, please close/reschedule or do whatever needed in order to get the backlog in a good shape by the end of today. Teams having red items: - BEMES - Mediation Thanks, /Thorsten From: fiware-wpa-bounces at lists.fi-ware.eu [mailto:fiware-wpa-bounces at lists.fi-ware.eu] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Freitag, 29. November 2013 12:16 To: fiware-ge-owners at lists.fi-ware.eu Cc: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] Agile dynamic : Sprint 3.2.2 Closing -LAST CALL Dear Partners, Let me remind you of the sprint closing, which is scheduled for today. The unique action needed is to CLOSE those items already finished. I'll be getting a snapshot this afternoon at 6:00 PM. On Monday I'll be informing WP leaders on the chapter performance. Thanks for cooperation! Find the links to today's snapshot below. https://forge.fi-ware.eu/docman/view.php/27/3151/FIWARE.backlog.apps.dashboard.20131129.xlsx https://forge.fi-ware.eu/docman/view.php/27/3152/FIWARE.backlog.cloud.dashboard.20131129.xlsx https://forge.fi-ware.eu/docman/view.php/27/3155/FIWARE.backlog.iot.dashboard.20131129.xlsx https://forge.fi-ware.eu/docman/view.php/27/3153/FIWARE.backlog.data.dashboard.20131129.xlsx https://forge.fi-ware.eu/docman/view.php/27/3154/FIWARE.backlog.i2nd.dashboard.20131129.xlsx https://forge.fi-ware.eu/docman/view.php/27/3156/FIWARE.backlog.security.dashboard.20131129.xlsx If anything, please, don't hesitate to let me know. Have a nice weekend! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From thorsten.sandfuchs at sap.com Fri Nov 29 18:22:13 2013 From: thorsten.sandfuchs at sap.com (Sandfuchs, Thorsten) Date: Fri, 29 Nov 2013 17:22:13 +0000 Subject: [Fiware-apps] News from WPL/WPA Telco - ACTIONS with due date THIS WEEK! In-Reply-To: <2981E9D6242FCF47ADC9B5DBA5DFD66486A887DC@DEWDFEMB11B.global.corp.sap> References: <2981E9D6242FCF47ADC9B5DBA5DFD66486A887DC@DEWDFEMB11B.global.corp.sap> Message-ID: <2981E9D6242FCF47ADC9B5DBA5DFD66486A8D3E7@DEWDFEMB11B.global.corp.sap> Dear team, thank you all for your great effort and dedication to make this happen - I think we managed to get a lot "online" changes within this week. - The catalog actually looks much better and more reflecting the current status - The old legal notice for our chapter is only linked by the "ServiceComposition" of EAB and the https://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/FIWARE.OpenSpecification.Apps.BusinessCalculator - You managed to bring the Business Modeller & calculator to the catalogue and through the internal reviews - ... any many more small changes. BRAVO! Keep up the good work & wish you a nice weekend! /Thorsten From: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] On Behalf Of Sandfuchs, Thorsten Sent: Mittwoch, 27. November 2013 08:29 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Subject: Re: [Fiware-apps] News from WPL/WPA Telco - ACTIONS with due date THIS WEEK! Importance: High Another point I want to stress is the email send around by markus already (again attached) - there are still a very high number of components linking to the "OLD" terms and conditions of open specifications: ? 19 pages link still to either the one or the other old T&C ? For 16 pages there was a transition to the "new" T&C Related overview pages to ease up click-through & fixing this: NEW: http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Special:WhatLinksHere/FI-WARE_Open_Specification_Legal_Notice_(essential_patents_license)?limit=500 http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Special:WhatLinksHere/FI-WARE_Open_Specification_Legal_Notice_(implicit_patents_license)?limit=500 OLD: http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php?title=Special:WhatLinksHere/Open_Specifications_Interim_Legal_Notice&limit=500 http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php?title=Special:WhatLinksHere/FI-WARE_Open_Specifications_Legal_Notice&limit=500 It is really easy: 1. Click on both of the link in "OLD" - check if your component still linking wrongly licencies 2. Change the link as appropriate to one or the other existing (if you don't know which one applies to "you" - ask your legal contact, there was a consensus reacht already in april by all legal contact which one to chose for your component!) I'm resending this complete email now ith high priority - if you didn't pay attention to the tasks below so far, please reconsider doing them And please pay attention to the emails send by juanjo and the colleagues to fiware@ as well during this week - there is a high sense of urgency behind all this!! Best /Thorsten From: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] On Behalf Of Sandfuchs, Thorsten Sent: Dienstag, 26. November 2013 13:03 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Subject: Re: [Fiware-apps] News from WPL/WPA Telco Dear colleagues, let me add some thoughts here: 1. Catalog content - in general ? I want to emphasize that you should REALLY focus on this within this week. These entries are rather low-level to fix and it poses a high effect towards the outside. And as we have some internal approval barriers, I would strongly advise for a solution implemented today or tomorrow to allow for this approval process to finalize in time. 2. Catalog content - T&C Please see the attached WORD file with open questions on T&C for the partners: UPM, THALES, TI, ECE, DT 3. Catalog entries - missing GEs ? BEMES - try to fix all pending editorial changes and comply to the given rules of the approvers, otherwise you will have a hard time defending your GE in front of the review 4. Catalog entries - content I only briefly looked over them - please use the word template in order to check spelling and grammar mistakes and correct them! 5. Catalog entries - download sections PLEASE update the download sections - e.g. it gives very bad impression on your contributions, which actually is not the case - e.g for UPM: [cid:image001.jpg at 01CEED2F.7652D970] ? Is this really the "latest" version that is linked here - why is this even called "1.1.0"? Where do I find addtionaly and "current" downloads - we are in sprint/release 3.2 and there is not even 2.X mentioned.... ? I didn't to a checklist for all partners please work on this autonomously for EVERY component. 6. Catalog - all other tabs In general - check all tabs of the catalogue and work on the content as much as possible to achieve most updated content and links and information! Thanks for listening in :) /Thorsten From: fiware-apps-bounces at lists.fi-ware.eu [mailto:fiware-apps-bounces at lists.fi-ware.eu] On Behalf Of Heller, Markus Sent: Montag, 25. November 2013 18:49 To: 'fiware-apps at lists.fi-ware.eu' Subject: [Fiware-apps] News from WPL/WPA Telco Hi All, here is send some preliminary news from WPL/WPA telco for you. Please note that for some topics separate e-mails from colleagues are planned and will be distributed soon... My mail here is more to make you aware what is under discussion since we are now in a "fast-move-mode" a bit... please rely on the other mails for strict deadlines etc.... FI-WARE Catalog Entries for Review / External availability: Reviewers and EC perform the assessment only after end of this month November (!). Until then, you can change and add. - A separate mail planned, if I recall right, on this topic for distribution - FI-WARE-Catalog: Terms and Conditions and Licenses information. Junajo assumes that extra care might be spent here by reviewers (!) - Question for Catalog: How will reviewers consume it? Paper or online only? Arian said they will check catalog online....but do not rely on this info IMHO. Review 18.12.: - Review Agenda Draft will be sent by Juanjo/Miguel to EC this week, including a slot for exploitation questions per GE owners (they can attend then if needed), Answer by EC requested until 11.12 (one week ahead). SW-Release / Catalog uploads of software ZIPs for the Review: - Software information / ZIPs not always up-to-date (some "newest" releases date from mid of 2012...) --> update/upload of new software there is needed to let the _reviewers_ see that we have very "fresh tomatoes" to offer... - An Email will be sent from TID (Miguel) to clarify procedures & deadlines what needs to be done - JH: In general, every partner can update the SW and documents for its Catalog areas without waiting until the end of major release. But it will only be listed to public if the reviews are completed. If you add manuals before a date given by TID then it can be public before the review Best wishes Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 14171 bytes Desc: image001.jpg URL: