From markus.heller at sap.com Wed Apr 2 10:12:19 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 2 Apr 2014 08:12:19 +0000 Subject: [Fiware-apps] [Fiware-wpa] [Fiware-wpl] Packages template In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90BB31B9F2A@EX10-MB2-MAD.hi.inet> References: <393554EDCF801348BC53C7813C6CB73B1AD251C7@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2583F@DEWDFEMB14A.global.corp.sap> <03BE306058976141B4883174DF62D54D0102DF4BF3@EX10-MB2-MAD.hi.inet> <65CDBE2E7E5A964BB8BC5F4328FDE90BB31B9F2A@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD26972@DEWDFEMB14A.global.corp.sap> Hi all, I wanted to send you a current update on packaging templates so that you can plan a bit more: Update: Stefano had created first draft of a template and distributed it for discussion in WPL/WPA (thx). We there have worked on this and in WPL/WPA are finalizing it (Stefano will then distribute the final last updated version now). The discussion on this is NOT finalized yet, but as some of you asked for input to start now with the content I would like to give you a pre-view of possible content so that you can prepare the contents while the format-oriented WIKI page template for the Catalog arrives later: Therefore not to confuse much I have decided to not attach the current template draft from Stefano now (Stefano will send the final version around soon) - instead I attach some proposed content FYI below I guess the proposed content is not surprising, but I wanted to share with you the possible direction in which it might go... As usual, if you should have comments/tips, please keep me posted... Best Markus A sketch of content from within WPL/WPA for package WIKI template-based pages: At least in WP6 we have identified the need to provide an additional document for the GEs package. This document might well be an special wiki page containing: * Special installation, configuration and administration instructions (in addition to the information already provided by each GE in the package). Not everything can be automated from the recipes and there might be some customization options. * Usage patterns. In our case, how to model entities and attributes, subscriptions, event processing rules, data storage, etc. This are "additional aspects" because we are using various GEs together. So I propose to create one or more pages for that content. [...] Another sketch of content (here from Stefano): [...] having said that i suggest for the documentation page: - links to the package installation manual - links to the documentation pages of the geis composing the package - example on the use/demo of the package (indeed if there is a package is becouse there is a need for it, so more possible use of it as such) [...] From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Montag, 31. M?rz 2014 08:57 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] Packages template dear all, please find attached the Packages template for the today discussion. Unfortunately i cannot attend, Davide will represent Engineering. ciao, stefano -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 17652 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 2 12:00:33 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 2 Apr 2014 10:00:33 +0000 Subject: [Fiware-apps] FW: Review of R3.2 finished In-Reply-To: <532B2477.5010404@tid.es> References: <532B2477.5010404@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD26ABC@DEWDFEMB14A.global.corp.sap> Hi all, I have noticed only during the call today, that I have missed to forward the review report upon reception from internal review software release R3.3 to you. That might explain well why I asked how you about the current status here and you wondered maybe what I was talking about... Sorry that I missed to forward it, here it is: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGZ0ekFhREgyMFdoT1owZ1BYdFlnbGc&usp=docslist_api&pli=1#gid=0 Upon request, please concentrate all possible comments in one single message or whatever, avoid separate messages for the sake of an orderly process. Please ask us if you need help, some UTP are not in a good shape as it seems in the review. Please fix this and the other issues noted. Please act as usual and signal to me when you are ready. Deadline: let us say end of this week Friday (idea is to get this back for finalization to wipe it of our tables..) Best Markus From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Donnerstag, 20. M?rz 2014 18:25 To: Heller, Markus Cc: Leidig, Torsten; Sandfuchs, Thorsten; FERMIN GALAN MARQUEZ; MANUEL ESCRICHE VICENTE Subject: Review of R3.2 finished Dear all, This ready. Please try to get all fixed in one go, we do not have time for more so many reviews, as you can easily perceive. There are some UTPs that are in a poor state. Pls provide guidance to whoever is failing to update them or who do not understand how this works. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGZ0ekFhREgyMFdoT1owZ1BYdFlnbGc&usp=docslist_api&pli=1#gid=0 Note that I reviewed all the UTPs personally and Ferm?n did "Files". The column with the reviewers refers exclusively to whoever took charge of the User & Progs manual + the install & admin manual Please concentrate all possible comments in one single message or whatever, avoid separate messages for the sake of an orderly process. Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 14892 bytes Desc: not available URL: From andreas.klein at sap.com Thu Apr 3 11:43:14 2014 From: andreas.klein at sap.com (Klein, Andreas) Date: Thu, 3 Apr 2014 09:43:14 +0000 Subject: [Fiware-apps] R3.3 SW Deliverables preperation Message-ID: <556F697ADC3400408FBBCF7C6040979D967DBF1A@DEWDFEMB15B.global.corp.sap> Dear WP3 partners, as you all know, R3.3 is coming up and we have to prepare our SW-Related deliverables in the private wiki. Input is required from GE Owners who release new Features within R3.3. So if you not have already done so, please create the following R3.3 pages for your GE: - Installation and Administration Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.3_FIWARE_Installation_and_Administration_Guide%22_WP3_Apps_Contribution_in_R3 - User and Programmers Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.4_FIWARE_User_and_Programmers_Guide%22_WP3_Apps_Contribution_in_R3 - Unit Testing Plan and Report: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.5_FIWARE_Unit_Testing_Plan_and_Report%22_WP3_Apps_Contribution_in_R3 If you keep a couple of basic rules in mind, it should be fairly easy to get the green light for delivery from TID :) So, please ensure that: - all new features are traced in the UTP - Open Specifications are linked in the User and Programmer Guide - you don't use absolute links for referencing Features, Specs, etc... - you don't use examples URIs like "http://localhost/a/b/c", use something like "http://[SERVER_URL]:[PORT]/a/b/c" instead - files are uploaded in forge and follow the naming schema Here is a list illustrating the current status + some comments what's obviously missing at the moment: Inst and Admin User and Programmers Unit Testing Plan and Report Registry please create page please create page - please create Page - add test for feature: -IntegrationWithIDManagementSystem Store page exists please check if content needs update page exists please check if content needs update page exists, new Features traced, perfect Business Modeler please create page please create page - please create Page - add test for features: -BMBCIntegrationPOC -ParameterConfiguration -RefactorDomainTier -RemodelGraphVisualization -RepositoryIntegration -LayoutConfiguration -ExtendedUserInteraction Business Calculator please create page please create page - please create Page - add test for features: -RSSIntegration -NetworkModelWizard -NetworkModelCalculator RSS page exists content seems to be up to date page exists please check if content needs update add test for feature -RSSS.ExpenditureManagement.ExpenditureLimits Application Mashup page exists content seems to be up to date page exists, content seems to be up to date - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition please create page please create page - please create Page - add test for features: -IntegrationWithMarketplace -IntegrationWithRepository -SupportForIdManagement -IntegrationWithUSDLEditor If you have any questions, comments or remarks, feel free to contact me. Best Andreas Andreas Klein SAP AG SAP Research Center Karlsruhe Vincenz-Priessnitz-Strasse 1 D - 76131 Karlsruhe T +49-6227-7-52554 -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Fri Apr 4 08:51:31 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 4 Apr 2014 06:51:31 +0000 Subject: [Fiware-apps] Backlog content: updated reviews - deadline 7.April Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD27E32@DEWDFEMB14A.global.corp.sap> Hi all, I have seen the recent backlog statistics - we have been able to close a big bit of our open issues. Here I forward them again: we are with 19% a little bit after the 3rd place....17% would be VERY nice to even scuffle a bit further towards the 3rd place (at least until M36) - maybe we should give it a try :) Thanks for this ... Best wishes Markus From: fiware-ge-owners-bounces at lists.fi-ware.org [mailto:fiware-ge-owners-bounces at lists.fi-ware.org] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Donnerstag, 3. April 2014 22:03 To: fiware-ge-owners at lists.fi-ware.org Cc: fiware-wpl at lists.fi-ware.org; fiware-wpa at lists.fi-ware.org Subject: [Fiware-ge-owners] Backlog content: updated reviews - deadline 7.April Dear Partners, Find below updated backlog reviews: I2ND with 13 (2%) items is very close to finishing. MIWI: 58 (17%) DATA: 130 (15%) [cid:image001.jpg at 01CF4F88.7BB6D540] I2ND [cid:image002.jpg at 01CF4F88.7BB6D540] MIWI [cid:image003.jpg at 01CF4F88.7BB6D540] DATA APPS: 157 (19%) CLOUD: 168 (15%) SECURITY: 222 (34%) IOT: 300 (44%) https://forge.fi-ware.org/docman/view.php/27/3735/FIWARE.backlog.apps.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3736/FIWARE.backlog.cloud.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3739/FIWARE.backlog.iot.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3737/FIWARE.backlog.data.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3738/FIWARE.backlog.i2nd.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3741/FIWARE.backlog.security.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3740/FIWARE.backlog.miwi.review.20140403.xlsx Thanks for cooperation!! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 30877 bytes Desc: not available URL: From markus.heller at sap.com Fri Apr 4 11:15:25 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 4 Apr 2014 09:15:25 +0000 Subject: [Fiware-apps] FW: [Fiware-ge-owners] Backlog content: updated reviews - deadline 7.April In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD27F3C@DEWDFEMB14A.global.corp.sap> References: <65CDBE2E7E5A964BB8BC5F4328FDE90BB31BAB38@EX10-MB2-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1AD27F3C@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD28225@DEWDFEMB14A.global.corp.sap> FYI From: Heller, Markus Sent: Freitag, 4. April 2014 09:29 To: MANUEL ESCRICHE VICENTE Cc: fiware-wpl at lists.fi-ware.org; fiware-wpa at lists.fi-ware.org; fiware-ge-owners at lists.fi-ware.org Subject: RE: [Fiware-ge-owners] Backlog content: updated reviews - deadline 7.April Hi Manuel, > I'll send as a personal present a bottle of excellent wine to the chapter cleaning up their backlog first!!! Regarding the number crunching here again the opinion from the APPS chapter: I think it's not right to count for APPS as it is currently done: ECE has left the project, they cannot improve and they are not part of the FI-WARE Apps any more, but there noncompliance to regulations that were defined after they left a year ago is counted. Numbers from ECE can be reported but not as part of Apps...at least not in the statistics at least. There is no good rationale to measure work of teams who have not worked according to the guidelines of today... I think it's fair to reduce our counting by the Ericsson numbers - they are irrelevant (Not only with respect to the bottle of wine...). Can we do this? Best Markus From: fiware-ge-owners-bounces at lists.fi-ware.org [mailto:fiware-ge-owners-bounces at lists.fi-ware.org] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Donnerstag, 3. April 2014 22:03 To: fiware-ge-owners at lists.fi-ware.org Cc: fiware-wpl at lists.fi-ware.org; fiware-wpa at lists.fi-ware.org Subject: [Fiware-ge-owners] Backlog content: updated reviews - deadline 7.April Dear Partners, Find below updated backlog reviews: I2ND with 13 (2%) items is very close to finishing. MIWI: 58 (17%) DATA: 130 (15%) [cid:image001.jpg at 01CF4FE7.AE6618C0] I2ND [cid:image002.jpg at 01CF4FE7.AE6618C0] MIWI [cid:image003.jpg at 01CF4FE7.AE6618C0] DATA APPS: 157 (19%) CLOUD: 168 (15%) SECURITY: 222 (34%) IOT: 300 (44%) https://forge.fi-ware.org/docman/view.php/27/3735/FIWARE.backlog.apps.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3736/FIWARE.backlog.cloud.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3739/FIWARE.backlog.iot.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3737/FIWARE.backlog.data.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3738/FIWARE.backlog.i2nd.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3741/FIWARE.backlog.security.review.20140403.xlsx https://forge.fi-ware.org/docman/view.php/27/3740/FIWARE.backlog.miwi.review.20140403.xlsx Thanks for cooperation!! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 33254 bytes Desc: not available URL: From mcp at tid.es Mon Apr 7 15:11:09 2014 From: mcp at tid.es (Miguel Carrillo) Date: Mon, 07 Apr 2014 15:11:09 +0200 Subject: [Fiware-apps] Launch of Release 3.3 (reminder) In-Reply-To: <5328184A.403@tid.es> References: <5328184A.403@tid.es> Message-ID: <5342A3ED.1030601@tid.es> Dear all, This is just to remind you the deadline on April,11 ( a)User & Prog., b)Unit Testing Plan, c)Install & Admin manual ) Best regards, Miguel El 18/03/2014 10:56, Miguel Carrillo escribi?: Dear all, This message is to inform you that we have created the links to edit the R3.3 manuals. If you follow the links, you will see that there are two blocks per WP (R3.2 & R3.3) in each one of the three manuals (User & Prog., Unit Testing Plan, Install & Admin). * https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FiwareDeliverablesR3 For the WPLs: * Please check that the manuals under R3.2 and R3.3 are the right ones and delete/add as needed. Do not trust the ones you see now. If there are any changes please inform me in private. * Of course, take into account those GEs that are stopped and delete them For each GE owner: * Please edit the R3.3 manuals. Deadline to have the manuals ready: April, 11. At this point we will provide a dedicated google doc for the R3.3 reviews. The reviews of R3.2 are not superseded and the review will continue in parallel. They continue and all changes from R3.2 should be synchronized in the R3.3 manuals. We will try to reactivate the reviews of R3.2 shortly. Best regards, Manuel & Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From andreas.klein at sap.com Tue Apr 8 10:44:05 2014 From: andreas.klein at sap.com (Klein, Andreas) Date: Tue, 8 Apr 2014 08:44:05 +0000 Subject: [Fiware-apps] R3.3 SW Deliverables finalization - Deadline Friday 11.04 Message-ID: <556F697ADC3400408FBBCF7C6040979D967DC8B4@DEWDFEMB15B.global.corp.sap> Dear WP3 partners, as you all know, our deadline for finishing the Software Related deliverables for R3.3 is this Friday (11.4). Thanks for all the progress you've made during last week! RSS, Store and Registry already look fine from my side. Application Mashup just needs to provide unit tests for new features. Some more work left is for Business Modeler, Business Calculator and Light Semantic Composition. Inst and Admin User and Programmers Unit Testing Plan and Report Registry page exists, content seems to be up to date page exists, content seems to be up to date page exists, new Features traced Store page exists please check if content needs update page exists page exists, new Features traced please check if content needs update Business Modeler page exists please check if content needs update please create page - please create Page - add test for features: -BMBCIntegrationPOC -ParameterConfiguration -RefactorDomainTier -RemodelGraphVisualization -RepositoryIntegration -LayoutConfiguration -ExtendedUserInteraction Business Calculator please create page please create page - please create Page - add test for features: -RSSIntegration -NetworkModelWizard -NetworkModelCalculator RSS page exists, content seems to be up to date page exists, content seems to be up to date page exists, new Features traced Application Mashup page exists, content seems to be up to date page exists, content seems to be up to date - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition page exists, content seems to be up to date please create page - please create Page - add test for features: -IntegrationWithMarketplace -IntegrationWithRepository -SupportForIdManagement -IntegrationWithUSDLEditor Keep up the effort and let's try to finish it in time! Thanks & Best Regards Andreas From: Klein, Andreas Sent: Donnerstag, 3. April 2014 11:43 To: 'fiware-apps at lists.fi-ware.eu' Cc: 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' Subject: R3.3 SW Deliverables preperation Dear WP3 partners, as you all know, R3.3 is coming up and we have to prepare our SW-Related deliverables in the private wiki. Input is required from GE Owners who release new Features within R3.3. So if you not have already done so, please create the following R3.3 pages for your GE: - Installation and Administration Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.3_FIWARE_Installation_and_Administration_Guide%22_WP3_Apps_Contribution_in_R3 - User and Programmers Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.4_FIWARE_User_and_Programmers_Guide%22_WP3_Apps_Contribution_in_R3 - Unit Testing Plan and Report: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.5_FIWARE_Unit_Testing_Plan_and_Report%22_WP3_Apps_Contribution_in_R3 If you keep a couple of basic rules in mind, it should be fairly easy to get the green light for delivery from TID :) So, please ensure that: - all new features are traced in the UTP - Open Specifications are linked in the User and Programmer Guide - you don't use absolute links for referencing Features, Specs, etc... - you don't use examples URIs like "http://localhost/a/b/c", use something like "http://[SERVER_URL]:[PORT]/a/b/c" instead - files are uploaded in forge and follow the naming schema Here is a list illustrating the current status + some comments what's obviously missing at the moment: Inst and Admin User and Programmers Unit Testing Plan and Report Registry please create page please create page - please create Page - add test for feature: -IntegrationWithIDManagementSystem Store page exists please check if content needs update page exists please check if content needs update page exists, new Features traced, perfect Business Modeler please create page please create page - please create Page - add test for features: -BMBCIntegrationPOC -ParameterConfiguration -RefactorDomainTier -RemodelGraphVisualization -RepositoryIntegration -LayoutConfiguration -ExtendedUserInteraction Business Calculator please create page please create page - please create Page - add test for features: -RSSIntegration -NetworkModelWizard -NetworkModelCalculator RSS page exists content seems to be up to date page exists please check if content needs update add test for feature -RSSS.ExpenditureManagement.ExpenditureLimits Application Mashup page exists content seems to be up to date page exists, content seems to be up to date - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition please create page please create page - please create Page - add test for features: -IntegrationWithMarketplace -IntegrationWithRepository -SupportForIdManagement -IntegrationWithUSDLEditor If you have any questions, comments or remarks, feel free to contact me. Best Andreas Andreas Klein SAP AG SAP Research Center Karlsruhe Vincenz-Priessnitz-Strasse 1 D - 76131 Karlsruhe T +49-6227-7-52554 -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Tue Apr 8 15:46:06 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 8 Apr 2014 13:46:06 +0000 Subject: [Fiware-apps] Status ? RE: Review of R3.2 finished --> Deadline: Wednesday 09.04.2014 Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2A844@DEWDFEMB14A.global.corp.sap> Hi all, For R3.2.: if you are listed in the Google Review doc in status "Rejected" please complete the improvement task and report your current status: Have you finished the requested updates of the manuals etc. according to the review comments? Deadline: I would propose that we submit our R3.2 back to Miguel as final end of this week. Therefore please complete this task until Wednesday EOB please (this week). Best Markus - Marketplace: Update completed (AK) Application Mashup Wirecloud Marketplace Marketplace Mediation Mediation Revenue Sharing RSS Store Store BusinessCalculator BusinessCalculator From: Heller, Markus Sent: Mittwoch, 2. April 2014 12:01 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: FW: Review of R3.2 finished Hi all, I have noticed only during the call today, that I have missed to forward the review report upon reception from internal review software release R3.3 to you. That might explain well why I asked how you about the current status here and you wondered maybe what I was talking about... Sorry that I missed to forward it, here it is: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGZ0ekFhREgyMFdoT1owZ1BYdFlnbGc&usp=docslist_api&pli=1#gid=0 Upon request, please concentrate all possible comments in one single message or whatever, avoid separate messages for the sake of an orderly process. Please ask us if you need help, some UTP are not in a good shape as it seems in the review. Please fix this and the other issues noted. Please act as usual and signal to me when you are ready. Deadline: let us say end of this week Friday (idea is to get this back for finalization to wipe it of our tables..) Best Markus From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Donnerstag, 20. M?rz 2014 18:25 To: Heller, Markus Cc: Leidig, Torsten; Sandfuchs, Thorsten; FERMIN GALAN MARQUEZ; MANUEL ESCRICHE VICENTE Subject: Review of R3.2 finished Dear all, This ready. Please try to get all fixed in one go, we do not have time for more so many reviews, as you can easily perceive. There are some UTPs that are in a poor state. Pls provide guidance to whoever is failing to update them or who do not understand how this works. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGZ0ekFhREgyMFdoT1owZ1BYdFlnbGc&usp=docslist_api&pli=1#gid=0 Note that I reviewed all the UTPs personally and Ferm?n did "Files". The column with the reviewers refers exclusively to whoever took charge of the User & Progs manual + the install & admin manual Please concentrate all possible comments in one single message or whatever, avoid separate messages for the sake of an orderly process. Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Tue Apr 8 15:51:42 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 8 Apr 2014 13:51:42 +0000 Subject: [Fiware-apps] FW: [Fiware-wpl] Agile dynamic: Sprint 3.4.1 period for planning - Finished In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90BB31BBD6D@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90BB31BBD6D@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2A895@DEWDFEMB14A.global.corp.sap> FYI From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Dienstag, 8. April 2014 09:46 To: fiware-ge-owners at lists.fi-ware.org Cc: fiware-wpl at lists.fi-ware.org; fiware-wpa at lists.fi-ware.org Subject: [Fiware-wpl] Agile dynamic: Sprint 3.4.1 period for planning - Finished Dear Partners, Let me remind you that the period to plan sprint 3.4.1 is finished. I assume those GEIs without content don't plan any development. Anyway, let me remind you work items can be introduced any time, since some of them may appear during the month. APPS [cid:image002.png at 01CF530E.C6AB33F0] https://forge.fi-ware.org/docman/view.php/27/3760/FIWARE.backlog.apps.dashboard.20140407.xlsx CLOUD [cid:image003.png at 01CF530E.C6AB33F0] https://forge.fi-ware.org/docman/view.php/27/3761/FIWARE.backlog.cloud.dashboard.20140407.xlsx IOT [cid:image004.png at 01CF530E.C6AB33F0] https://forge.fi-ware.org/docman/view.php/27/3764/FIWARE.backlog.iot.dashboard.20140407.xlsx DATA [cid:image005.png at 01CF530E.C6AB33F0] https://forge.fi-ware.org/docman/view.php/27/3762/FIWARE.backlog.data.dashboard.20140407.xlsx I2ND [cid:image001.png at 01CF530F.53D16380] https://forge.fi-ware.org/docman/view.php/27/3763/FIWARE.backlog.i2nd.dashboard.20140407.xlsx SECURITY [cid:image006.png at 01CF530F.53D16380] https://forge.fi-ware.org/docman/view.php/27/3766/FIWARE.backlog.security.dashboard.20140407.xlsx MIWI [cid:image007.png at 01CF530F.53D16380] https://forge.fi-ware.org/docman/view.php/27/3765/FIWARE.backlog.miwi.dashboard.20140407.xlsx Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 105720 bytes Desc: not available URL: From andreas.klein at sap.com Tue Apr 8 16:04:13 2014 From: andreas.klein at sap.com (Klein, Andreas) Date: Tue, 8 Apr 2014 14:04:13 +0000 Subject: [Fiware-apps] WP3 Meeting Minutes 2014-04-08 Message-ID: <556F697ADC3400408FBBCF7C6040979D967DCACC@DEWDFEMB15B.global.corp.sap> Dear WP3 partners, please find the minutes of today's WP3 call in the docman: https://forge.fi-ware.org/docman/view.php/12/3769/2014_04_08_FI-WARE_WP3_Minutes.docx Best regards Andreas Andreas Klein SAP AG SAP Research Center Karlsruhe Vincenz-Priessnitz-Strasse 1 D - 76131 Karlsruhe T +49-6227-7-52554 -------------- next part -------------- An HTML attachment was scrubbed... URL: From ralli at tid.es Wed Apr 9 15:20:11 2014 From: ralli at tid.es (CARLOS RALLI UCENDO) Date: Wed, 09 Apr 2014 13:20:11 +0000 Subject: [Fiware-apps] Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB In-Reply-To: <5342A3ED.1030601@tid.es> Message-ID: Dear colleagues, It is time to collect all information regarding dissemination, communication & collaboration actions you performed in the last WP12 reporting period (M30 = Oct 2013 to M36 = Apr 2014, all included). Please, bear in mind that the EC may reject one of your trips for these activities if they are not correctly reported in this new edition of D12.2 and D12.3 documents. This time, to make things easier for all of you I have prepared a Googledoc where you can place your contribs and then I may transfer them myself to the wiki: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_73M/edit#heading=h.o4j1rtrg6tzx However, you may always contribute to the wiki directly as in previous times. The contribs have to be added here: http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Dissemination_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Communication_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Collaboration_activities Even when you add your contribs straight into the wiki, do not forget to add your partner name to the googledoc and add "(Wiki)" so I keep informed. As said in the googledoc the 6 possible sections you may contribute with entries (the googledoc includes examples) are: 1. Participation in Events (Presentations, round tables, keynotes...) 2. Scientific Papers and Panels 3. Book chapters 4. Training materials & Tutorials 5. Collaboration Meetings/Actions 6. Press Releases and other relevant Communication actions Normally, most partners will have contribs to 1 and 2 sections. Deadline for this is next monday April 14th EoB. Should you have any question/comment, please do contact me. Thanks in advance for your kind cooperation. Best regards, -- ------------------------------------------------------------------------------------------------------------------------ Carlos Ralli Ucendo (ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ------------------------------------------------------------------------------------------------------------------------ Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ------------------------------------------------------------------------------------------------------------------------ ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Thu Apr 10 17:25:17 2014 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 10 Apr 2014 15:25:17 +0000 Subject: [Fiware-apps] FW: [Fiware-wpl] Training material dashboard In-Reply-To: <5346B42E.6040905@eng.it> References: <5346B42E.6040905@eng.it> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2C3EF@DEWDFEMB14A.global.corp.sap> Hi WP3, Training material: please see the red entries for some of us. Best wishes Markus [cid:image001.png at 01CF54E1.D706B6F0] From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of Davide Dalle Carbonare Sent: Donnerstag, 10. April 2014 17:10 To: fiware-wpl at lists.fi-ware.org; fiware-wpa at lists.fi-ware.org Subject: [Fiware-wpl] Training material dashboard Dear partners, following the action point on the minutes regarding the training material, I'm proceeding with the assessment of the contents currently available in the eLearning platform, with priority to the ones owned by partners leaving at M36. Please find here the dashboard that I'm using to keep track of the status https://docs.google.com/spreadsheet/ccc?key=0AopQnlLhngy9dHVla1kyTnNXTTdWVTd6WW55LUk4TlE Edit is blocked but comments are enabled. For the Security Chapter it's not easy to map the current courses to one of the listed entries in the dashboard. @Pascal, can you help me on this? I take advantage from this message to remind you that (as already anticipated during the call we had this monday) everyone that need some support for creating courses can contact me directly so that accordingly to every specific need we (E-IIS) can support you in the most proper way. thank you and BR Davide -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 77515 bytes Desc: not available URL: From markus.heller at sap.com Fri Apr 11 11:53:02 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 11 Apr 2014 09:53:02 +0000 Subject: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2CDAC@DEWDFEMB14A.global.corp.sap> Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud Light Semantic Composition Editor COMPEL Marketplace Marketplace - SAP RI Mediator Mediator Mediator SETHA2 Registry Registry - SAP RI Repository Repository - SAP RI Revenue Settlement and Sharing System Revenue Settlement and Sharing System Service Composition Ericsson Composition Engine (ECE) Service Mashup Mashup Factory Store WStore Business Calculator Business Calculator Business Modeler Business Modeler Hi WP3, We have to carry out the installation and usage tests according to the mail from Stefano below. I as WPL are asked to manage this process. For a first round, please mail me until deadline Friday today 15:00 which 1 (or 2) partners you propose to test your GE (1-2 tests, minimum 1 test) - as I have a task until today EOB to send them to Stefano. Regardless of being Open Source or not, you are asked to have your GE testes as described below, so nomination of test partner is no problem and we can sort out details later also. Fallback: If you cannot mail, I will assign WP3 partners for you in a fair manner. We can then reassign later next week until Wednesday where needed. If you are in Easter Holidays next week, please act today asap and mail to me who tests your stuff (approved by him or not) Best Markus --- From: fiware-wpa-bounces at lists.fi-ware.org [mailto:fiware-wpa-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 40584 bytes Desc: not available URL: From markus.heller at sap.com Fri Apr 11 11:59:45 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 11 Apr 2014 09:59:45 +0000 Subject: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2CDAC@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD2CDAC@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2CDDF@DEWDFEMB14A.global.corp.sap> Hi, ...and please fill our your entry row for your GEs, that's why I have copied the table. Do not edit it on Google Docs (I do not know if you have write access anyway....). I nevertheless cannot edit the google docs myself since I have no google account, so I will send a compiled E-Mail later to Stefano. Instead, please do me the favor to just write back your table entries to me in an email until 15:00 today, I put it together. How to fill in your table row --> I add help how to fill out the entries, from Stefano: - "Release to test:" Example= ?? (a YES/NO, a date when released so that a tester can start?, ...) the exact version number of the gei under test. this should be the latest completely available at the moment of test, e.g. 3.x.x. this field should be filled by the tester, but agreed with the wpl - "Testing applies?": Example= ?? (no clue... a Name, a YES/NO, a report of the testing...?) "YES" if the gei is oss, so intsllation and deployment test can be made, otherwise "NO". this field should be filled by the wpl - "testing on FI-LAB": Example= ?? (no clue... a Name, a YES/NO, a report of the testing...?) "YES" if the gei, either oss or not, is equipped with recipes for installation in fi-lab, otherwise "NO". this field should be filled by the wpl - "Assigned tester:" Example= TID, ENG or Markus Heller (SAP) - person or company? certainly the name of the company. if you also have already the name of the person responsible for the test, greater! From: Heller, Markus Sent: Freitag, 11. April 2014 11:53 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud Light Semantic Composition Editor COMPEL Marketplace Marketplace - SAP RI Mediator Mediator Mediator SETHA2 Registry Registry - SAP RI Repository Repository - SAP RI Revenue Settlement and Sharing System Revenue Settlement and Sharing System Service Composition Ericsson Composition Engine (ECE) Service Mashup Mashup Factory Store WStore Business Calculator Business Calculator Business Modeler Business Modeler Hi WP3, We have to carry out the installation and usage tests according to the mail from Stefano below. I as WPL are asked to manage this process. For a first round, please mail me until deadline Friday today 15:00 which 1 (or 2) partners you propose to test your GE (1-2 tests, minimum 1 test) - as I have a task until today EOB to send them to Stefano. Regardless of being Open Source or not, you are asked to have your GE testes as described below, so nomination of test partner is no problem and we can sort out details later also. Fallback: If you cannot mail, I will assign WP3 partners for you in a fair manner. We can then reassign later next week until Wednesday where needed. If you are in Easter Holidays next week, please act today asap and mail to me who tests your stuff (approved by him or not) Best Markus --- From: fiware-wpa-bounces at lists.fi-ware.org [mailto:fiware-wpa-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- An HTML attachment was scrubbed... URL: From torsten.leidig at sap.com Fri Apr 11 11:47:57 2014 From: torsten.leidig at sap.com (Leidig, Torsten) Date: Fri, 11 Apr 2014 09:47:57 +0000 Subject: [Fiware-apps] FW: Review of the Apps Chapter in the FI-WARE architecture In-Reply-To: <534245C8.2040509@tid.es> References: <534245C8.2040509@tid.es> Message-ID: <703F4EB81B2AD0428360BFE55A82DFBC5FCFB269@DEWDFEMB11C.global.corp.sap> Dear WP3 Partners, we received the final review for the FI-WARE Apps Chapter Architecture deliverable. You will find the document on the Forge (see mail below). I've gone through the document, checked all minor changes and accepted most of them. A file of this document version is attached to the mail. There are still all comments in the document. So you should carefully look at these comments and do your best to improve your sections!!! Esp. the Business Modeller and Business Calculator are emphasized in Juanjo's mail (see below). There will be no further review. This means you are now asked to incorporate all changes of this last version (and your additional changes of course) into the FI-WARE P r i v a t e Wiki. The final deliverable will be created from these pages in the Wiki soon! So please start to update your pages in the private Wiki in order to reflect the latest reviewed document. Please give me an indication if you are done with it. Best regards, Torsten Dr Torsten Leidig Development Architect - Human Computer Interaction SAP AG | Vincenz-Priessnitz-Strasse 1 | 76131 Karlsruhe | Germany T +49 6227-7-52535 | M +49 171 978 1292 mailto:torsten.leidig at sap.com Pflichtangaben/Mandatory Disclosure Statements: http://www.sap.com/company/legal/impressum.epx Diese E-Mail kann Betriebs- oder Gesch?ftsgeheimnisse oder sonstige vertrauliche Informationen enthalten. Sollten Sie diese E-Mail irrt?mlich erhalten haben, ist Ihnen eine Kenntnisnahme des Inhalts, eine Vervielf?ltigung oder Weitergabe der E-Mail ausdr?cklich untersagt. Bitte benachrichtigen Sie uns und vernichten Sie die empfangene E-Mail. Vielen Dank. This e-mail may contain trade secrets or privileged, undisclosed, or otherwise confidential information. If you have received this e-mail in error, you are hereby notified that any review, copying, or distribution of it is strictly prohibited. Please inform us immediately and destroy the original transmittal. Thank you for your cooperation. ________________________________ From: Juanjo Hierro [jhierro at tid.es] Sent: Monday, April 07, 2014 8:29 AM To: Heller, Markus; Sandfuchs, Thorsten; Leidig, Torsten Cc: Miguel Carrillo; jhierro >> "Juan J. Hierro" Subject: Review of the Apps Chapter in the FI-WARE architecture Dear Markus, Torsten, Thorsten, You can download a revised version of the architecture of the Apps Chapter from the following link: https://forge.fi-ware.org/docman/view.php/27/3749/D.2.3.3%2BFI-WARE%2BArchitecture%2BWP3%2Bcontributions%2Bconsolidated+revised+jhierro.docx Proposed changes are marked through the change tracking system of MS Word. My comments will be visualized under comments of "editor". Many of the changes are editorial and targeted to improve readability. However, I would like to highlight the comments made on the Business Modeller and Calculator GEs. Particularly, the Bussiness Calculator makes reference to concepts (i.e., equipments) that a reader can hardly link to concepts supported by another GEs that are part of the Business Framework. I wonder whether that part had been carefully reviewed ... Please proceed with the acceptance (or eventually rejection under justification) of changes and translate the contents to the public wiki. As with regard to Open Specifications, please proceed to publish them on the public wiki and generate the deliverable to be submitted without waiting for my revision. However, I encourage you to carefully review the open specifications related to the Business Modeller and Business Calculator to make sure that these specifications are complete and the underlying model is well aligned or at least clearly compatible with the model bound to other GEs, particularly the Store and RSS GEs. If such alignment/compatibility is not achieved, there might be a risk that comments are received by the reviewers and that the particular contributions to the specs regarding these GEs is not accepted. Best regards, -- Juanjo ------------- Product Development and Innovation (PDI) - Telefonica Digital website: www.tid.es email: jhierro at tid.es twitter: twitter.com/JuanjoHierro FI-WARE (European Future Internet Core Platform) Coordinator and Chief Architect FI-PPP Architecture Board chairman You can follow FI-WARE at: website: http://www.fi-ware.eu facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 twitter: http://twitter.com/FIware linkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.2.3.3+FI-WARE+Architecture+WP3+contributions+consolidated revised jhierro.docx Type: application/binary Size: 8013709 bytes Desc: D.2.3.3+FI-WARE+Architecture+WP3+contributions+consolidated revised jhierro.docx URL: From markus.heller at sap.com Fri Apr 11 14:59:29 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 11 Apr 2014 12:59:29 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call In-Reply-To: <393554EDCF801348BC53C7813C6CB73B0694C9@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B0694C9@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> Hi all, Let me make a poll: Who of you is available next week (or in vacation) --> call to be dropped or held? Please all reply to all of us. Best Markus -----Original Appointment----- From: Heller, Markus Sent: Mittwoch, 24. April 2013 15:24 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Cc: Joaquin Iranzo Yuste; Ughetti Marco Subject: FI-WARE: WP3 Call When: Dienstag, 15. April 2014 15:00-16:00 (UTC+01:00) Amsterdam, Berlin, Bern, Rome, Stockholm, Vienna. Where: SAP Connect Markus Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: From koen.casier at intec.ugent.be Fri Apr 11 15:03:27 2014 From: koen.casier at intec.ugent.be (koen casier) Date: Fri, 11 Apr 2014 15:03:27 +0200 Subject: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2CDDF@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD2CDAC@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2CDDF@DEWDFEMB14A.global.corp.sap> Message-ID: <5347E81F.50301@intec.ugent.be> Dear Markus, For the business modeler and business calculator, the latest 3.3.3. version is available for testing, and all manuals have been updated on the private wiki as well and they can be found linked under the R3 deliverable listing. I have named all tests with a number indicating the release they were available and useable so testers can quickly proceed to the right tests. Do I understand correctly that we should ourselves decide who should test our stuff? Or should we indicate what we want to have tested and/or what we want to test? For this last case, a random assignment of a test will be OK for me. best regards, Koen On 4/11/2014 11:59 AM, Heller, Markus wrote: > > Hi, > > ...and please fill our your entry row for your GEs, that's why I have > copied the table. > > Do not edit it on Google Docs (I do not know if you have write access > anyway....). I nevertheless cannot edit the google docs myself since I > have no google account, so I will send a compiled E-Mail later to Stefano. > > Instead, please do me the favor to just write back your table entries > to me in an email until 15:00 today, I put it together. > > How to fill in your table row ?I add help how to fill out the entries, > from Stefano: > > - "Release to test:" Example= ?? (a YES/NO, a date > when released so that a tester can start?, ...) > > the exact version number of the gei under test.this should be the > latest completely available at the moment of test, e.g. 3.x.x. this > field should be filled by the tester, but agreed with the wpl > > - "Testing applies?": Example= ?? (no clue... a > Name, a YES/NO, a report of the testing...?) > > "YES" if the gei is oss, so intsllation and deployment test can be > made, otherwise "NO". this field should be filled by the wpl > > - "testing on FI-LAB": Example= ?? (no clue... a > Name, a YES/NO, a report of the testing...?) > > "YES"if the gei, either oss or not, is equipped with recipes for > installation in fi-lab, otherwise "NO". this field should be filled by > the wpl > > - "Assigned tester:" Example= TID, ENG or Markus Heller (SAP) -- > person or company? > > certainly the name of the company. if you also have already the name > of the person responsible for the test, greater! > > *From:*Heller, Markus > *Sent:* Freitag, 11. April 2014 11:53 > *To:* FI-WARE Apps (fiware-apps at lists.fi-ware.org) > *Subject:* Please act today Friday until 15:00 --> RE: [Fiware-wpa] > URGENT: GEis installation and test > > *Chapter* > > > > *GE* > > > > *GEi* > > > > *Release to test* > > > > *Testing applies?* > > > > *Testing on FI-Lab?* > > > > *Assigned tester* > > > > Apps - WP3 > > > > Application Mashup > > > > Wirecloud > > > > > > > > > > Light Semantic Composition Editor > > > > COMPEL > > > > > > > > > > Marketplace > > > > Marketplace - SAP RI > > > > > > > > > > Mediator > > > > Mediator > > > > > > > > > > Mediator > > > > SETHA2 > > > > > > > > > > Registry > > > > Registry - SAP RI > > > > > > > > > > Repository > > > > Repository - SAP RI > > > > > > > > > > Revenue Settlement and Sharing System > > > > Revenue Settlement and Sharing System > > > > > > > > > > Service Composition > > > > Ericsson Composition Engine (ECE) > > > > > > > > > > Service Mashup > > > > Mashup Factory > > > > > > > > > > Store > > > > WStore > > > > > > > > > > Business Calculator > > > > Business Calculator > > > > > > > > > > Business Modeler > > > > Business Modeler > > > > > > > > Hi WP3, > > We have to carry out the installation and usage tests according to the > mail from Stefano below. I as WPL are asked to manage this process. > > For a first round, please mail me until deadline *Friday today 15:00 > *which 1 (or 2) partners you propose to test your GE (1-2 tests, > minimum 1 test) -- as I have a task until today EOB to send them to > Stefano. > > Regardless of being Open Source or not, you are asked to have your GE > testes as described below, so nomination of test partner is no problem > and we can sort out details later also. > > Fallback: If you cannot mail, I will assign WP3 partners for you in a > fair manner. We can then reassign later next week until Wednesday > where needed. > > If you are in Easter Holidays next week, please act today asap and > mail to me who tests your stuff (approved by him or not) > > Best > > Markus > > --- > > *From:*fiware-wpa-bounces at lists.fi-ware.org > > [mailto:fiware-wpa-bounces at lists.fi-ware.org] *On Behalf Of > *stefano de panfilis > *Sent:* Dienstag, 8. April 2014 20:32 > > > *To:* fiware-wpl at lists.fi-ware.eu > ; fiware-wpa at lists.fi-ware.eu > > *Subject:* [Fiware-wpa] URGENT: GEis installation and test > > dear all, > > as discussed yesterday during our call and refined this morning > in the wp10 call, here is the procedure to install and test the > geis as requested in the scope of recommendation 18 of the review > report 6 excerpt of which is "/Obviously, hardly any of the > documentation can claim completeness in the remaining time, but > should at least cover all known grounds. //To this end, extensive > and directed installation and usage tests should be performed -- > not only through the Use Case projects, but also within the > consortium. For example, partners not involved in the development > of a specific Generic Enabler can verify it through installation > and testing. The according results and findings should be > incorporated in the forthcoming Release 3 and the validation > reporting of deliverable D10.5.3/." > > the wpl migth already have received at this time an invitation > from me to access a googledoc (here again the link for your > convenience: > https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) > > this doc contains all the geis implemented at the moment or in the > very near future. > > 1. each wpl must, within this friday (11 april 2014), fill, in > agreement with their wp participants, the name of the organisation > responsible for installing a testing a specific gei. in addition > the wpl should declare which geis will be tested. the overal rules > are: > > 1.1 no geis of wp4 for what concerns fi-lab installation and test > > 1.2 only the geis of wp7 which do not require special network > environment > > 1.3 no geis for which do not exist an oss version > > 2. within 25 april 2014 all the installations and tests must be > completed either by the organisations leaving the project at m36, > and by those organisation if a test assigned to them involve a gei > owned by an organisation leaving the project at m36. > > 3. all the remaining installations and tests must be fulfilled by > 30 june 2014. > > the installation and tests must be documented using the form > described in the attached document. > > please note that, as you can easily guess from point 1 above, > there are two different kind of installations to be tested: > > 1. manual deplyoment, which involves all oss released geis > > 2. recipes supported deployment in the fi-ware testbed. this case > the person making the test must create a vm, which should be > removed immediately after the installation and test is completed > (due to the obvious resource cosumption) > > it would be great if the persons who will make the installation > and tests are completely outside the fi-ware environment. > > this procedure refines and superseeds what sent by thorsten, thank > you for triggering the process, on last wednesday. > > for any clarification you migth need, please do not hesitate to > contact me. > > ciao, > > stefano > > -- > > Stefano De Panfilis > Chief Innovation Officer > Engineering Ingegneria Informatica S.p.A. > via Riccardo Morandi 32 > 00148 Roma > Italy > > tel (direct): +39-068307-4295 > tel (secr.): +39-068307-4513 > fax: +39-068307-4200 > cell: +39-335-7542-567 > > skype: depa01 > > > > -- > > Stefano De Panfilis > Chief Innovation Officer > Engineering Ingegneria Informatica S.p.A. > via Riccardo Morandi 32 > 00148 Roma > Italy > > tel (direct): +39-068307-4295 > tel (secr.): +39-068307-4513 > fax: +39-068307-4200 > cell: +39-335-7542-567 > > skype: depa01 > > > > _______________________________________________ > Fiware-apps mailing list > Fiware-apps at lists.fi-ware.org > https://lists.fi-ware.org/listinfo/fiware-apps -------------- next part -------------- An HTML attachment was scrubbed... URL: From koen.casier at intec.ugent.be Fri Apr 11 15:03:57 2014 From: koen.casier at intec.ugent.be (koen casier) Date: Fri, 11 Apr 2014 15:03:57 +0200 Subject: [Fiware-apps] FI-WARE: WP3 Call In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B0694C9@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> Message-ID: <5347E83D.3070504@intec.ugent.be> I am available on monday-tuesday-wednesday. On 4/11/2014 2:59 PM, Heller, Markus wrote: > Hi all, > Let me make a poll: Who of you is available next week (or in vacation) > ? call to be dropped or held? Please all reply to all of us. > Best > Markus > -----Original Appointment----- > *From:* Heller, Markus > *Sent:* Mittwoch, 24. April 2013 15:24 > *To:* Heller, Markus; 'fiware-apps at lists.fi-ware.eu' > *Cc:* Joaquin Iranzo Yuste; Ughetti Marco > *Subject:* FI-WARE: WP3 Call > *When:* Dienstag, 15. April 2014 15:00-16:00 (UTC+01:00) Amsterdam, > Berlin, Bern, Rome, Stockholm, Vienna. > *Where:* SAP Connect Markus > Dear FI-WARE WP3 colleagues, > I invite you to our new WP3 Call on Tuesdays 15-16. Please use the > dial-in info below. > Best wishes > Markus > ---- > Please join me in a SAP CONNECT meeting. > Web conference: *_https://sap.emea.pgiconnect.com/heller_* > Audio Participant Code: *124 225 33 29* > *Country* *Number* *Blackberry Friendly / Lync Friendly* > *(if you are running SAP Lync Quality Advisor)* > *Android Friendly* > Germany, Frankfurt _tel:+4969222210764_ > _tel:+4969222210764x1242253329#_ __ > _tel:+4969222210764;1242253329#_ __ > Germany, Munich _tel:+4989710424682_ > _tel:+4989710424682x1242253329#_ __ > _tel:+4989710424682;1242253329#_ __ > *Europe* > > > Austria, Vienna _tel:+431253021750_ _tel:+431253021750x1242253329#_ > _tel:+431253021750;1242253329#_ > __ > France, Paris _tel:+33170701777_ _tel:+33170701777x1242253329#_ > __ _tel:+33170701777;1242253329#_ > __ > Italy, Milan _tel:+390236009839_ _tel:+390236009839x1242253329#_ > _tel:+390236009839;1242253329#_ > > Spain, Madrid _tel:+34917699443_ _tel:+34917699443x1242253329#_ > _tel:+34917699443;1242253329#_ > > Switzerland, Zurich _tel:+41434569248_ > _tel:+41434569248x1242253329#_ > _tel:+41434569248;1242253329#_ > UK, London _tel:+442033645639_ _tel:+442033645639x1242253329#_ > __ _tel:+442033645639;1242253329#_ > __ > *Overseas* > > > Australia, Sydney _tel:+61290090688_ > _tel:+61290090688x1242253329#_ > _tel:+61290090688;1242253329#_ > India, Bangalore _tel:+918061275055_ > _tel:+918061275055x1242253329#_ > _tel:+918061275055;1242253329#_ > USA, New York _tel:+16464340499_ _tel:+16464340499x1242253329#_ > __ _tel:+16464340499;1242253329#_ > __ > > If you have never attended a Connect Pro meeting before: > Test your connection: > _https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm_ > Get a quick overview: _http://www.adobe.com/go/connectpro_overview_ > Adobe, the Adobe > > > _______________________________________________ > Fiware-apps mailing list > Fiware-apps at lists.fi-ware.org > https://lists.fi-ware.org/listinfo/fiware-apps -------------- next part -------------- An HTML attachment was scrubbed... URL: From joaquin.iranzo at atos.net Fri Apr 11 15:06:03 2014 From: joaquin.iranzo at atos.net (Iranzo Yuste, Joaquin) Date: Fri, 11 Apr 2014 13:06:03 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B0694C9@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> Message-ID: <47637E3E5662AD4B9B640BA60ADB431404148B@DEFTHW99EX2MSX.ww931.my-it-solutions.net> Hi Marcus, I will start the Easter holidays at Thursday. I can attend the conference next Tuesday. Regards, Joaquin. From: Heller, Markus [mailto:markus.heller at sap.com] Sent: Friday, April 11, 2014 2:59 PM To: 'fiware-apps at lists.fi-ware.eu' Cc: Iranzo Yuste, Joaquin; Ughetti Marco Subject: RE: FI-WARE: WP3 Call Hi all, Let me make a poll: Who of you is available next week (or in vacation) --> call to be dropped or held? Please all reply to all of us. Best Markus -----Original Appointment----- From: Heller, Markus Sent: Mittwoch, 24. April 2013 15:24 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Cc: Joaquin Iranzo Yuste; Ughetti Marco Subject: FI-WARE: WP3 Call When: Dienstag, 15. April 2014 15:00-16:00 (UTC+01:00) Amsterdam, Berlin, Bern, Rome, Stockholm, Vienna. Where: SAP Connect Markus Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Fri Apr 11 15:07:34 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 11 Apr 2014 13:07:34 +0000 Subject: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test In-Reply-To: <5347E81F.50301@intec.ugent.be> References: <393554EDCF801348BC53C7813C6CB73B1AD2CDAC@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2CDDF@DEWDFEMB14A.global.corp.sap> <5347E81F.50301@intec.ugent.be> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2D078@DEWDFEMB14A.global.corp.sap> Hi Koen, Yes, you can decide in the first place (is best). If you have no candidates, I am asked to assign someone according to process (worse IMHO).... So yes, please name a partner - inside or outside WP3, everyone can do it basically. Some partners can test more than 1 and some partners may not test at all (if everything is fine with the balance or so), but each GE should be tested (or justified why not, see below Stefanos requirements). Best Markus From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of koen casier Sent: Freitag, 11. April 2014 15:03 To: fiware-apps at lists.fi-ware.org Subject: Re: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Dear Markus, For the business modeler and business calculator, the latest 3.3.3. version is available for testing, and all manuals have been updated on the private wiki as well and they can be found linked under the R3 deliverable listing. I have named all tests with a number indicating the release they were available and useable so testers can quickly proceed to the right tests. Do I understand correctly that we should ourselves decide who should test our stuff? Or should we indicate what we want to have tested and/or what we want to test? For this last case, a random assignment of a test will be OK for me. best regards, Koen On 4/11/2014 11:59 AM, Heller, Markus wrote: Hi, ...and please fill our your entry row for your GEs, that's why I have copied the table. Do not edit it on Google Docs (I do not know if you have write access anyway....). I nevertheless cannot edit the google docs myself since I have no google account, so I will send a compiled E-Mail later to Stefano. Instead, please do me the favor to just write back your table entries to me in an email until 15:00 today, I put it together. How to fill in your table row --> I add help how to fill out the entries, from Stefano: - "Release to test:" Example= ?? (a YES/NO, a date when released so that a tester can start?, ...) the exact version number of the gei under test. this should be the latest completely available at the moment of test, e.g. 3.x.x. this field should be filled by the tester, but agreed with the wpl - "Testing applies?": Example= ?? (no clue... a Name, a YES/NO, a report of the testing...?) "YES" if the gei is oss, so intsllation and deployment test can be made, otherwise "NO". this field should be filled by the wpl - "testing on FI-LAB": Example= ?? (no clue... a Name, a YES/NO, a report of the testing...?) "YES" if the gei, either oss or not, is equipped with recipes for installation in fi-lab, otherwise "NO". this field should be filled by the wpl - "Assigned tester:" Example= TID, ENG or Markus Heller (SAP) - person or company? certainly the name of the company. if you also have already the name of the person responsible for the test, greater! From: Heller, Markus Sent: Freitag, 11. April 2014 11:53 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud Light Semantic Composition Editor COMPEL Marketplace Marketplace - SAP RI Mediator Mediator Mediator SETHA2 Registry Registry - SAP RI Repository Repository - SAP RI Revenue Settlement and Sharing System Revenue Settlement and Sharing System Service Composition Ericsson Composition Engine (ECE) Service Mashup Mashup Factory Store WStore Business Calculator Business Calculator Business Modeler Business Modeler Hi WP3, We have to carry out the installation and usage tests according to the mail from Stefano below. I as WPL are asked to manage this process. For a first round, please mail me until deadline Friday today 15:00 which 1 (or 2) partners you propose to test your GE (1-2 tests, minimum 1 test) - as I have a task until today EOB to send them to Stefano. Regardless of being Open Source or not, you are asked to have your GE testes as described below, so nomination of test partner is no problem and we can sort out details later also. Fallback: If you cannot mail, I will assign WP3 partners for you in a fair manner. We can then reassign later next week until Wednesday where needed. If you are in Easter Holidays next week, please act today asap and mail to me who tests your stuff (approved by him or not) Best Markus --- From: fiware-wpa-bounces at lists.fi-ware.org [mailto:fiware-wpa-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 _______________________________________________ Fiware-apps mailing list Fiware-apps at lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-apps -------------- next part -------------- An HTML attachment was scrubbed... URL: From koen.casier at intec.ugent.be Fri Apr 11 15:15:32 2014 From: koen.casier at intec.ugent.be (koen casier) Date: Fri, 11 Apr 2014 15:15:32 +0200 Subject: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2D078@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD2CDAC@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2CDDF@DEWDFEMB14A.global.corp.sap> <5347E81F.50301@intec.ugent.be> <393554EDCF801348BC53C7813C6CB73B1AD2D078@DEWDFEMB14A.global.corp.sap> Message-ID: <5347EAF4.7090904@intec.ugent.be> Hi Markus, When will this testing take place and what will be tested in there? Will the GE be installed according to the installation manual? Will all tests be run on this installed GE or only the last R3 test cases? best regards, Koen On 4/11/2014 3:07 PM, Heller, Markus wrote: > > Hi Koen, > > Yes, you can decide in the first place (is best). If you have no > candidates, I am asked to assign someone according to process (worse > IMHO).... > > So yes, please name a partner -- inside or outside WP3, everyone can > do it basically. Some partners can test more than 1 and some partners > may not test at all (if everything is fine with the balance or so), > but each GE should be tested (or justified why not, see below Stefanos > requirements). > > Best > > Markus > > *From:*fiware-apps-bounces at lists.fi-ware.org > [mailto:fiware-apps-bounces at lists.fi-ware.org] *On Behalf Of *koen casier > *Sent:* Freitag, 11. April 2014 15:03 > *To:* fiware-apps at lists.fi-ware.org > *Subject:* Re: [Fiware-apps] Please act today Friday until 15:00 --> > RE: [Fiware-wpa] URGENT: GEis installation and test > > Dear Markus, > > > > For the business modeler and business calculator, the latest 3.3.3. > version is available for testing, > and all manuals have been updated on the private wiki as well and they > can be found linked under the R3 deliverable listing. > I have named all tests with a number indicating the release they were > available and useable so testers can quickly proceed to the right tests. > > Do I understand correctly that we should ourselves decide who should > test our stuff? > Or should we indicate what we want to have tested and/or what we want > to test? > For this last case, a random assignment of a test will be OK for me. > > > best regards, > Koen > > > On 4/11/2014 11:59 AM, Heller, Markus wrote: > > Hi, > > ...and please fill our your entry row for your GEs, that's why I > have copied the table. > > Do not edit it on Google Docs (I do not know if you have write > access anyway....). I nevertheless cannot edit the google docs > myself since I have no google account, so I will send a compiled > E-Mail later to Stefano. > > Instead, please do me the favor to just write back your table > entries to me in an email until 15:00 today, I put it together. > > How to fill in your table row ?I add help how to fill out the > entries, from Stefano: > > - "Release to test:" Example= ?? (a YES/NO, a > date when released so that a tester can start?, ...) > > the exact version number of the gei under test.this should be the > latest completely available at the moment of test, e.g. 3.x.x. > this field should be filled by the tester, but agreed with the wpl > > - "Testing applies?": Example= ?? (no clue... > a Name, a YES/NO, a report of the testing...?) > > "YES" if the gei is oss, so intsllation and deployment test can be > made, otherwise "NO". this field should be filled by the wpl > > - "testing on FI-LAB": Example= ?? (no clue... > a Name, a YES/NO, a report of the testing...?) > > "YES"if the gei, either oss or not, is equipped with recipes for > installation in fi-lab, otherwise "NO". this field should be > filled by the wpl > > - "Assigned tester:" Example= TID, ENG or Markus Heller (SAP) -- > person or company? > > certainly the name of the company. if you also have already the > name of the person responsible for the test, greater! > > *From:*Heller, Markus > *Sent:* Freitag, 11. April 2014 11:53 > *To:* FI-WARE Apps (fiware-apps at lists.fi-ware.org > ) > *Subject:* Please act today Friday until 15:00 --> RE: > [Fiware-wpa] URGENT: GEis installation and test > > *Chapter* > > > > *GE* > > > > *GEi* > > > > *Release to test* > > > > *Testing applies?* > > > > *Testing on FI-Lab?* > > > > *Assigned tester* > > > > Apps - WP3 > > > > Application Mashup > > > > Wirecloud > > > > > > > > > > Light Semantic Composition Editor > > > > COMPEL > > > > > > > > > > Marketplace > > > > Marketplace - SAP RI > > > > > > > > > > Mediator > > > > Mediator > > > > > > > > > > Mediator > > > > SETHA2 > > > > > > > > > > Registry > > > > Registry - SAP RI > > > > > > > > > > Repository > > > > Repository - SAP RI > > > > > > > > > > Revenue Settlement and Sharing System > > > > Revenue Settlement and Sharing System > > > > > > > > > > Service Composition > > > > Ericsson Composition Engine (ECE) > > > > > > > > > > Service Mashup > > > > Mashup Factory > > > > > > > > > > Store > > > > WStore > > > > > > > > > > Business Calculator > > > > Business Calculator > > > > > > > > > > Business Modeler > > > > Business Modeler > > > > > > > > Hi WP3, > > We have to carry out the installation and usage tests according to > the mail from Stefano below. I as WPL are asked to manage this > process. > > For a first round, please mail me until deadline *Friday today > 15:00 *which 1 (or 2) partners you propose to test your GE (1-2 > tests, minimum 1 test) -- as I have a task until today EOB to send > them to Stefano. > > Regardless of being Open Source or not, you are asked to have your > GE testes as described below, so nomination of test partner is no > problem and we can sort out details later also. > > Fallback: If you cannot mail, I will assign WP3 partners for you > in a fair manner. We can then reassign later next week until > Wednesday where needed. > > If you are in Easter Holidays next week, please act today asap and > mail to me who tests your stuff (approved by him or not) > > Best > > Markus > > --- > > *From:*fiware-wpa-bounces at lists.fi-ware.org > > [mailto:fiware-wpa-bounces at lists.fi-ware.org] *On Behalf Of > *stefano de panfilis > *Sent:* Dienstag, 8. April 2014 20:32 > > > *To:* fiware-wpl at lists.fi-ware.eu > ; > fiware-wpa at lists.fi-ware.eu > *Subject:* [Fiware-wpa] URGENT: GEis installation and test > > dear all, > > as discussed yesterday during our call and refined this > morning in the wp10 call, here is the procedure to install and > test the geis as requested in the scope of recommendation 18 > of the review report 6 excerpt of which is "/Obviously, hardly > any of the documentation can claim completeness in the > remaining time, but should at least cover all known grounds. > //To this end, extensive and directed installation and usage > tests should be performed -- not only through the Use Case > projects, but also within the consortium. For example, > partners not involved in the development of a specific Generic > Enabler can verify it through installation and testing. The > according results and findings should be incorporated in the > forthcoming Release 3 and the validation reporting of > deliverable D10.5.3/." > > the wpl migth already have received at this time an invitation > from me to access a googledoc (here again the link for your > convenience: > https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) > > this doc contains all the geis implemented at the moment or in > the very near future. > > 1. each wpl must, within this friday (11 april 2014), fill, in > agreement with their wp participants, the name of the > organisation responsible for installing a testing a specific > gei. in addition the wpl should declare which geis will be > tested. the overal rules are: > > 1.1 no geis of wp4 for what concerns fi-lab installation and test > > 1.2 only the geis of wp7 which do not require special network > environment > > 1.3 no geis for which do not exist an oss version > > 2. within 25 april 2014 all the installations and tests must > be completed either by the organisations leaving the project > at m36, and by those organisation if a test assigned to them > involve a gei owned by an organisation leaving the project at m36. > > 3. all the remaining installations and tests must be fulfilled > by 30 june 2014. > > the installation and tests must be documented using the form > described in the attached document. > > please note that, as you can easily guess from point 1 above, > there are two different kind of installations to be tested: > > 1. manual deplyoment, which involves all oss released geis > > 2. recipes supported deployment in the fi-ware testbed. this > case the person making the test must create a vm, which should > be removed immediately after the installation and test is > completed (due to the obvious resource cosumption) > > it would be great if the persons who will make the > installation and tests are completely outside the fi-ware > environment. > > this procedure refines and superseeds what sent by thorsten, > thank you for triggering the process, on last wednesday. > > for any clarification you migth need, please do not hesitate > to contact me. > > ciao, > > stefano > > -- > > Stefano De Panfilis > Chief Innovation Officer > Engineering Ingegneria Informatica S.p.A. > via Riccardo Morandi 32 > 00148 Roma > Italy > > tel (direct): +39-068307-4295 > tel (secr.): +39-068307-4513 > fax: +39-068307-4200 > cell: +39-335-7542-567 > > skype: depa01 > > > > -- > > Stefano De Panfilis > Chief Innovation Officer > Engineering Ingegneria Informatica S.p.A. > via Riccardo Morandi 32 > 00148 Roma > Italy > > tel (direct): +39-068307-4295 > tel (secr.): +39-068307-4513 > fax: +39-068307-4200 > cell: +39-335-7542-567 > > skype: depa01 > > > > > _______________________________________________ > > Fiware-apps mailing list > > Fiware-apps at lists.fi-ware.org > > https://lists.fi-ware.org/listinfo/fiware-apps > -------------- next part -------------- An HTML attachment was scrubbed... URL: From andreas.klein at sap.com Fri Apr 11 15:16:13 2014 From: andreas.klein at sap.com (Klein, Andreas) Date: Fri, 11 Apr 2014 13:16:13 +0000 Subject: [Fiware-apps] R3.3 SW Deliverables finalization - Deadline TODAY Message-ID: <556F697ADC3400408FBBCF7C6040979D967E23DE@DEWDFEMB15B.global.corp.sap> Dear WP3 partners, thanks for all your effort with regards to the SW related Deliverables. I am impressed! >From my point of view, our SW deliverables are in pretty good shape and almost ready for delivery: The only thing missing are the unit tests for the R3.3 Features of our Application Mashup Component. @Javier is it possible for you to finish this task eob? for completeness reasons and because I like green, here comes the tracking table: Inst and Admin User and Programmers Unit Testing Plan and Report Registry Store Business Modeler Business Calculator RSS Application Mashup - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition Thanks & Best Regards Andreas From: Klein, Andreas Sent: Dienstag, 8. April 2014 10:44 To: 'fiware-apps at lists.fi-ware.eu' Cc: 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' Subject: R3.3 SW Deliverables finalization - Deadline Friday 11.04 Dear WP3 partners, as you all know, our deadline for finishing the Software Related deliverables for R3.3 is this Friday (11.4). Thanks for all the progress you've made during last week! RSS, Store and Registry already look fine from my side. Application Mashup just needs to provide unit tests for new features. Some more work left is for Business Modeler, Business Calculator and Light Semantic Composition. Inst and Admin User and Programmers Unit Testing Plan and Report Registry page exists, content seems to be up to date page exists, content seems to be up to date page exists, new Features traced Store page exists please check if content needs update page exists page exists, new Features traced please check if content needs update Business Modeler page exists please check if content needs update please create page - please create Page - add test for features: -BMBCIntegrationPOC -ParameterConfiguration -RefactorDomainTier -RemodelGraphVisualization -RepositoryIntegration -LayoutConfiguration -ExtendedUserInteraction Business Calculator please create page please create page - please create Page - add test for features: -RSSIntegration -NetworkModelWizard -NetworkModelCalculator RSS page exists, content seems to be up to date page exists, content seems to be up to date page exists, new Features traced Application Mashup page exists, content seems to be up to date page exists, content seems to be up to date - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition page exists, content seems to be up to date please create page - please create Page - add test for features: -IntegrationWithMarketplace -IntegrationWithRepository -SupportForIdManagement -IntegrationWithUSDLEditor Keep up the effort and let's try to finish it in time! Thanks & Best Regards Andreas From: Klein, Andreas Sent: Donnerstag, 3. April 2014 11:43 To: 'fiware-apps at lists.fi-ware.eu' Cc: 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' Subject: R3.3 SW Deliverables preperation Dear WP3 partners, as you all know, R3.3 is coming up and we have to prepare our SW-Related deliverables in the private wiki. Input is required from GE Owners who release new Features within R3.3. So if you not have already done so, please create the following R3.3 pages for your GE: - Installation and Administration Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.3_FIWARE_Installation_and_Administration_Guide%22_WP3_Apps_Contribution_in_R3 - User and Programmers Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.4_FIWARE_User_and_Programmers_Guide%22_WP3_Apps_Contribution_in_R3 - Unit Testing Plan and Report: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.5_FIWARE_Unit_Testing_Plan_and_Report%22_WP3_Apps_Contribution_in_R3 If you keep a couple of basic rules in mind, it should be fairly easy to get the green light for delivery from TID :) So, please ensure that: - all new features are traced in the UTP - Open Specifications are linked in the User and Programmer Guide - you don't use absolute links for referencing Features, Specs, etc... - you don't use examples URIs like "http://localhost/a/b/c", use something like "http://[SERVER_URL]:[PORT]/a/b/c" instead - files are uploaded in forge and follow the naming schema Here is a list illustrating the current status + some comments what's obviously missing at the moment: Inst and Admin User and Programmers Unit Testing Plan and Report Registry please create page please create page - please create Page - add test for feature: -IntegrationWithIDManagementSystem Store page exists please check if content needs update page exists please check if content needs update page exists, new Features traced, perfect Business Modeler please create page please create page - please create Page - add test for features: -BMBCIntegrationPOC -ParameterConfiguration -RefactorDomainTier -RemodelGraphVisualization -RepositoryIntegration -LayoutConfiguration -ExtendedUserInteraction Business Calculator please create page please create page - please create Page - add test for features: -RSSIntegration -NetworkModelWizard -NetworkModelCalculator RSS page exists content seems to be up to date page exists please check if content needs update add test for feature -RSSS.ExpenditureManagement.ExpenditureLimits Application Mashup page exists content seems to be up to date page exists, content seems to be up to date - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition please create page please create page - please create Page - add test for features: -IntegrationWithMarketplace -IntegrationWithRepository -SupportForIdManagement -IntegrationWithUSDLEditor If you have any questions, comments or remarks, feel free to contact me. Best Andreas Andreas Klein SAP AG SAP Research Center Karlsruhe Vincenz-Priessnitz-Strasse 1 D - 76131 Karlsruhe T +49-6227-7-52554 -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Fri Apr 11 15:22:04 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 11 Apr 2014 13:22:04 +0000 Subject: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test In-Reply-To: <5347EAF4.7090904@intec.ugent.be> References: <393554EDCF801348BC53C7813C6CB73B1AD2CDAC@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2CDDF@DEWDFEMB14A.global.corp.sap> <5347E81F.50301@intec.ugent.be> <393554EDCF801348BC53C7813C6CB73B1AD2D078@DEWDFEMB14A.global.corp.sap> <5347EAF4.7090904@intec.ugent.be> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2D0D0@DEWDFEMB14A.global.corp.sap> Hi Koen, yes, that is the case. Your GEs will be tested until 25.4. ideally, deadline by Stefano ,see below. Tester has only your install material and aim is to let him try to finish the job of installation and usage with the given material / manuals for the GE. It is like Lutz Schubert has done - just seeing if manuals are useful to let others success with installation... For now, I would need a favorite candidate for your GEs, if you have. best wishes Markus you can see here Stefanos text: please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) .... 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. From: koen casier [mailto:koen.casier at intec.ugent.be] Sent: Freitag, 11. April 2014 15:16 To: Heller, Markus Cc: fiware-apps at lists.fi-ware.org Subject: Re: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Hi Markus, When will this testing take place and what will be tested in there? Will the GE be installed according to the installation manual? Will all tests be run on this installed GE or only the last R3 test cases? best regards, Koen On 4/11/2014 3:07 PM, Heller, Markus wrote: Hi Koen, Yes, you can decide in the first place (is best). If you have no candidates, I am asked to assign someone according to process (worse IMHO).... So yes, please name a partner - inside or outside WP3, everyone can do it basically. Some partners can test more than 1 and some partners may not test at all (if everything is fine with the balance or so), but each GE should be tested (or justified why not, see below Stefanos requirements). Best Markus From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of koen casier Sent: Freitag, 11. April 2014 15:03 To: fiware-apps at lists.fi-ware.org Subject: Re: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Dear Markus, For the business modeler and business calculator, the latest 3.3.3. version is available for testing, and all manuals have been updated on the private wiki as well and they can be found linked under the R3 deliverable listing. I have named all tests with a number indicating the release they were available and useable so testers can quickly proceed to the right tests. Do I understand correctly that we should ourselves decide who should test our stuff? Or should we indicate what we want to have tested and/or what we want to test? For this last case, a random assignment of a test will be OK for me. best regards, Koen On 4/11/2014 11:59 AM, Heller, Markus wrote: Hi, ...and please fill our your entry row for your GEs, that's why I have copied the table. Do not edit it on Google Docs (I do not know if you have write access anyway....). I nevertheless cannot edit the google docs myself since I have no google account, so I will send a compiled E-Mail later to Stefano. Instead, please do me the favor to just write back your table entries to me in an email until 15:00 today, I put it together. How to fill in your table row --> I add help how to fill out the entries, from Stefano: - "Release to test:" Example= ?? (a YES/NO, a date when released so that a tester can start?, ...) the exact version number of the gei under test. this should be the latest completely available at the moment of test, e.g. 3.x.x. this field should be filled by the tester, but agreed with the wpl - "Testing applies?": Example= ?? (no clue... a Name, a YES/NO, a report of the testing...?) "YES" if the gei is oss, so intsllation and deployment test can be made, otherwise "NO". this field should be filled by the wpl - "testing on FI-LAB": Example= ?? (no clue... a Name, a YES/NO, a report of the testing...?) "YES" if the gei, either oss or not, is equipped with recipes for installation in fi-lab, otherwise "NO". this field should be filled by the wpl - "Assigned tester:" Example= TID, ENG or Markus Heller (SAP) - person or company? certainly the name of the company. if you also have already the name of the person responsible for the test, greater! From: Heller, Markus Sent: Freitag, 11. April 2014 11:53 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud Light Semantic Composition Editor COMPEL Marketplace Marketplace - SAP RI Mediator Mediator Mediator SETHA2 Registry Registry - SAP RI Repository Repository - SAP RI Revenue Settlement and Sharing System Revenue Settlement and Sharing System Service Composition Ericsson Composition Engine (ECE) Service Mashup Mashup Factory Store WStore Business Calculator Business Calculator Business Modeler Business Modeler Hi WP3, We have to carry out the installation and usage tests according to the mail from Stefano below. I as WPL are asked to manage this process. For a first round, please mail me until deadline Friday today 15:00 which 1 (or 2) partners you propose to test your GE (1-2 tests, minimum 1 test) - as I have a task until today EOB to send them to Stefano. Regardless of being Open Source or not, you are asked to have your GE testes as described below, so nomination of test partner is no problem and we can sort out details later also. Fallback: If you cannot mail, I will assign WP3 partners for you in a fair manner. We can then reassign later next week until Wednesday where needed. If you are in Easter Holidays next week, please act today asap and mail to me who tests your stuff (approved by him or not) Best Markus --- From: fiware-wpa-bounces at lists.fi-ware.org [mailto:fiware-wpa-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 _______________________________________________ Fiware-apps mailing list Fiware-apps at lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-apps -------------- next part -------------- An HTML attachment was scrubbed... URL: From lucio at tid.es Fri Apr 11 15:27:03 2014 From: lucio at tid.es (JAVIER LUCIO RUIZ-ANDINO) Date: Fri, 11 Apr 2014 13:27:03 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B0694C9@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> Message-ID: <47E859DB20D4CD4281639C75E324CD8F694FEFD0@EX10-MB2-MAD.hi.inet> Dear Markus: I won?t be available next week for the audio conference ? Best regards, Javier Lucio De: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] En nombre de Heller, Markus Enviado el: viernes, 11 de abril de 2014 14:59 Para: 'fiware-apps at lists.fi-ware.eu' Asunto: Re: [Fiware-apps] FI-WARE: WP3 Call Hi all, Let me make a poll: Who of you is available next week (or in vacation) --> call to be dropped or held? Please all reply to all of us. Best Markus -----Original Appointment----- From: Heller, Markus Sent: Mittwoch, 24. April 2013 15:24 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Cc: Joaquin Iranzo Yuste; Ughetti Marco Subject: FI-WARE: WP3 Call When: Dienstag, 15. April 2014 15:00-16:00 (UTC+01:00) Amsterdam, Berlin, Bern, Rome, Stockholm, Vienna. Where: SAP Connect Markus Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From camille.reynders at iminds.be Fri Apr 11 15:34:49 2014 From: camille.reynders at iminds.be (Camille Reynders) Date: Fri, 11 Apr 2014 15:34:49 +0200 Subject: [Fiware-apps] FI-WARE: WP3 Call In-Reply-To: <47E859DB20D4CD4281639C75E324CD8F694FEFD0@EX10-MB2-MAD.hi.inet> References: <393554EDCF801348BC53C7813C6CB73B0694C9@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> <47E859DB20D4CD4281639C75E324CD8F694FEFD0@EX10-MB2-MAD.hi.inet> Message-ID: Hi all, I am able to attend the weekly conf call next week tuesday. Regards, Camille Reyners *Camille Reynders* Living Labs, Prototyping *iMinds vzw | Gaston Crommenlaan 8 box 102 | 9050 Ghent | Belgium | www.iminds.be * *T: | F: +32 9 331 48 05 | M: * On Fri, Apr 11, 2014 at 3:27 PM, JAVIER LUCIO RUIZ-ANDINO wrote: > > > Dear Markus: > > I won't be available next week for the audio conference L > > > > Best regards, > Javier Lucio > > > > *De:* fiware-apps-bounces at lists.fi-ware.org [mailto: > fiware-apps-bounces at lists.fi-ware.org] *En nombre de *Heller, Markus > *Enviado el:* viernes, 11 de abril de 2014 14:59 > *Para:* 'fiware-apps at lists.fi-ware.eu' > *Asunto:* Re: [Fiware-apps] FI-WARE: WP3 Call > > > > Hi all, > > > > Let me make a poll: Who of you is available next week (or in vacation) ?call to be dropped or held? Please all reply to all of us. > > > > Best > > Markus > > > > > > -----Original Appointment----- > *From:* Heller, Markus > *Sent:* Mittwoch, 24. April 2013 15:24 > *To:* Heller, Markus; 'fiware-apps at lists.fi-ware.eu' > *Cc:* Joaquin Iranzo Yuste; Ughetti Marco > *Subject:* FI-WARE: WP3 Call > *When:* Dienstag, 15. April 2014 15:00-16:00 (UTC+01:00) Amsterdam, > Berlin, Bern, Rome, Stockholm, Vienna. > *Where:* SAP Connect Markus > > > > > > Dear FI-WARE WP3 colleagues, > > > > I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in > info below. > > > > Best wishes > > Markus > > > > ---- > > > > > > Please join me in a SAP CONNECT meeting. > > > > Web conference: *https://sap.emea.pgiconnect.com/heller* > > > > Audio Participant Code: *124 225 33 29* > > > > *Country* > > *Number* > > *Blackberry Friendly / Lync Friendly* > > *(if you are running SAP Lync Quality Advisor)* > > *Android Friendly* > > Germany, Frankfurt > > tel:+4969222210764 <+4969222210764> > > tel:+4969222210764x1242253329# <+4969222210764x1242253329> > > tel:+4969222210764;1242253329# <+4969222210764;1242253329> > > Germany, Munich > > tel:+4989710424682 <+4989710424682> > > tel:+4989710424682x1242253329# <+4989710424682x1242253329> > > tel:+4989710424682;1242253329# <+4989710424682;1242253329> > > *Europe* > > Austria, Vienna > > tel:+431253021750 <+431253021750> > > tel:+431253021750x1242253329# <+431253021750x1242253329> > > tel:+431253021750;1242253329# <+431253021750;1242253329> > > France, Paris > > tel:+33170701777 <+33170701777> > > tel:+33170701777x1242253329# <+33170701777x1242253329> > > tel:+33170701777;1242253329# <+33170701777;1242253329> > > Italy, Milan > > tel:+390236009839 <+390236009839> > > tel:+390236009839x1242253329# <+390236009839x1242253329> > > tel:+390236009839;1242253329# <+390236009839;1242253329> > > Spain, Madrid > > tel:+34917699443 <+34917699443> > > tel:+34917699443x1242253329# <+34917699443x1242253329> > > tel:+34917699443;1242253329# <+34917699443;1242253329> > > Switzerland, Zurich > > tel:+41434569248 <+41434569248> > > tel:+41434569248x1242253329# <+41434569248x1242253329> > > tel:+41434569248;1242253329# <+41434569248;1242253329> > > UK, London > > tel:+442033645639 <+442033645639> > > tel:+442033645639x1242253329# <+442033645639x1242253329> > > tel:+442033645639;1242253329# <+442033645639;1242253329> > > *Overseas* > > Australia, Sydney > > tel:+61290090688 <+61290090688> > > tel:+61290090688x1242253329# <+61290090688x1242253329> > > tel:+61290090688;1242253329# <+61290090688;1242253329> > > India, Bangalore > > tel:+918061275055 <+918061275055> > > tel:+918061275055x1242253329# <+918061275055x1242253329> > > tel:+918061275055;1242253329# <+918061275055;1242253329> > > USA, New York > > tel:+16464340499 <+16464340499> > > tel:+16464340499x1242253329# <+16464340499x1242253329> > > tel:+16464340499;1242253329# <+16464340499;1242253329> > > > > > > If you have never attended a Connect Pro meeting before: > Test your connection: > https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm > Get a quick overview: http://www.adobe.com/go/connectpro_overview > > Adobe, the Adobe > > > > > > > > > > > > > > > > > > ------------------------------ > > Este mensaje se dirige exclusivamente a su destinatario. Puede consultar > nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace > situado m?s abajo. > This message is intended exclusively for its addressee. We only send and > receive email on the basis of the terms set out at: > http://www.tid.es/ES/PAGINAS/disclaimer.aspx > > _______________________________________________ > Fiware-apps mailing list > Fiware-apps at lists.fi-ware.org > https://lists.fi-ware.org/listinfo/fiware-apps > > -------------- next part -------------- An HTML attachment was scrubbed... URL: From fdelavega at conwet.com Fri Apr 11 16:01:22 2014 From: fdelavega at conwet.com (Francisco de la Vega) Date: Fri, 11 Apr 2014 16:01:22 +0200 Subject: [Fiware-apps] FI-WARE: WP3 Call In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B0694C9@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> Message-ID: Hi Markus, I will be able to attend the call on Tuesday. BR, Francisco 2014-04-11 14:59 GMT+02:00 Heller, Markus : > Hi all, > > Let me make a poll: Who of you is available next week (or in vacation) ?call to be dropped or held? Please all reply to all of us. > > Best > Markus > > > -----Original Appointment----- > *From:* Heller, Markus > *Sent:* Mittwoch, 24. April 2013 15:24 > *To:* Heller, Markus; 'fiware-apps at lists.fi-ware.eu' > *Cc:* Joaquin Iranzo Yuste; Ughetti Marco > *Subject:* FI-WARE: WP3 Call > *When:* Dienstag, 15. April 2014 15:00-16:00 (UTC+01:00) Amsterdam, > Berlin, Bern, Rome, Stockholm, Vienna. > *Where:* SAP Connect Markus > > > Dear FI-WARE WP3 colleagues, > > I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in > info below. > > Best wishes > Markus > > ---- > > > Please join me in a SAP CONNECT meeting. > > Web conference: *https://sap.emea.pgiconnect.com/heller* > > Audio Participant Code: *124 225 33 29* > *Country* *Number* *Blackberry Friendly / Lync Friendly* > *(if you are running SAP Lync Quality Advisor)* > *Android Friendly* Germany, Frankfurt *tel:+4969222210764*<+4969222210764> > *tel:+4969222210764x1242253329#* <+4969222210764x1242253329> > *tel:+4969222210764;1242253329#* <+4969222210764;1242253329> Germany, > Munich *tel:+4989710424682* <+4989710424682> > *tel:+4989710424682x1242253329#* <+4989710424682x1242253329> > *tel:+4989710424682;1242253329#* <+4989710424682;1242253329> *Europe* > Austria, Vienna *tel:+431253021750* <+431253021750> > *tel:+431253021750x1242253329#* <+431253021750x1242253329> > *tel:+431253021750;1242253329#* <+431253021750;1242253329> France, > Paris *tel:+33170701777* <+33170701777> > *tel:+33170701777x1242253329#* <+33170701777x1242253329> > *tel:+33170701777;1242253329#* <+33170701777;1242253329> Italy, > Milan *tel:+390236009839* <+390236009839> > *tel:+390236009839x1242253329#* <+390236009839x1242253329> > *tel:+390236009839;1242253329#* <+390236009839;1242253329> Spain, > Madrid *tel:+34917699443* <+34917699443> > *tel:+34917699443x1242253329#* <+34917699443x1242253329> > *tel:+34917699443;1242253329#* <+34917699443;1242253329> Switzerland, > Zurich *tel:+41434569248* <+41434569248> *tel:+41434569248x1242253329#*<+41434569248x1242253329> > *tel:+41434569248;1242253329#* <+41434569248;1242253329> UK, > London *tel:+442033645639* <+442033645639> > *tel:+442033645639x1242253329#* <+442033645639x1242253329> > *tel:+442033645639;1242253329#* <+442033645639;1242253329> *Overseas* > Australia, Sydney *tel:+61290090688* <+61290090688> > *tel:+61290090688x1242253329#* <+61290090688x1242253329> > *tel:+61290090688;1242253329#* <+61290090688;1242253329> India, > Bangalore *tel:+918061275055* <+918061275055> > *tel:+918061275055x1242253329#* <+918061275055x1242253329> > *tel:+918061275055;1242253329#* <+918061275055;1242253329> USA, New > York *tel:+16464340499* <+16464340499> > *tel:+16464340499x1242253329#* <+16464340499x1242253329> > *tel:+16464340499;1242253329#* <+16464340499;1242253329> > > > If you have never attended a Connect Pro meeting before: > Test your connection: > *https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm* > Get a quick overview: *http://www.adobe.com/go/connectpro_overview* > Adobe, the Adobe > > > > > > > > > > _______________________________________________ > Fiware-apps mailing list > Fiware-apps at lists.fi-ware.org > https://lists.fi-ware.org/listinfo/fiware-apps > > -------------- next part -------------- An HTML attachment was scrubbed... URL: From aarranz at conwet.com Fri Apr 11 16:15:50 2014 From: aarranz at conwet.com (=?UTF-8?Q?=C3=81lvaro_Arranz?=) Date: Fri, 11 Apr 2014 16:15:50 +0200 Subject: [Fiware-apps] R3.3 SW Deliverables finalization - Deadline TODAY In-Reply-To: <556F697ADC3400408FBBCF7C6040979D967E23DE@DEWDFEMB15B.global.corp.sap> References: <556F697ADC3400408FBBCF7C6040979D967E23DE@DEWDFEMB15B.global.corp.sap> Message-ID: Hi Andreas, we're working on it, it'll be finished today eob. Nevertheless, take into account that the following Features were dismissed: - SupportForOpenSocial - SupportForW3CWidgets - AllowHostingWidgetsInContainerApp Best regards, ?lvaro On 11 April 2014 15:16, Klein, Andreas wrote: > Dear WP3 partners, > > > > thanks for all your effort with regards to the SW related Deliverables. I > am impressed! > > From my point of view, our SW deliverables are in pretty good shape and > almost ready for delivery: > > > > The only thing missing are the unit tests for the R3.3 Features of our > Application Mashup Component. > > *@Javier is it possible for you to finish this task eob?* > > > > for completeness reasons and because I like green, here comes the tracking > table: > > > > *Inst and Admin* > > *User and Programmers * > > *Unit Testing Plan and Report* > > Registry > > > > > > > > Store > > > > > > > > > > Business Modeler > > > > > > > > Business Calculator > > > > > > > > RSS > > > > > > > > *Application Mashup* > > > > > > - please create Page > > - add test for features: > > -SupportForOpenSocial > > -SupportForW3CWidgets > > -AllowHostingWidgetsInContainerApp > > -AllowHostingWidgetsInWebBasedSystem > > Light Semantic Composition > > > > > > > > > > Thanks & Best Regards > > > > Andreas > > > > > > *From:* Klein, Andreas > *Sent:* Dienstag, 8. April 2014 10:44 > *To:* 'fiware-apps at lists.fi-ware.eu' > *Cc:* 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' > *Subject:* R3.3 SW Deliverables finalization - Deadline Friday 11.04 > > > > Dear WP3 partners, > > > > as you all know, our *deadline* for finishing the Software Related > deliverables for R3.3 is *this Friday (11.4)*. Thanks for all the > progress you?ve made during last week! > > RSS, Store and Registry already look fine from my side. Application Mashup > just needs to provide unit tests for new features. Some more work left is > for Business Modeler, Business Calculator and Light Semantic Composition. > > > > > > *Inst and Admin* > > *User and Programmers * > > *Unit Testing Plan and Report* > > Registry > > page exists, content seems to be up to date > > page exists, content seems to be up to date > > page exists, new Features traced > > Store > > page exists > please check if content needs update > > page exists > > page exists, new Features traced > > please check if content needs update > > *Business Modeler* > > page exists > please check if content needs update > > please create page > > - please create Page > > - add test for features: > > -BMBCIntegrationPOC > > -ParameterConfiguration > > -RefactorDomainTier > > -RemodelGraphVisualization > > -RepositoryIntegration > > -LayoutConfiguration > > -ExtendedUserInteraction > > *Business Calculator* > > please create page > > please create page > > - please create Page > > - add test for features: > > -RSSIntegration > > -NetworkModelWizard > > -NetworkModelCalculator > > RSS > > page exists, content seems to be up to date > > page exists, content seems to be up to date > > page exists, new Features traced > > *Application Mashup* > > page exists, content seems to be up to date > > page exists, content seems to be up to date > > - please create Page > > - add test for features: > > -SupportForOpenSocial > > -SupportForW3CWidgets > > -AllowHostingWidgetsInContainerApp > > -AllowHostingWidgetsInWebBasedSystem > > *Light Semantic Composition* > > page exists, content seems to be up to date > > please create page > > - please create Page > > - add test for features: > > -IntegrationWithMarketplace > > -IntegrationWithRepository > > -SupportForIdManagement > > -IntegrationWithUSDLEditor > > > > Keep up the effort and let?s try to finish it in time! > > > > Thanks & Best Regards > > > > Andreas > > > > > > > > *From:* Klein, Andreas > *Sent:* Donnerstag, 3. April 2014 11:43 > *To:* 'fiware-apps at lists.fi-ware.eu' > *Cc:* 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' > *Subject:* R3.3 SW Deliverables preperation > > > > Dear WP3 partners, > > > > as you all know, R3.3 is coming up and we have to prepare our SW-Related > deliverables in the private wiki. > > Input is required from GE Owners who release new Features within R3.3. > > So if you not have already done so, please create the following R3.3 pages > for your GE: > > > > - Installation and Administration Guide: > > *https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.3_FIWARE_Installation_and_Administration_Guide%22_WP3_Apps_Contribution_in_R3 > * > > - User and Programmers Guide: > > *https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.4_FIWARE_User_and_Programmers_Guide%22_WP3_Apps_Contribution_in_R3 > * > > - Unit Testing Plan and Report: > > *https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.5_FIWARE_Unit_Testing_Plan_and_Report%22_WP3_Apps_Contribution_in_R3 > * > > > > If you keep a couple of basic rules in mind, it should be fairly easy to > get the green light for delivery from TID J > > So, please ensure that: > > > > - all new features are traced in the UTP > > - Open Specifications are linked in the User and Programmer Guide > > - you don?t use absolute links for referencing Features, Specs, > etc? > > - you don?t use examples URIs like ?http://localhost/a/b/c?, use > something like ?http://[SERVER_URL]:[PORT]/a/b/c? instead > > - files are uploaded in forge and follow the naming schema > > > > > > Here is a list illustrating the current status + some comments what?s > obviously missing at the moment: > > > > *Inst and Admin* > > *User and Programmers * > > *Unit Testing Plan and Report* > > *Registry* > > please create page > > please create page > > - please create Page > - add test for feature: > -IntegrationWithIDManagementSystem > > *Store* > > page exists > please check if content needs update > > page exists > please check if content needs update > > page exists, new Features traced, perfect > > *Business Modeler* > > please create page > > please create page > > - please create Page > - add test for features: > -BMBCIntegrationPOC > -ParameterConfiguration > -RefactorDomainTier > -RemodelGraphVisualization > -RepositoryIntegration > -LayoutConfiguration > -ExtendedUserInteraction > > *Business Calculator* > > please create page > > please create page > > - please create Page > - add test for features: > -RSSIntegration > -NetworkModelWizard > -NetworkModelCalculator > > *RSS* > > page exists > content seems to be up to date > > page exists > please check if content needs update > > add test for feature > -RSSS.ExpenditureManagement.ExpenditureLimits > > *Application Mashup* > > page exists > content seems to be up to date > > page exists, content seems to be up to date > > - please create Page > - add test for features: > -SupportForOpenSocial > -SupportForW3CWidgets > -AllowHostingWidgetsInContainerApp > -AllowHostingWidgetsInWebBasedSystem > > *Light Semantic Composition* > > please create page > > please create page > > - please create Page > - add test for features: > -IntegrationWithMarketplace > -IntegrationWithRepository > -SupportForIdManagement > -IntegrationWithUSDLEditor > > > > > > > > If you have any questions, comments or remarks, feel free to contact me. > > > > Best > > > > Andreas > > > > > > Andreas Klein > > SAP AG > > SAP Research Center Karlsruhe > > Vincenz-Priessnitz-Strasse 1 > > D - 76131 Karlsruhe > > > > T +49-6227-7-52554 > > > > _______________________________________________ > Fiware-apps mailing list > Fiware-apps at lists.fi-ware.org > https://lists.fi-ware.org/listinfo/fiware-apps > > -------------- next part -------------- An HTML attachment was scrubbed... URL: From andreas.klein at sap.com Fri Apr 11 16:22:20 2014 From: andreas.klein at sap.com (Klein, Andreas) Date: Fri, 11 Apr 2014 14:22:20 +0000 Subject: [Fiware-apps] R3.3 SW Deliverables finalization - Deadline TODAY In-Reply-To: References: <556F697ADC3400408FBBCF7C6040979D967E23DE@DEWDFEMB15B.global.corp.sap> Message-ID: <556F697ADC3400408FBBCF7C6040979D967E242F@DEWDFEMB15B.global.corp.sap> Hi ?lvaro, thanks for the reply and your hint. I wasn?t aware that * SupportForOpenSocial * SupportForW3CWidgets * AllowHostingWidgetsInContainerApp are dismissed. I?ve seen that you have already removed them from our Roadmap ? perfect! Then you need just to add a test for AllowHostingWidgetsInWebBasedSystem and we are good to go ? Thanks & Best Regards Andreas From: ?lvaro Arranz [mailto:aarranz at conwet.com] Sent: Freitag, 11. April 2014 16:16 To: Klein, Andreas Cc: fiware-apps at lists.fi-ware.eu Subject: Re: [Fiware-apps] R3.3 SW Deliverables finalization - Deadline TODAY Hi Andreas, we're working on it, it'll be finished today eob. Nevertheless, take into account that the following Features were dismissed: * SupportForOpenSocial * SupportForW3CWidgets * AllowHostingWidgetsInContainerApp Best regards, ?lvaro On 11 April 2014 15:16, Klein, Andreas > wrote: Dear WP3 partners, thanks for all your effort with regards to the SW related Deliverables. I am impressed! From my point of view, our SW deliverables are in pretty good shape and almost ready for delivery: The only thing missing are the unit tests for the R3.3 Features of our Application Mashup Component. @Javier is it possible for you to finish this task eob? for completeness reasons and because I like green, here comes the tracking table: Inst and Admin User and Programmers Unit Testing Plan and Report Registry Store Business Modeler Business Calculator RSS Application Mashup - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition Thanks & Best Regards Andreas From: Klein, Andreas Sent: Dienstag, 8. April 2014 10:44 To: 'fiware-apps at lists.fi-ware.eu' Cc: 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' Subject: R3.3 SW Deliverables finalization - Deadline Friday 11.04 Dear WP3 partners, as you all know, our deadline for finishing the Software Related deliverables for R3.3 is this Friday (11.4). Thanks for all the progress you?ve made during last week! RSS, Store and Registry already look fine from my side. Application Mashup just needs to provide unit tests for new features. Some more work left is for Business Modeler, Business Calculator and Light Semantic Composition. Inst and Admin User and Programmers Unit Testing Plan and Report Registry page exists, content seems to be up to date page exists, content seems to be up to date page exists, new Features traced Store page exists please check if content needs update page exists page exists, new Features traced please check if content needs update Business Modeler page exists please check if content needs update please create page - please create Page - add test for features: -BMBCIntegrationPOC -ParameterConfiguration -RefactorDomainTier -RemodelGraphVisualization -RepositoryIntegration -LayoutConfiguration -ExtendedUserInteraction Business Calculator please create page please create page - please create Page - add test for features: -RSSIntegration -NetworkModelWizard -NetworkModelCalculator RSS page exists, content seems to be up to date page exists, content seems to be up to date page exists, new Features traced Application Mashup page exists, content seems to be up to date page exists, content seems to be up to date - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition page exists, content seems to be up to date please create page - please create Page - add test for features: -IntegrationWithMarketplace -IntegrationWithRepository -SupportForIdManagement -IntegrationWithUSDLEditor Keep up the effort and let?s try to finish it in time! Thanks & Best Regards Andreas From: Klein, Andreas Sent: Donnerstag, 3. April 2014 11:43 To: 'fiware-apps at lists.fi-ware.eu' Cc: 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' Subject: R3.3 SW Deliverables preperation Dear WP3 partners, as you all know, R3.3 is coming up and we have to prepare our SW-Related deliverables in the private wiki. Input is required from GE Owners who release new Features within R3.3. So if you not have already done so, please create the following R3.3 pages for your GE: - Installation and Administration Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.3_FIWARE_Installation_and_Administration_Guide%22_WP3_Apps_Contribution_in_R3 - User and Programmers Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.4_FIWARE_User_and_Programmers_Guide%22_WP3_Apps_Contribution_in_R3 - Unit Testing Plan and Report: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.5_FIWARE_Unit_Testing_Plan_and_Report%22_WP3_Apps_Contribution_in_R3 If you keep a couple of basic rules in mind, it should be fairly easy to get the green light for delivery from TID ? So, please ensure that: - all new features are traced in the UTP - Open Specifications are linked in the User and Programmer Guide - you don?t use absolute links for referencing Features, Specs, etc? - you don?t use examples URIs like ?http://localhost/a/b/c?, use something like ?http://[SERVER_URL]:[PORT]/a/b/c? instead - files are uploaded in forge and follow the naming schema Here is a list illustrating the current status + some comments what?s obviously missing at the moment: Inst and Admin User and Programmers Unit Testing Plan and Report Registry please create page please create page - please create Page - add test for feature: -IntegrationWithIDManagementSystem Store page exists please check if content needs update page exists please check if content needs update page exists, new Features traced, perfect Business Modeler please create page please create page - please create Page - add test for features: -BMBCIntegrationPOC -ParameterConfiguration -RefactorDomainTier -RemodelGraphVisualization -RepositoryIntegration -LayoutConfiguration -ExtendedUserInteraction Business Calculator please create page please create page - please create Page - add test for features: -RSSIntegration -NetworkModelWizard -NetworkModelCalculator RSS page exists content seems to be up to date page exists please check if content needs update add test for feature -RSSS.ExpenditureManagement.ExpenditureLimits Application Mashup page exists content seems to be up to date page exists, content seems to be up to date - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition please create page please create page - please create Page - add test for features: -IntegrationWithMarketplace -IntegrationWithRepository -SupportForIdManagement -IntegrationWithUSDLEditor If you have any questions, comments or remarks, feel free to contact me. Best Andreas Andreas Klein SAP AG SAP Research Center Karlsruhe Vincenz-Priessnitz-Strasse 1 D - 76131 Karlsruhe T +49-6227-7-52554 _______________________________________________ Fiware-apps mailing list Fiware-apps at lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-apps -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Fri Apr 11 16:44:18 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 11 Apr 2014 14:44:18 +0000 Subject: [Fiware-apps] Fi-WARE: WP3 - GE installation testing plan Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2D21F@DEWDFEMB14A.global.corp.sap> Dear Stefano, here I attach our entries for the table from APPS. This is our plan as of today. Sadly I do not have a google docs account, so I cannot enter it there, but I hope you could please copy it to the google docs? As requested, where commitments were not possible, WPL has made tester assignments which are pending confirmation in the next week. - Partners who still need to commit to test a GE: TI, THALES, IMINDS. - Partners who have committed to test a GE: ATOS, UPM, SAP, TID - Partners not active and will not test: DT, EAB Best wishes Markus Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud YES NO SAP - confirmed Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner Registry Registry - SAP RI 3.2 YES NO ATOS - to be confirmed - assigned by WPL Repository Repository - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Revenue Settlement and Sharing System Revenue Settlement and Sharing System 3.3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds Koen - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore 3.3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 39088 bytes Desc: not available URL: From markus.heller at sap.com Fri Apr 11 16:57:09 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 11 Apr 2014 14:57:09 +0000 Subject: [Fiware-apps] FW: Fi-WARE: WP3 - GE installation testing plan In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2D21F@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD2D21F@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2D267@DEWDFEMB14A.global.corp.sap> Hi all, This is the outcome of the planning which we had to deliver to Stefano today. Thank you to those who have answered today and confirmed their testing of a GE. My rule for assignment: Each GE gets tested and each partner tests at least 1 GE. I had to fill all tester positions, as I was requested to do so according to the procedure. Proposal: As such test exercise is a 30-minute-task or so, please simply accept the assignments for testing - all of us need to test. If changes are needed, you need to find a switching partner by yourself and try to switch the GE testing tasks with him. Then mail me the switch after you have received the other partner's agreement to switch. Please note that I cannot accept that someone does not want to test a GE in order to be fair to all partner - as you may understand. If you think your case is unfair or so, please of course as usual contact me. @ALL: Please start with these tests now individually and do the reports as Stefano demanded in his guidelines (separate mails from him). All partners have to contact the GE owner to organize all aspects of testing individually. The tester and the tested are bot responsible individually to perform the test and report and to comply to Stefano's guidelines fully. I as WPL will only track the progress von time to time. Best wishes Markus From: Heller, Markus Sent: Freitag, 11. April 2014 16:44 To: Stefano de Panfilis (stefano.depanfilis at eng.it) Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Fi-WARE: WP3 - GE installation testing plan Dear Stefano, here I attach our entries for the table from APPS. This is our plan as of today. Sadly I do not have a google docs account, so I cannot enter it there, but I hope you could please copy it to the google docs? As requested, where commitments were not possible, WPL has made tester assignments which are pending confirmation in the next week. - Partners who still need to commit to test a GE: TI, THALES, IMINDS. - Partners who have committed to test a GE: ATOS, UPM, SAP, TID - Partners not active and will not test: DT, EAB Best wishes Markus Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud YES NO SAP - confirmed Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner Registry Registry - SAP RI 3.2 YES NO ATOS - to be confirmed - assigned by WPL Repository Repository - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Revenue Settlement and Sharing System Revenue Settlement and Sharing System 3.3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds Koen - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore 3.3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 43012 bytes Desc: not available URL: From markus.heller at sap.com Fri Apr 11 17:48:46 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 11 Apr 2014 15:48:46 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B0694C9@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2D026@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2D3D2@DEWDFEMB14A.global.corp.sap> Hi all, Thanks, the WP3 call next week will happen as most of us attend. Best Markus _____________________________________________ From: Heller, Markus Sent: Freitag, 11. April 2014 14:59 To: 'fiware-apps at lists.fi-ware.eu' Cc: Joaquin Iranzo Yuste; Ughetti Marco Subject: RE: FI-WARE: WP3 Call Hi all, Let me make a poll: Who of you is available next week (or in vacation) --> call to be dropped or held? Please all reply to all of us. Best Markus -----Original Appointment----- From: Heller, Markus Sent: Mittwoch, 24. April 2013 15:24 To: Heller, Markus; 'fiware-apps at lists.fi-ware.eu' Cc: Joaquin Iranzo Yuste; Ughetti Marco Subject: FI-WARE: WP3 Call When: Dienstag, 15. April 2014 15:00-16:00 (UTC+01:00) Amsterdam, Berlin, Bern, Rome, Stockholm, Vienna. Where: SAP Connect Markus Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Apr 14 08:34:36 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 14 Apr 2014 06:34:36 +0000 Subject: [Fiware-apps] FW: Backlog Content: Updated reports In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90BB31BCE68@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90BB31BCE68@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2DAB1@DEWDFEMB14A.global.corp.sap> FYI From: fiware-ge-owners-bounces at lists.fi-ware.org [mailto:fiware-ge-owners-bounces at lists.fi-ware.org] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Samstag, 12. April 2014 08:31 To: fiware-ge-owners at lists.fi-ware.org Cc: fiware-wpl at lists.fi-ware.org; fiware-wpa at lists.fi-ware.org Subject: [Fiware-ge-owners] Backlog Content: Updated reports Dear GEI Owners, Please, find linked below backlog's reports Dashboards: https://forge.fi-ware.org/docman/view.php/27/3778/FIWARE.backlog.apps.dashboard.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3779/FIWARE.backlog.cloud.dashboard.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3782/FIWARE.backlog.iot.dashboard.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3780/FIWARE.backlog.data.dashboard.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3781/FIWARE.backlog.i2nd.dashboard.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3784/FIWARE.backlog.security.dashboard.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3783/FIWARE.backlog.miwi.dashboard.20140412.xlsx Reviews: https://forge.fi-ware.org/docman/view.php/27/3785/FIWARE.backlog.apps.review.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3786/FIWARE.backlog.cloud.review.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3789/FIWARE.backlog.iot.review.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3787/FIWARE.backlog.data.review.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3788/FIWARE.backlog.i2nd.review.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3791/FIWARE.backlog.security.review.20140412.xlsx https://forge.fi-ware.org/docman/view.php/27/3790/FIWARE.backlog.miwi.review.20140412.xlsx Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 13267 bytes Desc: not available URL: From andreas.klein at sap.com Mon Apr 14 09:29:44 2014 From: andreas.klein at sap.com (Klein, Andreas) Date: Mon, 14 Apr 2014 07:29:44 +0000 Subject: [Fiware-apps] R3.3 SW Deliverables finalization - Deadline TODAY Message-ID: <556F697ADC3400408FBBCF7C6040979D967E25E3@DEWDFEMB15B.global.corp.sap> Dear WP3 partners, let me thank you again for all your R3.3 related efforts, we are complete since Friday evening and ready for delivery. We will spread the good news in the WPL/WPA call today. Thanks & Best Regards Andreas From: Klein, Andreas Sent: Freitag, 11. April 2014 15:16 To: 'fiware-apps at lists.fi-ware.eu' Cc: 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' Subject: RE: R3.3 SW Deliverables finalization - Deadline TODAY Dear WP3 partners, thanks for all your effort with regards to the SW related Deliverables. I am impressed! >From my point of view, our SW deliverables are in pretty good shape and almost ready for delivery: The only thing missing are the unit tests for the R3.3 Features of our Application Mashup Component. @Javier is it possible for you to finish this task eob? for completeness reasons and because I like green, here comes the tracking table: Inst and Admin User and Programmers Unit Testing Plan and Report Registry Store Business Modeler Business Calculator RSS Application Mashup - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition Thanks & Best Regards Andreas From: Klein, Andreas Sent: Dienstag, 8. April 2014 10:44 To: 'fiware-apps at lists.fi-ware.eu' Cc: 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' Subject: R3.3 SW Deliverables finalization - Deadline Friday 11.04 Dear WP3 partners, as you all know, our deadline for finishing the Software Related deliverables for R3.3 is this Friday (11.4). Thanks for all the progress you've made during last week! RSS, Store and Registry already look fine from my side. Application Mashup just needs to provide unit tests for new features. Some more work left is for Business Modeler, Business Calculator and Light Semantic Composition. Inst and Admin User and Programmers Unit Testing Plan and Report Registry page exists, content seems to be up to date page exists, content seems to be up to date page exists, new Features traced Store page exists please check if content needs update page exists page exists, new Features traced please check if content needs update Business Modeler page exists please check if content needs update please create page - please create Page - add test for features: -BMBCIntegrationPOC -ParameterConfiguration -RefactorDomainTier -RemodelGraphVisualization -RepositoryIntegration -LayoutConfiguration -ExtendedUserInteraction Business Calculator please create page please create page - please create Page - add test for features: -RSSIntegration -NetworkModelWizard -NetworkModelCalculator RSS page exists, content seems to be up to date page exists, content seems to be up to date page exists, new Features traced Application Mashup page exists, content seems to be up to date page exists, content seems to be up to date - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition page exists, content seems to be up to date please create page - please create Page - add test for features: -IntegrationWithMarketplace -IntegrationWithRepository -SupportForIdManagement -IntegrationWithUSDLEditor Keep up the effort and let's try to finish it in time! Thanks & Best Regards Andreas From: Klein, Andreas Sent: Donnerstag, 3. April 2014 11:43 To: 'fiware-apps at lists.fi-ware.eu' Cc: 'Heller, Markus (markus.heller at sap.com)'; 'Sandfuchs, Thorsten' Subject: R3.3 SW Deliverables preperation Dear WP3 partners, as you all know, R3.3 is coming up and we have to prepare our SW-Related deliverables in the private wiki. Input is required from GE Owners who release new Features within R3.3. So if you not have already done so, please create the following R3.3 pages for your GE: - Installation and Administration Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.3_FIWARE_Installation_and_Administration_Guide%22_WP3_Apps_Contribution_in_R3 - User and Programmers Guide: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.4_FIWARE_User_and_Programmers_Guide%22_WP3_Apps_Contribution_in_R3 - Unit Testing Plan and Report: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FI-WARE_Deliverable_%22D*.5_FIWARE_Unit_Testing_Plan_and_Report%22_WP3_Apps_Contribution_in_R3 If you keep a couple of basic rules in mind, it should be fairly easy to get the green light for delivery from TID :) So, please ensure that: - all new features are traced in the UTP - Open Specifications are linked in the User and Programmer Guide - you don't use absolute links for referencing Features, Specs, etc... - you don't use examples URIs like "http://localhost/a/b/c", use something like "http://[SERVER_URL]:[PORT]/a/b/c" instead - files are uploaded in forge and follow the naming schema Here is a list illustrating the current status + some comments what's obviously missing at the moment: Inst and Admin User and Programmers Unit Testing Plan and Report Registry please create page please create page - please create Page - add test for feature: -IntegrationWithIDManagementSystem Store page exists please check if content needs update page exists please check if content needs update page exists, new Features traced, perfect Business Modeler please create page please create page - please create Page - add test for features: -BMBCIntegrationPOC -ParameterConfiguration -RefactorDomainTier -RemodelGraphVisualization -RepositoryIntegration -LayoutConfiguration -ExtendedUserInteraction Business Calculator please create page please create page - please create Page - add test for features: -RSSIntegration -NetworkModelWizard -NetworkModelCalculator RSS page exists content seems to be up to date page exists please check if content needs update add test for feature -RSSS.ExpenditureManagement.ExpenditureLimits Application Mashup page exists content seems to be up to date page exists, content seems to be up to date - please create Page - add test for features: -SupportForOpenSocial -SupportForW3CWidgets -AllowHostingWidgetsInContainerApp -AllowHostingWidgetsInWebBasedSystem Light Semantic Composition please create page please create page - please create Page - add test for features: -IntegrationWithMarketplace -IntegrationWithRepository -SupportForIdManagement -IntegrationWithUSDLEditor If you have any questions, comments or remarks, feel free to contact me. Best Andreas Andreas Klein SAP AG SAP Research Center Karlsruhe Vincenz-Priessnitz-Strasse 1 D - 76131 Karlsruhe T +49-6227-7-52554 -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Apr 14 11:33:20 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 14 Apr 2014 09:33:20 +0000 Subject: [Fiware-apps] Status ? RE: Review of R3.2 finished --> Deadline: Wednesday 09.04.2014 In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2A844@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD2A844@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2DDCA@DEWDFEMB14A.global.corp.sap> Hi all, So far I have received info from RSS and SAP that they fixed their issues, can the others please fix the issues and tell me about the fixes? @ GE owners: - Wirecloud? - Mediation? - Store? - Business Calculator? I think that you have not mailed me about having fixed the issues. I need to submit R3.2. back to Miguel this week and plan to do this Tuesday/Wednesday. Please each GE owner please fix the issues mentioned there and write to me a 1 mail explaining the fixes you did. I would like to compile a table of fixes for our GEs. Deadline: tomorrow Tuesday 15.4 Lunch Best Markus [cid:image001.png at 01CF57D5.55CEA3D0] From: Heller, Markus Sent: Dienstag, 8. April 2014 15:46 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Status ? RE: Review of R3.2 finished --> Deadline: Wednesday 09.04.2014 Hi all, For R3.2.: if you are listed in the Google Review doc in status "Rejected" please complete the improvement task and report your current status: Have you finished the requested updates of the manuals etc. according to the review comments? Deadline: I would propose that we submit our R3.2 back to Miguel as final end of this week. Therefore please complete this task until Wednesday EOB please (this week). Best Markus - Marketplace: Update completed (AK) Application Mashup Wirecloud Marketplace Marketplace Mediation Mediation Revenue Sharing RSS Store Store BusinessCalculator BusinessCalculator From: Heller, Markus Sent: Mittwoch, 2. April 2014 12:01 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: FW: Review of R3.2 finished Hi all, I have noticed only during the call today, that I have missed to forward the review report upon reception from internal review software release R3.3 to you. That might explain well why I asked how you about the current status here and you wondered maybe what I was talking about... Sorry that I missed to forward it, here it is: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGZ0ekFhREgyMFdoT1owZ1BYdFlnbGc&usp=docslist_api&pli=1#gid=0 Upon request, please concentrate all possible comments in one single message or whatever, avoid separate messages for the sake of an orderly process. Please ask us if you need help, some UTP are not in a good shape as it seems in the review. Please fix this and the other issues noted. Please act as usual and signal to me when you are ready. Deadline: let us say end of this week Friday (idea is to get this back for finalization to wipe it of our tables..) Best Markus From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Donnerstag, 20. M?rz 2014 18:25 To: Heller, Markus Cc: Leidig, Torsten; Sandfuchs, Thorsten; FERMIN GALAN MARQUEZ; MANUEL ESCRICHE VICENTE Subject: Review of R3.2 finished Dear all, This ready. Please try to get all fixed in one go, we do not have time for more so many reviews, as you can easily perceive. There are some UTPs that are in a poor state. Pls provide guidance to whoever is failing to update them or who do not understand how this works. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGZ0ekFhREgyMFdoT1owZ1BYdFlnbGc&usp=docslist_api&pli=1#gid=0 Note that I reviewed all the UTPs personally and Ferm?n did "Files". The column with the reviewers refers exclusively to whoever took charge of the User & Progs manual + the install & admin manual Please concentrate all possible comments in one single message or whatever, avoid separate messages for the sake of an orderly process. Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 75591 bytes Desc: image001.png URL: From markus.heller at sap.com Mon Apr 14 11:37:14 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 14 Apr 2014 09:37:14 +0000 Subject: [Fiware-apps] Fi-WARE: WP3 - GE installation testing plan In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2D267@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD2D21F@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2D267@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2DDEB@DEWDFEMB14A.global.corp.sap> Dear all, I forgot a poll: Can each tester please until today EOB send me a brief reply that you accept the assignment made in the test plan? In this way, I can better see if the testing partners are ok with their assigned tasks... Best Markus From: Heller, Markus Sent: Freitag, 11. April 2014 16:57 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: FW: Fi-WARE: WP3 - GE installation testing plan Hi all, This is the outcome of the planning which we had to deliver to Stefano today. Thank you to those who have answered today and confirmed their testing of a GE. My rule for assignment: Each GE gets tested and each partner tests at least 1 GE. I had to fill all tester positions, as I was requested to do so according to the procedure. Proposal: As such test exercise is a 30-minute-task or so, please simply accept the assignments for testing - all of us need to test. If changes are needed, you need to find a switching partner by yourself and try to switch the GE testing tasks with him. Then mail me the switch after you have received the other partner's agreement to switch. Please note that I cannot accept that someone does not want to test a GE in order to be fair to all partner - as you may understand. If you think your case is unfair or so, please of course as usual contact me. @ALL: Please start with these tests now individually and do the reports as Stefano demanded in his guidelines (separate mails from him). All partners have to contact the GE owner to organize all aspects of testing individually. The tester and the tested are bot responsible individually to perform the test and report and to comply to Stefano's guidelines fully. I as WPL will only track the progress von time to time. Best wishes Markus From: Heller, Markus Sent: Freitag, 11. April 2014 16:44 To: Stefano de Panfilis (stefano.depanfilis at eng.it) Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Fi-WARE: WP3 - GE installation testing plan Dear Stefano, here I attach our entries for the table from APPS. This is our plan as of today. Sadly I do not have a google docs account, so I cannot enter it there, but I hope you could please copy it to the google docs? As requested, where commitments were not possible, WPL has made tester assignments which are pending confirmation in the next week. - Partners who still need to commit to test a GE: TI, THALES, IMINDS. - Partners who have committed to test a GE: ATOS, UPM, SAP, TID - Partners not active and will not test: DT, EAB Best wishes Markus Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud YES NO SAP - confirmed Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner Registry Registry - SAP RI 3.2 YES NO ATOS - to be confirmed - assigned by WPL Repository Repository - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Revenue Settlement and Sharing System Revenue Settlement and Sharing System 3.3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds Koen - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore 3.3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Apr 14 11:38:15 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 14 Apr 2014 09:38:15 +0000 Subject: [Fiware-apps] Fi-WARE: WP3 - GE installation testing plan References: <393554EDCF801348BC53C7813C6CB73B1AD2D21F@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2D267@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2DE02@DEWDFEMB14A.global.corp.sap> Hi all, SAP accepts his assigned GE test tasks to test Wirecloud and Mediator/Setha2. Best Markus From: Heller, Markus Sent: Montag, 14. April 2014 11:37 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: Fi-WARE: WP3 - GE installation testing plan Dear all, I forgot a poll: Can each tester please until today EOB send me a brief reply that you accept the assignment made in the test plan? In this way, I can better see if the testing partners are ok with their assigned tasks... Best Markus From: Heller, Markus Sent: Freitag, 11. April 2014 16:57 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: FW: Fi-WARE: WP3 - GE installation testing plan Hi all, This is the outcome of the planning which we had to deliver to Stefano today. Thank you to those who have answered today and confirmed their testing of a GE. My rule for assignment: Each GE gets tested and each partner tests at least 1 GE. I had to fill all tester positions, as I was requested to do so according to the procedure. Proposal: As such test exercise is a 30-minute-task or so, please simply accept the assignments for testing - all of us need to test. If changes are needed, you need to find a switching partner by yourself and try to switch the GE testing tasks with him. Then mail me the switch after you have received the other partner's agreement to switch. Please note that I cannot accept that someone does not want to test a GE in order to be fair to all partner - as you may understand. If you think your case is unfair or so, please of course as usual contact me. @ALL: Please start with these tests now individually and do the reports as Stefano demanded in his guidelines (separate mails from him). All partners have to contact the GE owner to organize all aspects of testing individually. The tester and the tested are bot responsible individually to perform the test and report and to comply to Stefano's guidelines fully. I as WPL will only track the progress von time to time. Best wishes Markus From: Heller, Markus Sent: Freitag, 11. April 2014 16:44 To: Stefano de Panfilis (stefano.depanfilis at eng.it) Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Fi-WARE: WP3 - GE installation testing plan Dear Stefano, here I attach our entries for the table from APPS. This is our plan as of today. Sadly I do not have a google docs account, so I cannot enter it there, but I hope you could please copy it to the google docs? As requested, where commitments were not possible, WPL has made tester assignments which are pending confirmation in the next week. - Partners who still need to commit to test a GE: TI, THALES, IMINDS. - Partners who have committed to test a GE: ATOS, UPM, SAP, TID - Partners not active and will not test: DT, EAB Best wishes Markus Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud YES NO SAP - confirmed Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner Registry Registry - SAP RI 3.2 YES NO ATOS - to be confirmed - assigned by WPL Repository Repository - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Revenue Settlement and Sharing System Revenue Settlement and Sharing System 3.3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds Koen - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore 3.3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Apr 14 11:47:18 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 14 Apr 2014 09:47:18 +0000 Subject: [Fiware-apps] FW: Review of the Apps Chapter in the FI-WARE architecture In-Reply-To: <703F4EB81B2AD0428360BFE55A82DFBC5FCFB269@DEWDFEMB11C.global.corp.sap> References: <534245C8.2040509@tid.es> <703F4EB81B2AD0428360BFE55A82DFBC5FCFB269@DEWDFEMB11C.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2DE43@DEWDFEMB14A.global.corp.sap> Hi all, the deadline for this is coming week Tuesday 22.4. for your activities (Torsten is on vacation during this week). If you are having holidays, please make sure that you fix your part of Arch according to Juanjos Review immediately now and report to me instead of Torsten that you have completed before leaving into your deserved vacation this week. Best Markus From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of Leidig, Torsten Sent: Freitag, 11. April 2014 11:48 To: fiware-apps at lists.fi-ware.eu Subject: [Fiware-apps] FW: Review of the Apps Chapter in the FI-WARE architecture Dear WP3 Partners, we received the final review for the FI-WARE Apps Chapter Architecture deliverable. You will find the document on the Forge (see mail below). I've gone through the document, checked all minor changes and accepted most of them. A file of this document version is attached to the mail. There are still all comments in the document. So you should carefully look at these comments and do your best to improve your sections!!! Esp. the Business Modeller and Business Calculator are emphasized in Juanjo's mail (see below). There will be no further review. This means you are now asked to incorporate all changes of this last version (and your additional changes of course) into the FI-WARE P r i v a t e Wiki. The final deliverable will be created from these pages in the Wiki soon! So please start to update your pages in the private Wiki in order to reflect the latest reviewed document. Please give me an indication if you are done with it. Best regards, Torsten Dr Torsten Leidig Development Architect - Human Computer Interaction SAP AG | Vincenz-Priessnitz-Strasse 1 | 76131 Karlsruhe | Germany T +49 6227-7-52535 | M +49 171 978 1292 mailto:torsten.leidig at sap.com Pflichtangaben/Mandatory Disclosure Statements: http://www.sap.com/company/legal/impressum.epx Diese E-Mail kann Betriebs- oder Gesch?ftsgeheimnisse oder sonstige vertrauliche Informationen enthalten. Sollten Sie diese E-Mail irrt?mlich erhalten haben, ist Ihnen eine Kenntnisnahme des Inhalts, eine Vervielf?ltigung oder Weitergabe der E-Mail ausdr?cklich untersagt. Bitte benachrichtigen Sie uns und vernichten Sie die empfangene E-Mail. Vielen Dank. This e-mail may contain trade secrets or privileged, undisclosed, or otherwise confidential information. If you have received this e-mail in error, you are hereby notified that any review, copying, or distribution of it is strictly prohibited. Please inform us immediately and destroy the original transmittal. Thank you for your cooperation. ________________________________ From: Juanjo Hierro [jhierro at tid.es] Sent: Monday, April 07, 2014 8:29 AM To: Heller, Markus; Sandfuchs, Thorsten; Leidig, Torsten Cc: Miguel Carrillo; jhierro >> "Juan J. Hierro" Subject: Review of the Apps Chapter in the FI-WARE architecture Dear Markus, Torsten, Thorsten, You can download a revised version of the architecture of the Apps Chapter from the following link: https://forge.fi-ware.org/docman/view.php/27/3749/D.2.3.3%2BFI-WARE%2BArchitecture%2BWP3%2Bcontributions%2Bconsolidated+revised+jhierro.docx Proposed changes are marked through the change tracking system of MS Word. My comments will be visualized under comments of "editor". Many of the changes are editorial and targeted to improve readability. However, I would like to highlight the comments made on the Business Modeller and Calculator GEs. Particularly, the Bussiness Calculator makes reference to concepts (i.e., equipments) that a reader can hardly link to concepts supported by another GEs that are part of the Business Framework. I wonder whether that part had been carefully reviewed ... Please proceed with the acceptance (or eventually rejection under justification) of changes and translate the contents to the public wiki. As with regard to Open Specifications, please proceed to publish them on the public wiki and generate the deliverable to be submitted without waiting for my revision. However, I encourage you to carefully review the open specifications related to the Business Modeller and Business Calculator to make sure that these specifications are complete and the underlying model is well aligned or at least clearly compatible with the model bound to other GEs, particularly the Store and RSS GEs. If such alignment/compatibility is not achieved, there might be a risk that comments are received by the reviewers and that the particular contributions to the specs regarding these GEs is not accepted. Best regards, -- Juanjo ------------- Product Development and Innovation (PDI) - Telefonica Digital website: www.tid.es email: jhierro at tid.es twitter: twitter.com/JuanjoHierro FI-WARE (European Future Internet Core Platform) Coordinator and Chief Architect FI-PPP Architecture Board chairman You can follow FI-WARE at: website: http://www.fi-ware.eu facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 twitter: http://twitter.com/FIware linkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Apr 14 13:45:24 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 14 Apr 2014 11:45:24 +0000 Subject: [Fiware-apps] FW: D2.6.2 - SoTA - Integrated versiton, please, check it In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90BB31BCC81@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90BB31BCC81@EX10-MB2-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2E04B@DEWDFEMB14A.global.corp.sap> Hi all, I have signaled Manuel my OK just a minute ago after checking. Nevertheless, as usual I pass it on to you. Can you please also have a look if our/your content is integrated and signal if something is wrong. Best Markus From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Freitag, 11. April 2014 12:17 To: fiware-wpl at lists.fi-ware.org; fiware-wpa at lists.fi-ware.org Subject: [Fiware-wpl] D2.6.2 - SoTA - Integrated versiton, please, check it Dear WP Leaders/Architects, Please, find attached the SoTA integrated. Please, take a minute to check your content is properly integrated. We want to deliver it ASAP. Thanks for cooperation!! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 3316478 bytes Desc: not available URL: From stefano.depanfilis at eng.it Mon Apr 14 14:06:25 2014 From: stefano.depanfilis at eng.it (stefano de panfilis) Date: Mon, 14 Apr 2014 14:06:25 +0200 Subject: [Fiware-apps] Fi-WARE: WP3 - GE installation testing plan In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2D21F@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD2D21F@DEWDFEMB14A.global.corp.sap> Message-ID: dear markus, while enetering the data you provided in the table i noticed all the geis will not tested in fi-lab. any specific reason for that? i know several of them have the recipe to perform the test. ciao, stefano 2014-04-11 16:44 GMT+02:00 Heller, Markus : > Dear Stefano, > > > > here I attach our entries for the table from APPS. This is our plan as of > today. > > > > Sadly I do not have a google docs account, so I cannot enter it there, but > I hope you could please copy it to the google docs? > > > > As requested, where commitments were not possible, WPL has made tester > assignments which are pending confirmation in the next week. > > - Partners who *still need to commit* to test a GE: TI, THALES, > IMINDS. > > - Partners who *have committed* to test a GE: ATOS, UPM, SAP, TID > > - Partners *not active* and will not test: DT, EAB > > > > Best wishes > > Markus > > > > > > > > *Chapter* > > *GE* > > *GEi* > > *Release to test* > > *Testing applies?* > > *Testing on FI-Lab?* > > *Assigned tester* > > Apps - WP3 > > Application Mashup > > Wirecloud > > YES > > NO > > *SAP* - confirmed > > Light Semantic Composition Editor > > COMPEL > > YES > > NO > > *iMinds* (Camille) ? to be confirmed ? assigned by WPL > > Marketplace > > Marketplace - SAP RI > > 3.2.1 > > YES > > NO > > *UPM* ? to be confirmed ? assigned by WPL ? UPM did it before so report > could be written about this > > Mediator > > Mediator > > *SAP* ?confirmed ? release and conditions to be defined by GE owner > > Mediator > > SETHA2 > > *SAP* ? confirmed ? release and conditions to be defined by GE owner > > Registry > > Registry - SAP RI > > 3.2 > > YES > > NO > > *ATOS* ? to be confirmed ? assigned by WPL > > Repository > > Repository - SAP RI > > 3.2.1 > > YES > > NO > > *UPM* ? to be confirmed ? assigned by WPL ? UPM did it before so report > could be written about this > > Revenue Settlement and Sharing System > > Revenue Settlement and Sharing System > > 3.3.3 > > YES > > NO > > *UPM* ? confirmed (later - for 30.June) > > Service Composition > > Ericsson Composition Engine (ECE) > > > > > > > > TBD > > Service Mashup > > Mashup Factory > > *iMinds* Koen ? to be confirmed ? assigned by WPL ? release and > conditions to be defined by GE owner > > Store > > WStore > > 3.3.3 > > YES > > NO > > *TID* ? confirmed > > Business Calculator > > Business Calculator > > *THALES* ? to be confirmed ? assigned by WPL ? release and conditions to > be defined by GE owner > > Business Modeler > > Business Modeler > > *TI* ? to be confirmed ? assigned by WPL ? release and conditions to be > defined by GE owner > > > -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Apr 14 16:18:41 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 14 Apr 2014 14:18:41 +0000 Subject: [Fiware-apps] Fi-WARE: WP3 - GE installation testing plan In-Reply-To: References: <393554EDCF801348BC53C7813C6CB73B1AD2D21F@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2E1CE@DEWDFEMB14A.global.corp.sap> Hi Stefano, I try to explain how I see it: As input, you wrote in your first mail on this: please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) and separately your fill-in help that I forwarded indirectly to the APPS team as well: - ?Testing applies??: Example= ?? (no clue? a Name, a YES/NO, a report of the testing??) "YES" if the gei is oss, so intsllation and deployment test can be made, otherwise "NO". this field should be filled by the wpl - ?testing on FI-LAB?: Example= ?? (no clue? a Name, a YES/NO, a report of the testing??) "YES" if the gei, either oss or not, is equipped with recipes for installation in fi-lab, otherwise "NO". this field should be filled by the wpl My assumption why no ?testing-on-FILAB? was answered with ?yes? is: ? What I can guess is that your stated view that you want to separate between ?1. manual deployment? and ?2. Recipes supported deployment? does not meet directly ? as I only know recognize ? with the perspective what is e.g. in Henar?s prozess and what we did so far: we always did and do understand naturally, that we can have ?manual configuration ? but this happening with ?creating a VM, then do the manual steps manually and try to succeed in FI-Lab?. Example: We SAP GEs in WP3 are fully in FI-Lab but only with ?manual configuration? without recipes which is of course possible. A tester for the test now would be given nothing but the GE catalog link and the link to manuals and then he is alone?he tries to complete installation on fi-lab without help? ? So most of the partners may have chosen this possibility also (combination YES/NO in your two attributes) as they were accustomed much to it and they opted to have the ?manual configuration? trial with a tester to see if he can install the GE within FI-Lab (e.g. by creating a VM ,?..manually perform installation steps,?.). I do not know why they do not want to test with recipes, but we thought we had free choice so I just collected the decisions from the GE owners in Apps about this. ? So your two columns would then by accident ask differently than what we typically did and thought?because in our perspective we can have configuration tests to happen on filab manually following the manuals. So far with my 5 cents how this might occur. Was I able to explain it to you? --> Nevertheless, shall we make a poll in the APPS team and ask the ones who have recipes to have the tests carried out with recipes? Not all have recipes, but some do? Best Markus From: stefano de panfilis [mailto:stefano.depanfilis at eng.it] Sent: Montag, 14. April 2014 14:06 To: Heller, Markus Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: Fi-WARE: WP3 - GE installation testing plan dear markus, while enetering the data you provided in the table i noticed all the geis will not tested in fi-lab. any specific reason for that? i know several of them have the recipe to perform the test. ciao, stefano 2014-04-11 16:44 GMT+02:00 Heller, Markus >: Dear Stefano, here I attach our entries for the table from APPS. This is our plan as of today. Sadly I do not have a google docs account, so I cannot enter it there, but I hope you could please copy it to the google docs? As requested, where commitments were not possible, WPL has made tester assignments which are pending confirmation in the next week. - Partners who still need to commit to test a GE: TI, THALES, IMINDS. - Partners who have committed to test a GE: ATOS, UPM, SAP, TID - Partners not active and will not test: DT, EAB Best wishes Markus Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud YES NO SAP - confirmed Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) ? to be confirmed ? assigned by WPL Marketplace Marketplace - SAP RI 3.2.1 YES NO UPM ? to be confirmed ? assigned by WPL ? UPM did it before so report could be written about this Mediator Mediator SAP ?confirmed ? release and conditions to be defined by GE owner Mediator SETHA2 SAP ? confirmed ? release and conditions to be defined by GE owner Registry Registry - SAP RI 3.2 YES NO ATOS ? to be confirmed ? assigned by WPL Repository Repository - SAP RI 3.2.1 YES NO UPM ? to be confirmed ? assigned by WPL ? UPM did it before so report could be written about this Revenue Settlement and Sharing System Revenue Settlement and Sharing System 3.3.3 YES NO UPM ? confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds Koen ? to be confirmed ? assigned by WPL ? release and conditions to be defined by GE owner Store WStore 3.3.3 YES NO TID ? confirmed Business Calculator Business Calculator THALES ? to be confirmed ? assigned by WPL ? release and conditions to be defined by GE owner Business Modeler Business Modeler TI ? to be confirmed ? assigned by WPL ? release and conditions to be defined by GE owner -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Apr 14 17:54:29 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 14 Apr 2014 15:54:29 +0000 Subject: [Fiware-apps] FYI Catalog and Use Case cockpit are reviewed after M36 by Arian (assumption) Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2E2DE@DEWDFEMB14A.global.corp.sap> Dear all, Today in WPL/WPA minutes, a colleague reported that he had a brief conversation with Arian where he indicated that he might check the FI-WARE Catalog and the Use Case cockpit (Google docs) for each GE very well. This could happen immediately after M36, I am not aware of a reason for this timeline, but nevertheless would like to pass this info to you. I want to make you aware of this "info"/"intention statement" issued by Arian and you might think about updating both Catalog and UC matrix well enough so that Arian is not disappointed. Sometimes the UC Matrix might not have gotten the attention it deserves now, so to say...you might act on this for your GEs and improve it... TID might send a mail on this matter also to us all in FI-WARE / GE owners, but I want to drop you this line before I forget to mention it tomorrow. Best Markus -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 5746 bytes Desc: not available URL: From markus.heller at sap.com Tue Apr 15 12:33:19 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 15 Apr 2014 10:33:19 +0000 Subject: [Fiware-apps] Fi-WARE: WP3 - GE installation testing plan In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD2DDEB@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD2D21F@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2D267@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2DDEB@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2E6BF@DEWDFEMB14A.global.corp.sap> Dear all, Please note that now you are bound to the assignments for installation testing of GEs (I have received no rejections until deadline). I expect that each WP3 partner tests the GE assigned to him, please do so as you might bring yourself and the GE owner in trouble if you do not. Please reach out to the GE to be tested and report about your test. Note the deadlines given by Stefano for this. Best Markus From: Heller, Markus Sent: Montag, 14. April 2014 11:37 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: Fi-WARE: WP3 - GE installation testing plan Dear all, I forgot a poll: Can each tester please until today EOB send me a brief reply that you accept the assignment made in the test plan? In this way, I can better see if the testing partners are ok with their assigned tasks... Best Markus From: Heller, Markus Sent: Freitag, 11. April 2014 16:57 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: FW: Fi-WARE: WP3 - GE installation testing plan Hi all, This is the outcome of the planning which we had to deliver to Stefano today. Thank you to those who have answered today and confirmed their testing of a GE. My rule for assignment: Each GE gets tested and each partner tests at least 1 GE. I had to fill all tester positions, as I was requested to do so according to the procedure. Proposal: As such test exercise is a 30-minute-task or so, please simply accept the assignments for testing - all of us need to test. If changes are needed, you need to find a switching partner by yourself and try to switch the GE testing tasks with him. Then mail me the switch after you have received the other partner's agreement to switch. Please note that I cannot accept that someone does not want to test a GE in order to be fair to all partner - as you may understand. If you think your case is unfair or so, please of course as usual contact me. @ALL: Please start with these tests now individually and do the reports as Stefano demanded in his guidelines (separate mails from him). All partners have to contact the GE owner to organize all aspects of testing individually. The tester and the tested are bot responsible individually to perform the test and report and to comply to Stefano's guidelines fully. I as WPL will only track the progress von time to time. Best wishes Markus From: Heller, Markus Sent: Freitag, 11. April 2014 16:44 To: Stefano de Panfilis (stefano.depanfilis at eng.it) Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Fi-WARE: WP3 - GE installation testing plan Dear Stefano, here I attach our entries for the table from APPS. This is our plan as of today. Sadly I do not have a google docs account, so I cannot enter it there, but I hope you could please copy it to the google docs? As requested, where commitments were not possible, WPL has made tester assignments which are pending confirmation in the next week. - Partners who still need to commit to test a GE: TI, THALES, IMINDS. - Partners who have committed to test a GE: ATOS, UPM, SAP, TID - Partners not active and will not test: DT, EAB Best wishes Markus Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud YES NO SAP - confirmed Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner Registry Registry - SAP RI 3.2 YES NO ATOS - to be confirmed - assigned by WPL Repository Repository - SAP RI 3.2.1 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this Revenue Settlement and Sharing System Revenue Settlement and Sharing System 3.3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds Koen - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore 3.3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Tue Apr 15 15:53:00 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 15 Apr 2014 13:53:00 +0000 Subject: [Fiware-apps] FW: [Fiware-wpl] [Fiware-wpa] URGENT: GEis installation and test In-Reply-To: <5347A54E.2030806@tid.es> References: <5347A54E.2030806@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2E9A4@DEWDFEMB14A.global.corp.sap> FYI was old mail from stefano/Juanjo to us all, only for reference From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of Juanjo Hierro Sent: Freitag, 11. April 2014 10:18 To: fiware-wpa at lists.fi-ware.org; fiware-wpl at lists.fi-ware.eu Subject: Re: [Fiware-wpl] [Fiware-wpa] URGENT: GEis installation and test Hi, I remind you this important matter. Please handle accordingly. Cheers, -- Juanjo ------------- Product Development and Innovation (PDI) - Telefonica Digital website: www.tid.es email: jhierro at tid.es twitter: twitter.com/JuanjoHierro FI-WARE (European Future Internet Core Platform) Coordinator and Chief Architect FI-PPP Architecture Board chairman You can follow FI-WARE at: website: http://www.fi-ware.eu facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 twitter: http://twitter.com/FIware linkedIn: http://www.linkedin.com/groups/FIWARE-4239932 On 08/04/14 20:32, stefano de panfilis wrote: dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 _______________________________________________ Fiware-wpa mailing list Fiware-wpa at lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-wpa ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 14769 bytes Desc: not available URL: From markus.heller at sap.com Tue Apr 15 16:05:36 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 15 Apr 2014 14:05:36 +0000 Subject: [Fiware-apps] FW: [Fiware-wpl] URGENT: GEis installation and test In-Reply-To: References: Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD2E9C7@DEWDFEMB14A.global.corp.sap> Hi, After having fixed the partner testing agreements in our chapter, now the next step: 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. There is this restriction mentioned here by Stefano that M36-leaving partners are enforced to test now or have their GEs tested now. Nevertheless, as with other activities I recommend that ALL WP3 partners stick to the first until the deadline 25.4. complete the tests. Only partners going to extension period could choose to do it later (no one has until now asked for it), but I recommend to get it done now - only short task and we can stay together to complete it until end of April. For the GE tests, please follow instructions from Stefano below until 25.4 (we received it earlier, no changes): 1. Contact the GE owner of the GE you have to test and align with him how to test it. 2. Perform the test and fill out for each test an instance of the attached WORD document from Stefano and send it to...mmmh not mentioned what to do with it.....for example, send them to me for now... 3. Document your activity completion in the given GOOGLE DOC document or send directly to Stefano (I do not have a google doc account and cannot do it for you) Best Markus From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 238880 bytes Desc: not available URL: From ralli at tid.es Mon Apr 21 11:55:10 2014 From: ralli at tid.es (CARLOS RALLI UCENDO) Date: Mon, 21 Apr 2014 09:55:10 +0000 Subject: [Fiware-apps] LAST CALL - Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB In-Reply-To: Message-ID: Dear Colleagues, So far I can only see the contributions from: iMinds, NEC, IBM-CH, ALU-D, Playsign, SAP(WP3), NSN-H, DT (sent to Carlos by e-mail) ATOS and Ogilvy have committed to send it tomorrow EoB. Please, let me extend the deadline until this wednesday at 12CET. However there will be no further extensions and all contribs not received will not be included in the document to be delivered this friday. As said before, the European Commission may reject the costs of dissemination trips within M30 and M36 not included in this document. Obviously, for partners leaving the project on M36 is extremely important if you want to get all funds related to dissemination of FI-WARE. The googledoc to contribute is still active here: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_73M/edit#heading=h.kgxusv5ldjp Thanks for your understanding and contributions, Best regards. -- ------------------------------------------------------------------------------------------------------------------------ Carlos Ralli Ucendo (ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ------------------------------------------------------------------------------------------------------------------------ Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ------------------------------------------------------------------------------------------------------------------------ De: Carlos Ralli Ucendo > Fecha: mi?rcoles, 9 de abril de 2014 15:20 Para: "fiware at lists.fi-ware.org" > CC: "fiware-cloud at lists.fi-ware.org" >, "fiware-iot at lists.fi-ware.org" >, "Fiware-data at lists.fi-ware.org" >, "FI-WARE, MiWi" >, "fiware-i2nd at lists.fi-ware.org" >, "fiware-apps at lists.fi-ware.eorg" >, "fiware-security at lists.fi-ware.org" > Asunto: Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB Dear colleagues, It is time to collect all information regarding dissemination, communication & collaboration actions you performed in the last WP12 reporting period (M30 = Oct 2013 to M36 = Apr 2014, all included). Please, bear in mind that the EC may reject one of your trips for these activities if they are not correctly reported in this new edition of D12.2 and D12.3 documents. This time, to make things easier for all of you I have prepared a Googledoc where you can place your contribs and then I may transfer them myself to the wiki: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_73M/edit#heading=h.o4j1rtrg6tzx However, you may always contribute to the wiki directly as in previous times. The contribs have to be added here: http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Dissemination_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Communication_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Collaboration_activities Even when you add your contribs straight into the wiki, do not forget to add your partner name to the googledoc and add "(Wiki)" so I keep informed. As said in the googledoc the 6 possible sections you may contribute with entries (the googledoc includes examples) are: 1. Participation in Events (Presentations, round tables, keynotes...) 2. Scientific Papers and Panels 3. Book chapters 4. Training materials & Tutorials 5. Collaboration Meetings/Actions 6. Press Releases and other relevant Communication actions Normally, most partners will have contribs to 1 and 2 sections. Deadline for this is next monday April 14th EoB. Should you have any question/comment, please do contact me. Thanks in advance for your kind cooperation. Best regards, -- ------------------------------------------------------------------------------------------------------------------------ Carlos Ralli Ucendo (ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ------------------------------------------------------------------------------------------------------------------------ Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ------------------------------------------------------------------------------------------------------------------------ ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From suraci at dis.uniroma1.it Mon Apr 21 19:41:06 2014 From: suraci at dis.uniroma1.it (Vincenzo Suraci) Date: Mon, 21 Apr 2014 19:41:06 +0200 Subject: [Fiware-apps] R: [Fiware-i2nd] LAST CALL - Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB In-Reply-To: References: Message-ID: <005401cf5d88$e07d09a0$a1771ce0$@dis.uniroma1.it> Dear Carlos, find attached the UNIROMA1 contribution to WP12 periodic report. Best Regards, Vincenzo Suraci _____________________________________ Dr. Vincenzo Suraci "Sapienza" - Universit? di Roma Dipartimento di Ingegneria Informatica, Automatica e Gestionale (DIAG) Via Ariosto, 25 - 00185 Rome - Italy Phone +39 06 77274 037 Fax +39 06 77274 033 Mobile +39 340 156 2258 Mail suraci at dis.uniroma1.it Web Site http://www.dis.uniroma1.it/~suraci Da: fiware-i2nd-bounces at lists.fi-ware.org [mailto:fiware-i2nd-bounces at lists.fi-ware.org] Per conto di CARLOS RALLI UCENDO Inviato: luned? 21 aprile 2014 11:55 A: fiware at lists.fi-ware.org; fiware-cloud at lists.fi-ware.org; fiware-iot at lists.fi-ware.org; Fiware-data at lists.fi-ware.org; FI-WARE, MiWi; fiware-i2nd at lists.fi-ware.org; fiware-apps at lists.fi-ware.eorg; fiware-security at lists.fi-ware.org Oggetto: [Fiware-i2nd] LAST CALL - Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB Dear Colleagues, So far I can only see the contributions from: iMinds, NEC, IBM-CH, ALU-D, Playsign, SAP(WP3), NSN-H, DT (sent to Carlos by e-mail) ATOS and Ogilvy have committed to send it tomorrow EoB. Please, let me extend the deadline until this wednesday at 12CET. However there will be no further extensions and all contribs not received will not be included in the document to be delivered this friday. As said before, the European Commission may reject the costs of dissemination trips within M30 and M36 not included in this document. Obviously, for partners leaving the project on M36 is extremely important if you want to get all funds related to dissemination of FI-WARE. The googledoc to contribute is still active here: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_ 73M/edit#heading=h.kgxusv5ldjp Thanks for your understanding and contributions, Best regards. -- ---------------------------------------------------------------------------- -------------------------------------------- Carlos Ralli Ucendo ( ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ---------------------------------------------------------------------------- -------------------------------------------- Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------------- -------------------------------------------- De: Carlos Ralli Ucendo < ralli at tid.es> Fecha: mi?rcoles, 9 de abril de 2014 15:20 Para: " fiware at lists.fi-ware.org" < fiware at lists.fi-ware.org> CC: " fiware-cloud at lists.fi-ware.org" < fiware-cloud at lists.fi-ware.org>, " fiware-iot at lists.fi-ware.org" < fiware-iot at lists.fi-ware.org>, " Fiware-data at lists.fi-ware.org" < Fiware-data at lists.fi-ware.org>, "FI-WARE, MiWi" < fiware-miwi at lists.fi-ware.org>, " fiware-i2nd at lists.fi-ware.org" < fiware-i2nd at lists.fi-ware.org>, " fiware-apps at lists.fi-ware.eorg" < fiware-apps at lists.fi-ware.org>, " fiware-security at lists.fi-ware.org" < fiware-security at lists.fi-ware.org> Asunto: Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB Dear colleagues, It is time to collect all information regarding dissemination, communication & collaboration actions you performed in the last WP12 reporting period (M30 = Oct 2013 to M36 = Apr 2014, all included). Please, bear in mind that the EC may reject one of your trips for these activities if they are not correctly reported in this new edition of D12.2 and D12.3 documents. This time, to make things easier for all of you I have prepared a Googledoc where you can place your contribs and then I may transfer them myself to the wiki: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_ 73M/edit#heading=h.o4j1rtrg6tzx However, you may always contribute to the wiki directly as in previous times. The contribs have to be added here: http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Disseminati on_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Communicati on_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Collaborati on_activities Even when you add your contribs straight into the wiki, do not forget to add your partner name to the googledoc and add "(Wiki)" so I keep informed. As said in the googledoc the 6 possible sections you may contribute with entries (the googledoc includes examples) are: 1. Participation in Events (Presentations, round tables, keynotes...) 2. Scientific Papers and Panels 3. Book chapters 4. Training materials & Tutorials 5. Collaboration Meetings/Actions 6. Press Releases and other relevant Communication actions Normally, most partners will have contribs to 1 and 2 sections. Deadline for this is next monday April 14th EoB. Should you have any question/comment, please do contact me. Thanks in advance for your kind cooperation. Best regards, -- ---------------------------------------------------------------------------- -------------------------------------------- Carlos Ralli Ucendo ( ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ---------------------------------------------------------------------------- -------------------------------------------- Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------------- -------------------------------------------- _____ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx --- Questa e-mail ? priva di virus e malware perch? ? attiva la protezione avast! Antivirus. http://www.avast.com -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.jpg Type: image/jpeg Size: 1646 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.6 - WP12 - M31-M36 - UNIROMA1_2014_04_10.doc Type: application/msword Size: 47104 bytes Desc: not available URL: From markus.heller at sap.com Tue Apr 22 09:58:14 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 22 Apr 2014 07:58:14 +0000 Subject: [Fiware-apps] FW: WP3 reviewed (just those leaving on M36) In-Reply-To: <53551776.1080509@tid.es> References: <53551776.1080509@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD3115C@DEWDFEMB14A.global.corp.sap> Hi WP3, Please see the review - only for the fast - track M36 leaving companies - in WP3 for release 3.3 from Miguel. These M36 companies are marked in Grey color. Reviews for the other partners are not here, if I see it correctly. Please act on this review using the URL below asap and improve your contributions to R3.3 until deadline end Thursday EOB, so that we can resend on Friday. Best Markus --- Mail from Miguel: We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue ... -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 10533 bytes Desc: not available URL: From markus.heller at sap.com Tue Apr 22 12:50:21 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 22 Apr 2014 10:50:21 +0000 Subject: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test In-Reply-To: <5347EAF4.7090904@intec.ugent.be> References: <393554EDCF801348BC53C7813C6CB73B1AD2CDAC@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD2CDDF@DEWDFEMB14A.global.corp.sap> <5347E81F.50301@intec.ugent.be> <393554EDCF801348BC53C7813C6CB73B1AD2D078@DEWDFEMB14A.global.corp.sap> <5347EAF4.7090904@intec.ugent.be> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD31341@DEWDFEMB14A.global.corp.sap> Hi Koen, Yes, the testers since were to be chosen, but please recall, that now after the deadlines have passed) the testing plan is fix, please see: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0 --> You iminds will be tested by TI and THALES according to this table. Please contact them asap, according to the mails from Stefano (primary) (and me with forwards of his mail) on this where I wrote what else to do. I recommend to just let them test asap, afterall it's not important who tests (should be a stranger to your GES anyhow) but the deadline now is near this week. The basic idea of this whole testing exercise is simple: This replaces the Lutz-Schubert-test so that FI-WARE people test their own FI-WARE stuff among ourselves. My private note, it will be evaluated per GE by Arian/EC (assumption) --> A tester gets the info where yto find your GE (e.g. you point him to catalog), and gets only the installation manuals etc that you have written. He tries to follow them and you ask him that tester fills out report on his trial. Stefano and WP10 have decided on this template and on these single points, and the tester needs simply to enter the data and return to you. You retrun then to (was not swritten), I recommend, per mail to Stefano (primary) and me CC. You decide on your own which version to test (this GE version data is part of the testing plan) and communicate to your testers. You previously had to submit this to me so that it was then to be put into the testing plan online. Please send your missing data directly to Stefano now (as I do not have a google doc account....) and me in CC. > Deadlines for tests to be completed: Please see only Stefano's mail below at the start of his mail thread with the testing instructions and the deadline set by him (green below in Stefanos Mail): "within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014." Best Markus From: koen casier [mailto:koen.casier at intec.ugent.be] Sent: Freitag, 11. April 2014 15:16 To: Heller, Markus Cc: fiware-apps at lists.fi-ware.org Subject: Re: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Hi Markus, When will this testing take place and what will be tested in there? Will the GE be installed according to the installation manual? Will all tests be run on this installed GE or only the last R3 test cases? best regards, Koen On 4/11/2014 3:07 PM, Heller, Markus wrote: Hi Koen, Yes, you can decide in the first place (is best). If you have no candidates, I am asked to assign someone according to process (worse IMHO).... So yes, please name a partner - inside or outside WP3, everyone can do it basically. Some partners can test more than 1 and some partners may not test at all (if everything is fine with the balance or so), but each GE should be tested (or justified why not, see below Stefanos requirements). Best Markus From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of koen casier Sent: Freitag, 11. April 2014 15:03 To: fiware-apps at lists.fi-ware.org Subject: Re: [Fiware-apps] Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Dear Markus, For the business modeler and business calculator, the latest 3.3.3. version is available for testing, and all manuals have been updated on the private wiki as well and they can be found linked under the R3 deliverable listing. I have named all tests with a number indicating the release they were available and useable so testers can quickly proceed to the right tests. Do I understand correctly that we should ourselves decide who should test our stuff? Or should we indicate what we want to have tested and/or what we want to test? For this last case, a random assignment of a test will be OK for me. best regards, Koen On 4/11/2014 11:59 AM, Heller, Markus wrote: Hi, ...and please fill our your entry row for your GEs, that's why I have copied the table. Do not edit it on Google Docs (I do not know if you have write access anyway....). I nevertheless cannot edit the google docs myself since I have no google account, so I will send a compiled E-Mail later to Stefano. Instead, please do me the favor to just write back your table entries to me in an email until 15:00 today, I put it together. How to fill in your table row --> I add help how to fill out the entries, from Stefano: - "Release to test:" Example= ?? (a YES/NO, a date when released so that a tester can start?, ...) the exact version number of the gei under test. this should be the latest completely available at the moment of test, e.g. 3.x.x. this field should be filled by the tester, but agreed with the wpl - "Testing applies?": Example= ?? (no clue... a Name, a YES/NO, a report of the testing...?) "YES" if the gei is oss, so intsllation and deployment test can be made, otherwise "NO". this field should be filled by the wpl - "testing on FI-LAB": Example= ?? (no clue... a Name, a YES/NO, a report of the testing...?) "YES" if the gei, either oss or not, is equipped with recipes for installation in fi-lab, otherwise "NO". this field should be filled by the wpl - "Assigned tester:" Example= TID, ENG or Markus Heller (SAP) - person or company? certainly the name of the company. if you also have already the name of the person responsible for the test, greater! From: Heller, Markus Sent: Freitag, 11. April 2014 11:53 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Please act today Friday until 15:00 --> RE: [Fiware-wpa] URGENT: GEis installation and test Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester Apps - WP3 Application Mashup Wirecloud Light Semantic Composition Editor COMPEL Marketplace Marketplace - SAP RI Mediator Mediator Mediator SETHA2 Registry Registry - SAP RI Repository Repository - SAP RI Revenue Settlement and Sharing System Revenue Settlement and Sharing System Service Composition Ericsson Composition Engine (ECE) Service Mashup Mashup Factory Store WStore Business Calculator Business Calculator Business Modeler Business Modeler Hi WP3, We have to carry out the installation and usage tests according to the mail from Stefano below. I as WPL are asked to manage this process. For a first round, please mail me until deadline Friday today 15:00 which 1 (or 2) partners you propose to test your GE (1-2 tests, minimum 1 test) - as I have a task until today EOB to send them to Stefano. Regardless of being Open Source or not, you are asked to have your GE testes as described below, so nomination of test partner is no problem and we can sort out details later also. Fallback: If you cannot mail, I will assign WP3 partners for you in a fair manner. We can then reassign later next week until Wednesday where needed. If you are in Easter Holidays next week, please act today asap and mail to me who tests your stuff (approved by him or not) Best Markus --- From: fiware-wpa-bounces at lists.fi-ware.org [mailto:fiware-wpa-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 _______________________________________________ Fiware-apps mailing list Fiware-apps at lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-apps -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 61026 bytes Desc: not available URL: From markus.heller at sap.com Tue Apr 22 14:54:15 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 22 Apr 2014 12:54:15 +0000 Subject: [Fiware-apps] FW: [Fiware-ge-owners] Backlog content - update of dashboards and reviews In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90BDAE290CB@EX10-MB1-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90BDAE290CB@EX10-MB1-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD313D2@DEWDFEMB14A.global.corp.sap> From: fiware-ge-owners-bounces at lists.fi-ware.org [mailto:fiware-ge-owners-bounces at lists.fi-ware.org] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Montag, 21. April 2014 09:09 To: fiware-ge-owners at lists.fi-ware.org Cc: fiware-wpl at lists.fi-ware.org; fiware-wpa at lists.fi-ware.org Subject: [Fiware-ge-owners] Backlog content - update of dashboards and reviews Dear Partners, Find updated backlog's dashboards and reviews: DASHBOARDS: https://forge.fi-ware.org/docman/view.php/27/3797/FIWARE.backlog.apps.dashboard.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3798/FIWARE.backlog.cloud.dashboard.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3801/FIWARE.backlog.iot.dashboard.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3799/FIWARE.backlog.data.dashboard.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3800/FIWARE.backlog.i2nd.dashboard.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3803/FIWARE.backlog.security.dashboard.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3802/FIWARE.backlog.miwi.dashboard.20140421.xlsx REVIEWS: https://forge.fi-ware.org/docman/view.php/27/3804/FIWARE.backlog.apps.review.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3805/FIWARE.backlog.cloud.review.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3808/FIWARE.backlog.iot.review.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3806/FIWARE.backlog.data.review.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3807/FIWARE.backlog.i2nd.review.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3810/FIWARE.backlog.security.review.20140421.xlsx https://forge.fi-ware.org/docman/view.php/27/3809/FIWARE.backlog.miwi.review.20140421.xlsx If anything, please, don't hesitate to let me know. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 13712 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 23 09:23:53 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 23 Apr 2014 07:23:53 +0000 Subject: [Fiware-apps] MArket Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD31711@DEWDFEMB14A.global.corp.sap> Hi all, A Hint that I collected from Juan: For section 3.4.1 "Market Structure" you might consider using your SOTA content that your wrote in previous deliverables and update this in 4.3.1. But please remind, that IMHO you _must_ mention in your text relevant companies and product names and discuss them a bit - not only mentioning some technologies (like XML, BPMN, ...), or let me say so that at least I consider this not enough. To fulfill this, please do not forget to add such as a "top 3-5 list" of players or product in your market area and add a short discussion of these players or product - it must not be too long but IMHO should not be missed since it is the minimum example of a market overview. Best Markus From: Heller, Markus Sent: Dienstag, 22. April 2014 17:42 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: MArket Hi all, Under leadership of Juan Barreno we have to deliver the WP3 part of D.11.1.3: FI-WARE Market and Competition Analysis. D11.1.3 goes hand in hand with the D11.2.3 Exploitation Plan where we also have to contribute. I attach the current WORD draft of the deliverable and explain the approach (attachment): A) Table of Contents: Please check the attached WORD, I have structured our WP3 contributions to D11.1.3 like this: We need to deliver the WP3 part there, where we contribute the complete section 4.3 "Economy of Internet Application". Please check also the COMMENTS and the chapters 4.4ff where I (will be deleted) later copy/pasted possible texts from SOTA, Market Study, or Exploitation Plan deliverables which might be helpful for you (or not). [cid:image005.png at 01CF5ED5.BE5AA410] B) Needed Contributions: ? The sections on "3.4.1 Market Structures" and "3.4.2 Vertical Markets" are requested by Juan and reviewers - and they will be collectively written by us all. ? For this to happen, we will in each subsection simply report along the "usage scenarios" concept that we have introduced in our last D11.2.2 "Exploitation Plan". Reason behind is that this allows this way to have more targeted areas/partial market where we can write about: "These building blocks are described along four key usage scenarios (see D11.2.2 Exploitation Plan). In the following, the analysis is structured according to these key usage scenarios which address different partial markets. 1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID) 2. Revenue sharing (@TID) 3. Supporting service composition and crowd-sourcing (@ATOS, UPM, EAB, DT) 4. Supporting Interoperability with Mediation (@TI, THALES)" C) Teams/Authors: ? per usage scenario, we contribute in the teams as marked above in the YELLOW marking. D) Deadlines for D11.1.3: ? "Wave 1" - only for M36 leaving partners (SAP, iminds, DT) --> Juan did not set a deadline, so I neded to set one. I set it to 28.April EOB so that we need to deliver this week the contents or on Monday next week. ? "Wave 2" - for all others staying longer --> Juan did not set a deadline E) Your Action Items: ? @SAP, iMinds, DT: Please proceed and contribute your part of the work, please reach out to your coauthors for this to happen. o Only wave 1 partners need to contribute NOW (SAP, iMinds, DT), the others can deliver later if they wish according to Juan. o I see a dilemma that e.g. for usage scenario 1 and 2, wave 1 partners need to deliver with wave 2 partners so how to ensure that they fit together. o To solve this dilemma, the wave 1 partners must write useful (!) section NOW and contact your wave2 co-authors NOW to align/agree that your wave 1 contribution works together with their wave 2 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. o Wave 1 authors will deliver until deadline (28.4.) and the parts are delivered to TID as "internal deliverable" to get a small contribution certificate that we have delivered. ? @ALL OTHERS: o Please contact your wave 1 co-authors on your own align/agree with your co-authors NOW that your wave 2 contribution works together with the wave 1 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. Orga Telco possible: If many wish, we can organize a telco tomorrow on this topic to make sure that no questions remain. Please signal your interest... Best wishes Markus --------- Hi Markus The 28th is Ok for me Best Juan Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image002.png at 01CF21D2.D8BA98F0] From: Heller, Markus [mailto:markus.heller at sap.com] Sent: Monday, April 14, 2014 3:38 PM To: Bareno Guerenabarrena, Juan Subject: RE: WP11 Tasks for partners leaving on M36 Hi Juan, What is the deadline date for the Exploitation Plan and for the Market analysis to be delivered to you, I have not found a given deadline below, sorry? I guess you do not need to carry out checks but just more or less, if the format etc appropriate, collect our plan and check it and then together with TID issue the "internal deliverable certificate" then for this contribution. So would a deadline Monday 28.04. ok you? Best Markus From: Bareno Guerenabarrena, Juan [mailto:juan.bareno at atos.net] Sent: Dienstag, 8. April 2014 20:09 To: fiware-exploitation at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; Heller, Markus; Amon, Peter (p.amon at siemens.com); Bettina.Lehmann at telekom.de; Hans.Einsiedler at telekom.de; Banniza, Thomas-Rolf (Thomas-Rolf (thomas-rolf.banniza at alcatel-lucent.com); Wuenstel, Klaus (Klaus (klaus.wuenstel at alcatel-lucent.com); Seidl, Robert (NSN - DE/Munich (robert.seidl at nsn.com); koen.casier at intec.ugent.be Cc: lindsay.frost at neclab.eu; De-Lama Sanchez, Nuria; mcp at tid.es Subject: WP11 Tasks for partners leaving on M36 Dear Colleagues I need your contributions to WP11 deliverables before you leave the project on M36. My colleague Lindsay Frost from NEC, in cc, should demand your contributions for standardization deliverable. Basically I need the following: ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. ? All the individual exploitation plans should be described in the Annex 1 of the D11.2.3 ? Just additional/significative info that should be consider as confidential could be delivered in a confidential basis to Arian (Arian.ZWEGERS at ec.europa.eu) ? We will make a follow-up in the next WPL meetings [cid:image005.jpg at 01CF57F7.E6EEEBF0] [cid:image006.jpg at 01CF57F7.E6EEEBF0] ? WP3 contribution, as SAP leads it, regarding D11.1.3- Apps - Market Analysis (state of art, competitors, similar solutions in the market, potential added value, potential business models...) and D11.2.3- FI WARE Apps building block Exploitation (added value, business model selected, FI-Lab modus operandi.....)- SEE Initial draft TOCs attached and add or provide reference documents to complete ? Please take into account the following recommendations for the next review, some contribution (reference text, studies, references...) for the following recommendations for the review, will be very welcome and appreciated: D11.1.3- Market Analysis ? Analysis of last review recommendations analysis ? Continue to analyze ICT Market situation in relation with GEs ? The exploitation of FI technologies in the three main market sectors of Smart Cities, Smart Business, and Smart Home needs to be deepened ? The perspectives of the demand side are comparatively lacking even for the main verticals identified, e.g. business related services and manufacturing ? The policy and regulatory analysis in relation to the specific themes (Data protection, Cloud Computing, FI-LAB modus operandi) D11.2.3- Exploitation Plan ? FI-LAB Modus Operandi, Financing and Business model definition is needed and even how this vehicle is to be created in the first instance is totally opaque and uncertain. ? To define the extent of collaboration with the EIT ICT lab ? The potential policy issues and impact on the specific exploitation activities of FI-WARE partners and the evolution of the FI LAB should be more specifically identified and described ? At a detailed level, the document is less concrete in the examples and scenario descriptions provided in the Apps market sections. Some statements might be (even) more convincing if backed up by survey results; e.g. the business opportunity of the M2M market ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. D11.4.3- Standardization ? A Standardization Global Picture is required, as an effective means to enable market uptake of FI WARE results Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image007.jpg at 01CF57F7.E6EEEBF0] -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 114198 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 23 11:16:40 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 23 Apr 2014 09:16:40 +0000 Subject: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD318A8@DEWDFEMB14A.global.corp.sap> Dear all, I would like to clarify with this mail how we proceed with the Architecture Deliverable and the Open Spec Deliverable for Apps chapter: A) D2.3.3 FI-WARE Architecture: Juanjo has reviewed a WORD generated from private wiki. Torsten Leidig sent it per email to you and each partner has updated their contributions according to JH review until the deadline 22.4 (yesterday). Next steps: 1. Copy content from private wiki into public wiki 2. Generate a WORD based on private wiki and sent to TID. B) D3.1.3 FI-WARE GE Open Specifications: Juanjo advised us to go ahead with no delay and publish. We did not receive a review result with improvement needs or so and all partners do not need to do updates based on his Review. Next step: 1. Copy content from private wiki to public wiki Action Items: @ALL: You as partner have 1 more day and you need to make sure that all your needed updates are completed in the private wiki until tomorrow. --> Deadline: Tomorrow EOB Thursday 24.4 @SAP: To simplify, SAP will carry out the listed next steps towards delivery. We will begin with this on Friday morning (25.4). Best Markus -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 20617 bytes Desc: not available URL: From markus.heller at sap.com Tue Apr 22 17:41:44 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 22 Apr 2014 15:41:44 +0000 Subject: [Fiware-apps] MArket Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD3153D@DEWDFEMB14A.global.corp.sap> Hi all, Under leadership of Juan Barreno we have to deliver the WP3 part of D.11.1.3: FI-WARE Market and Competition Analysis. D11.1.3 goes hand in hand with the D11.2.3 Exploitation Plan where we also have to contribute. I attach the current WORD draft of the deliverable and explain the approach (attachment): A) Table of Contents: Please check the attached WORD, I have structured our WP3 contributions to D11.1.3 like this: We need to deliver the WP3 part there, where we contribute the complete section 4.3 "Economy of Internet Application". Please check also the COMMENTS and the chapters 4.4ff where I (will be deleted) later copy/pasted possible texts from SOTA, Market Study, or Exploitation Plan deliverables which might be helpful for you (or not). [cid:image005.png at 01CF5E51.BAAC9C30] B) Needed Contributions: ? The sections on "3.4.1 Market Structures" and "3.4.2 Vertical Markets" are requested by Juan and reviewers - and they will be collectively written by us all. ? For this to happen, we will in each subsection simply report along the "usage scenarios" concept that we have introduced in our last D11.2.2 "Exploitation Plan". Reason behind is that this allows this way to have more targeted areas/partial market where we can write about: "These building blocks are described along four key usage scenarios (see D11.2.2 Exploitation Plan). In the following, the analysis is structured according to these key usage scenarios which address different partial markets. 1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID) 2. Revenue sharing (@TID) 3. Supporting service composition and crowd-sourcing (@ATOS, UPM, EAB, DT) 4. Supporting Interoperability with Mediation (@TI, THALES)" C) Teams/Authors: ? per usage scenario, we contribute in the teams as marked above in the YELLOW marking. D) Deadlines for D11.1.3: ? "Wave 1" - only for M36 leaving partners (SAP, iminds, DT) --> Juan did not set a deadline, so I neded to set one. I set it to 28.April EOB so that we need to deliver this week the contents or on Monday next week. ? "Wave 2" - for all others staying longer --> Juan did not set a deadline E) Your Action Items: ? @SAP, iMinds, DT: Please proceed and contribute your part of the work, please reach out to your coauthors for this to happen. o Only wave 1 partners need to contribute NOW (SAP, iMinds, DT), the others can deliver later if they wish according to Juan. o I see a dilemma that e.g. for usage scenario 1 and 2, wave 1 partners need to deliver with wave 2 partners so how to ensure that they fit together. o To solve this dilemma, the wave 1 partners must write useful (!) section NOW and contact your wave2 co-authors NOW to align/agree that your wave 1 contribution works together with their wave 2 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. o Wave 1 authors will deliver until deadline (28.4.) and the parts are delivered to TID as "internal deliverable" to get a small contribution certificate that we have delivered. ? @ALL OTHERS: o Please contact your wave 1 co-authors on your own align/agree with your co-authors NOW that your wave 2 contribution works together with the wave 1 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. Orga Telco possible: If many wish, we can organize a telco tomorrow on this topic to make sure that no questions remain. Please signal your interest... Best wishes Markus --------- Hi Markus The 28th is Ok for me Best Juan Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image002.png at 01CF21D2.D8BA98F0] From: Heller, Markus [mailto:markus.heller at sap.com] Sent: Monday, April 14, 2014 3:38 PM To: Bareno Guerenabarrena, Juan Subject: RE: WP11 Tasks for partners leaving on M36 Hi Juan, What is the deadline date for the Exploitation Plan and for the Market analysis to be delivered to you, I have not found a given deadline below, sorry? I guess you do not need to carry out checks but just more or less, if the format etc appropriate, collect our plan and check it and then together with TID issue the "internal deliverable certificate" then for this contribution. So would a deadline Monday 28.04. ok you? Best Markus From: Bareno Guerenabarrena, Juan [mailto:juan.bareno at atos.net] Sent: Dienstag, 8. April 2014 20:09 To: fiware-exploitation at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; Heller, Markus; Amon, Peter (p.amon at siemens.com); Bettina.Lehmann at telekom.de; Hans.Einsiedler at telekom.de; Banniza, Thomas-Rolf (Thomas-Rolf (thomas-rolf.banniza at alcatel-lucent.com); Wuenstel, Klaus (Klaus (klaus.wuenstel at alcatel-lucent.com); Seidl, Robert (NSN - DE/Munich (robert.seidl at nsn.com); koen.casier at intec.ugent.be Cc: lindsay.frost at neclab.eu; De-Lama Sanchez, Nuria; mcp at tid.es Subject: WP11 Tasks for partners leaving on M36 Dear Colleagues I need your contributions to WP11 deliverables before you leave the project on M36. My colleague Lindsay Frost from NEC, in cc, should demand your contributions for standardization deliverable. Basically I need the following: ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. ? All the individual exploitation plans should be described in the Annex 1 of the D11.2.3 ? Just additional/significative info that should be consider as confidential could be delivered in a confidential basis to Arian (Arian.ZWEGERS at ec.europa.eu) ? We will make a follow-up in the next WPL meetings [cid:image005.jpg at 01CF57F7.E6EEEBF0] [cid:image006.jpg at 01CF57F7.E6EEEBF0] ? WP3 contribution, as SAP leads it, regarding D11.1.3- Apps - Market Analysis (state of art, competitors, similar solutions in the market, potential added value, potential business models...) and D11.2.3- FI WARE Apps building block Exploitation (added value, business model selected, FI-Lab modus operandi.....)- SEE Initial draft TOCs attached and add or provide reference documents to complete ? Please take into account the following recommendations for the next review, some contribution (reference text, studies, references...) for the following recommendations for the review, will be very welcome and appreciated: D11.1.3- Market Analysis ? Analysis of last review recommendations analysis ? Continue to analyze ICT Market situation in relation with GEs ? The exploitation of FI technologies in the three main market sectors of Smart Cities, Smart Business, and Smart Home needs to be deepened ? The perspectives of the demand side are comparatively lacking even for the main verticals identified, e.g. business related services and manufacturing ? The policy and regulatory analysis in relation to the specific themes (Data protection, Cloud Computing, FI-LAB modus operandi) D11.2.3- Exploitation Plan ? FI-LAB Modus Operandi, Financing and Business model definition is needed and even how this vehicle is to be created in the first instance is totally opaque and uncertain. ? To define the extent of collaboration with the EIT ICT lab ? The potential policy issues and impact on the specific exploitation activities of FI-WARE partners and the evolution of the FI LAB should be more specifically identified and described ? At a detailed level, the document is less concrete in the examples and scenario descriptions provided in the Apps market sections. Some statements might be (even) more convincing if backed up by survey results; e.g. the business opportunity of the M2M market ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. D11.4.3- Standardization ? A Standardization Global Picture is required, as an effective means to enable market uptake of FI WARE results Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image007.jpg at 01CF57F7.E6EEEBF0] -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 8372932 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 23 13:48:57 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 23 Apr 2014 11:48:57 +0000 Subject: [Fiware-apps] FW: MArket In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD31711@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD31711@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD31A45@DEWDFEMB14A.global.corp.sap> Hi UPM, SAP, iMinds, TID, For the Market study deliverable, we are together in the first "usage scenario" group named "1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID)", that is why I wrote only to the four of us directly: The core idea of how we can structure our text contribution for this deliverable as said before (in the WP3 telco and my mail from yesterday) is to motivate at the beginning re-using/citing from D12.2.2 "Exploitation Plan" storyline of chapter "4.4 Applications Services Ecosystem" that in WP3 there are three building blocks of the infrastructure we provide as WP (Core business framework, composition tools, mediator) and that we have four "usage scenarios" as described there. I have now started to draft an outline of our contributions needed as input. I can send it around later today so that spaces are assigned where you can fill-in your content - if you agree. For our usage scenario Nr.1 we have to describe (a) Market Structure / Top Players and (b) Vertical Markets, I propose this: ? For (a) Market Structure Top Players: I would create a skeleton text that has multiple slots where you then fill in some content, basically each slot with a top 3-5 list & brief discussion of players or products (preferably discuss players first (reason: if we all this the same, it looks more homogenous, but if more useful, then go ahead and discuss products, afterall we are happy for any contents..... You can heavily build on the SOTA content that you wrote before in the Project, so that it is rather consistent naturally. I have copied some content into the template I already sent, but feel free and help yourself. Afterall, just fill your slots... If you do not agree, with this skeleton & slots approach, please mail to all mail receivers so that we can discuss in the team. ? For (b): Vertical markets: Here I see a rather loose list with bullet points, where we collect vertical markets and real examples (examples are important as requested by reviewers). Each one of us provides some, so that the whole list gives the overview where we are active. Markets are briefly described (1-2 sentences) and why they are relevant for us here, example also briefly described. If you do not agree with this bullet list freestyle approach (chosen mainly because we can contribute individually and puzzle it together), please mail to all mail receivers so that we can discuss in the team. OK? Please reply if you agree or not. I will send later today or tomorrow early morning the next WORD with my prefilled text areas (not final, but giving you the slots)... Best Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 09:24 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: MArket Hi all, A Hint that I collected from Juan: For section 3.4.1 "Market Structure" you might consider using your SOTA content that your wrote in previous deliverables and update this in 4.3.1. But please remind, that IMHO you _must_ mention in your text relevant companies and product names and discuss them a bit - not only mentioning some technologies (like XML, BPMN, ...), or let me say so that at least I consider this not enough. To fulfill this, please do not forget to add such as a "top 3-5 list" of players or product in your market area and add a short discussion of these players or product - it must not be too long but IMHO should not be missed since it is the minimum example of a market overview. Best Markus From: Heller, Markus Sent: Dienstag, 22. April 2014 17:42 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: MArket Hi all, Under leadership of Juan Barreno we have to deliver the WP3 part of D.11.1.3: FI-WARE Market and Competition Analysis. D11.1.3 goes hand in hand with the D11.2.3 Exploitation Plan where we also have to contribute. I attach the current WORD draft of the deliverable and explain the approach (attachment): A) Table of Contents: Please check the attached WORD, I have structured our WP3 contributions to D11.1.3 like this: We need to deliver the WP3 part there, where we contribute the complete section 4.3 "Economy of Internet Application". Please check also the COMMENTS and the chapters 4.4ff where I (will be deleted) later copy/pasted possible texts from SOTA, Market Study, or Exploitation Plan deliverables which might be helpful for you (or not). [cid:image005.png at 01CF5ED5.BE5AA410] B) Needed Contributions: ? The sections on "3.4.1 Market Structures" and "3.4.2 Vertical Markets" are requested by Juan and reviewers - and they will be collectively written by us all. ? For this to happen, we will in each subsection simply report along the "usage scenarios" concept that we have introduced in our last D11.2.2 "Exploitation Plan". Reason behind is that this allows this way to have more targeted areas/partial market where we can write about: "These building blocks are described along four key usage scenarios (see D11.2.2 Exploitation Plan). In the following, the analysis is structured according to these key usage scenarios which address different partial markets. 1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID) 2. Revenue sharing (@TID) 3. Supporting service composition and crowd-sourcing (@ATOS, UPM, EAB, DT) 4. Supporting Interoperability with Mediation (@TI, THALES)" C) Teams/Authors: ? per usage scenario, we contribute in the teams as marked above in the YELLOW marking. D) Deadlines for D11.1.3: ? "Wave 1" - only for M36 leaving partners (SAP, iminds, DT) --> Juan did not set a deadline, so I neded to set one. I set it to 28.April EOB so that we need to deliver this week the contents or on Monday next week. ? "Wave 2" - for all others staying longer --> Juan did not set a deadline E) Your Action Items: ? @SAP, iMinds, DT: Please proceed and contribute your part of the work, please reach out to your coauthors for this to happen. o Only wave 1 partners need to contribute NOW (SAP, iMinds, DT), the others can deliver later if they wish according to Juan. o I see a dilemma that e.g. for usage scenario 1 and 2, wave 1 partners need to deliver with wave 2 partners so how to ensure that they fit together. o To solve this dilemma, the wave 1 partners must write useful (!) section NOW and contact your wave2 co-authors NOW to align/agree that your wave 1 contribution works together with their wave 2 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. o Wave 1 authors will deliver until deadline (28.4.) and the parts are delivered to TID as "internal deliverable" to get a small contribution certificate that we have delivered. ? @ALL OTHERS: o Please contact your wave 1 co-authors on your own align/agree with your co-authors NOW that your wave 2 contribution works together with the wave 1 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. Orga Telco possible: If many wish, we can organize a telco tomorrow on this topic to make sure that no questions remain. Please signal your interest... Best wishes Markus --------- Hi Markus The 28th is Ok for me Best Juan Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image002.png at 01CF21D2.D8BA98F0] From: Heller, Markus [mailto:markus.heller at sap.com] Sent: Monday, April 14, 2014 3:38 PM To: Bareno Guerenabarrena, Juan Subject: RE: WP11 Tasks for partners leaving on M36 Hi Juan, What is the deadline date for the Exploitation Plan and for the Market analysis to be delivered to you, I have not found a given deadline below, sorry? I guess you do not need to carry out checks but just more or less, if the format etc appropriate, collect our plan and check it and then together with TID issue the "internal deliverable certificate" then for this contribution. So would a deadline Monday 28.04. ok you? Best Markus From: Bareno Guerenabarrena, Juan [mailto:juan.bareno at atos.net] Sent: Dienstag, 8. April 2014 20:09 To: fiware-exploitation at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; Heller, Markus; Amon, Peter (p.amon at siemens.com); Bettina.Lehmann at telekom.de; Hans.Einsiedler at telekom.de; Banniza, Thomas-Rolf (Thomas-Rolf (thomas-rolf.banniza at alcatel-lucent.com); Wuenstel, Klaus (Klaus (klaus.wuenstel at alcatel-lucent.com); Seidl, Robert (NSN - DE/Munich (robert.seidl at nsn.com); koen.casier at intec.ugent.be Cc: lindsay.frost at neclab.eu; De-Lama Sanchez, Nuria; mcp at tid.es Subject: WP11 Tasks for partners leaving on M36 Dear Colleagues I need your contributions to WP11 deliverables before you leave the project on M36. My colleague Lindsay Frost from NEC, in cc, should demand your contributions for standardization deliverable. Basically I need the following: ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. ? All the individual exploitation plans should be described in the Annex 1 of the D11.2.3 ? Just additional/significative info that should be consider as confidential could be delivered in a confidential basis to Arian (Arian.ZWEGERS at ec.europa.eu) ? We will make a follow-up in the next WPL meetings [cid:image005.jpg at 01CF57F7.E6EEEBF0] [cid:image006.jpg at 01CF57F7.E6EEEBF0] ? WP3 contribution, as SAP leads it, regarding D11.1.3- Apps - Market Analysis (state of art, competitors, similar solutions in the market, potential added value, potential business models...) and D11.2.3- FI WARE Apps building block Exploitation (added value, business model selected, FI-Lab modus operandi.....)- SEE Initial draft TOCs attached and add or provide reference documents to complete ? Please take into account the following recommendations for the next review, some contribution (reference text, studies, references...) for the following recommendations for the review, will be very welcome and appreciated: D11.1.3- Market Analysis ? Analysis of last review recommendations analysis ? Continue to analyze ICT Market situation in relation with GEs ? The exploitation of FI technologies in the three main market sectors of Smart Cities, Smart Business, and Smart Home needs to be deepened ? The perspectives of the demand side are comparatively lacking even for the main verticals identified, e.g. business related services and manufacturing ? The policy and regulatory analysis in relation to the specific themes (Data protection, Cloud Computing, FI-LAB modus operandi) D11.2.3- Exploitation Plan ? FI-LAB Modus Operandi, Financing and Business model definition is needed and even how this vehicle is to be created in the first instance is totally opaque and uncertain. ? To define the extent of collaboration with the EIT ICT lab ? The potential policy issues and impact on the specific exploitation activities of FI-WARE partners and the evolution of the FI LAB should be more specifically identified and described ? At a detailed level, the document is less concrete in the examples and scenario descriptions provided in the Apps market sections. Some statements might be (even) more convincing if backed up by survey results; e.g. the business opportunity of the M2M market ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. D11.4.3- Standardization ? A Standardization Global Picture is required, as an effective means to enable market uptake of FI WARE results Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image007.jpg at 01CF57F7.E6EEEBF0] -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 123482 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 23 15:40:30 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 23 Apr 2014 13:40:30 +0000 Subject: [Fiware-apps] MArket In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD31A45@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD31711@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD31A45@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD31B53@DEWDFEMB14A.global.corp.sap> Hi UPM, SAP, iMinds, I attach the drafted WORD (V3). Please check, basically the idea as below....adopting SOTA content and updating and tailoring for different target reader (market analyst instead of state of the art). To focus on the most interesting area first, I would think we should put stores/marketplaces analyis and bemes into foreground and move registry/repository into the second, less important line since there a market analysis is less obvious. Best Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 13:49 To: Koen Casier (koen.casier at intec.ugent.be); Camille Reynders; JAVIER DE PEDRO SANCHEZ (jdps at tid.es); Alvaro Arranz; JAVIER LUCIO RUIZ-ANDINO Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: FW: MArket Hi UPM, SAP, iMinds, TID, For the Market study deliverable, we are together in the first "usage scenario" group named "1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID)", that is why I wrote only to the four of us directly: The core idea of how we can structure our text contribution for this deliverable as said before (in the WP3 telco and my mail from yesterday) is to motivate at the beginning re-using/citing from D12.2.2 "Exploitation Plan" storyline of chapter "4.4 Applications Services Ecosystem" that in WP3 there are three building blocks of the infrastructure we provide as WP (Core business framework, composition tools, mediator) and that we have four "usage scenarios" as described there. I have now started to draft an outline of our contributions needed as input. I can send it around later today so that spaces are assigned where you can fill-in your content - if you agree. For our usage scenario Nr.1 we have to describe (a) Market Structure / Top Players and (b) Vertical Markets, I propose this: ? For (a) Market Structure Top Players: I would create a skeleton text that has multiple slots where you then fill in some content, basically each slot with a top 3-5 list & brief discussion of players or products (preferably discuss players first (reason: if we all this the same, it looks more homogenous, but if more useful, then go ahead and discuss products, afterall we are happy for any contents..... You can heavily build on the SOTA content that you wrote before in the Project, so that it is rather consistent naturally. I have copied some content into the template I already sent, but feel free and help yourself. Afterall, just fill your slots... If you do not agree, with this skeleton & slots approach, please mail to all mail receivers so that we can discuss in the team. ? For (b): Vertical markets: Here I see a rather loose list with bullet points, where we collect vertical markets and real examples (examples are important as requested by reviewers). Each one of us provides some, so that the whole list gives the overview where we are active. Markets are briefly described (1-2 sentences) and why they are relevant for us here, example also briefly described. If you do not agree with this bullet list freestyle approach (chosen mainly because we can contribute individually and puzzle it together), please mail to all mail receivers so that we can discuss in the team. OK? Please reply if you agree or not. I will send later today or tomorrow early morning the next WORD with my prefilled text areas (not final, but giving you the slots)... Best Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 09:24 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: MArket Hi all, A Hint that I collected from Juan: For section 3.4.1 "Market Structure" you might consider using your SOTA content that your wrote in previous deliverables and update this in 4.3.1. But please remind, that IMHO you _must_ mention in your text relevant companies and product names and discuss them a bit - not only mentioning some technologies (like XML, BPMN, ...), or let me say so that at least I consider this not enough. To fulfill this, please do not forget to add such as a "top 3-5 list" of players or product in your market area and add a short discussion of these players or product - it must not be too long but IMHO should not be missed since it is the minimum example of a market overview. Best Markus From: Heller, Markus Sent: Dienstag, 22. April 2014 17:42 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: MArket Hi all, Under leadership of Juan Barreno we have to deliver the WP3 part of D.11.1.3: FI-WARE Market and Competition Analysis. D11.1.3 goes hand in hand with the D11.2.3 Exploitation Plan where we also have to contribute. I attach the current WORD draft of the deliverable and explain the approach (attachment): A) Table of Contents: Please check the attached WORD, I have structured our WP3 contributions to D11.1.3 like this: We need to deliver the WP3 part there, where we contribute the complete section 4.3 "Economy of Internet Application". Please check also the COMMENTS and the chapters 4.4ff where I (will be deleted) later copy/pasted possible texts from SOTA, Market Study, or Exploitation Plan deliverables which might be helpful for you (or not). [cid:image001.png at 01CF5F0A.575BCF20] B) Needed Contributions: ? The sections on "3.4.1 Market Structures" and "3.4.2 Vertical Markets" are requested by Juan and reviewers - and they will be collectively written by us all. ? For this to happen, we will in each subsection simply report along the "usage scenarios" concept that we have introduced in our last D11.2.2 "Exploitation Plan". Reason behind is that this allows this way to have more targeted areas/partial market where we can write about: "These building blocks are described along four key usage scenarios (see D11.2.2 Exploitation Plan). In the following, the analysis is structured according to these key usage scenarios which address different partial markets. 1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID) 2. Revenue sharing (@TID) 3. Supporting service composition and crowd-sourcing (@ATOS, UPM, EAB, DT) 4. Supporting Interoperability with Mediation (@TI, THALES)" C) Teams/Authors: ? per usage scenario, we contribute in the teams as marked above in the YELLOW marking. D) Deadlines for D11.1.3: ? "Wave 1" - only for M36 leaving partners (SAP, iminds, DT) --> Juan did not set a deadline, so I neded to set one. I set it to 28.April EOB so that we need to deliver this week the contents or on Monday next week. ? "Wave 2" - for all others staying longer --> Juan did not set a deadline E) Your Action Items: ? @SAP, iMinds, DT: Please proceed and contribute your part of the work, please reach out to your coauthors for this to happen. o Only wave 1 partners need to contribute NOW (SAP, iMinds, DT), the others can deliver later if they wish according to Juan. o I see a dilemma that e.g. for usage scenario 1 and 2, wave 1 partners need to deliver with wave 2 partners so how to ensure that they fit together. o To solve this dilemma, the wave 1 partners must write useful (!) section NOW and contact your wave2 co-authors NOW to align/agree that your wave 1 contribution works together with their wave 2 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. o Wave 1 authors will deliver until deadline (28.4.) and the parts are delivered to TID as "internal deliverable" to get a small contribution certificate that we have delivered. ? @ALL OTHERS: o Please contact your wave 1 co-authors on your own align/agree with your co-authors NOW that your wave 2 contribution works together with the wave 1 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. Orga Telco possible: If many wish, we can organize a telco tomorrow on this topic to make sure that no questions remain. Please signal your interest... Best wishes Markus --------- Hi Markus The 28th is Ok for me Best Juan Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image002.png at 01CF21D2.D8BA98F0] From: Heller, Markus [mailto:markus.heller at sap.com] Sent: Monday, April 14, 2014 3:38 PM To: Bareno Guerenabarrena, Juan Subject: RE: WP11 Tasks for partners leaving on M36 Hi Juan, What is the deadline date for the Exploitation Plan and for the Market analysis to be delivered to you, I have not found a given deadline below, sorry? I guess you do not need to carry out checks but just more or less, if the format etc appropriate, collect our plan and check it and then together with TID issue the "internal deliverable certificate" then for this contribution. So would a deadline Monday 28.04. ok you? Best Markus From: Bareno Guerenabarrena, Juan [mailto:juan.bareno at atos.net] Sent: Dienstag, 8. April 2014 20:09 To: fiware-exploitation at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; Heller, Markus; Amon, Peter (p.amon at siemens.com); Bettina.Lehmann at telekom.de; Hans.Einsiedler at telekom.de; Banniza, Thomas-Rolf (Thomas-Rolf (thomas-rolf.banniza at alcatel-lucent.com); Wuenstel, Klaus (Klaus (klaus.wuenstel at alcatel-lucent.com); Seidl, Robert (NSN - DE/Munich (robert.seidl at nsn.com); koen.casier at intec.ugent.be Cc: lindsay.frost at neclab.eu; De-Lama Sanchez, Nuria; mcp at tid.es Subject: WP11 Tasks for partners leaving on M36 Dear Colleagues I need your contributions to WP11 deliverables before you leave the project on M36. My colleague Lindsay Frost from NEC, in cc, should demand your contributions for standardization deliverable. Basically I need the following: ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. ? All the individual exploitation plans should be described in the Annex 1 of the D11.2.3 ? Just additional/significative info that should be consider as confidential could be delivered in a confidential basis to Arian (Arian.ZWEGERS at ec.europa.eu) ? We will make a follow-up in the next WPL meetings [cid:image005.jpg at 01CF57F7.E6EEEBF0] [cid:image006.jpg at 01CF57F7.E6EEEBF0] ? WP3 contribution, as SAP leads it, regarding D11.1.3- Apps - Market Analysis (state of art, competitors, similar solutions in the market, potential added value, potential business models...) and D11.2.3- FI WARE Apps building block Exploitation (added value, business model selected, FI-Lab modus operandi.....)- SEE Initial draft TOCs attached and add or provide reference documents to complete ? Please take into account the following recommendations for the next review, some contribution (reference text, studies, references...) for the following recommendations for the review, will be very welcome and appreciated: D11.1.3- Market Analysis ? Analysis of last review recommendations analysis ? Continue to analyze ICT Market situation in relation with GEs ? The exploitation of FI technologies in the three main market sectors of Smart Cities, Smart Business, and Smart Home needs to be deepened ? The perspectives of the demand side are comparatively lacking even for the main verticals identified, e.g. business related services and manufacturing ? The policy and regulatory analysis in relation to the specific themes (Data protection, Cloud Computing, FI-LAB modus operandi) D11.2.3- Exploitation Plan ? FI-LAB Modus Operandi, Financing and Business model definition is needed and even how this vehicle is to be created in the first instance is totally opaque and uncertain. ? To define the extent of collaboration with the EIT ICT lab ? The potential policy issues and impact on the specific exploitation activities of FI-WARE partners and the evolution of the FI LAB should be more specifically identified and described ? At a detailed level, the document is less concrete in the examples and scenario descriptions provided in the Apps market sections. Some statements might be (even) more convincing if backed up by survey results; e.g. the business opportunity of the M2M market ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. D11.4.3- Standardization ? A Standardization Global Picture is required, as an effective means to enable market uptake of FI WARE results Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image007.jpg at 01CF57F7.E6EEEBF0] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 18991 bytes Desc: image001.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.png Type: image/png Size: 4687 bytes Desc: image002.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image003.jpg Type: image/jpeg Size: 9354 bytes Desc: image003.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image004.jpg Type: image/jpeg Size: 3257 bytes Desc: image004.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image005.jpg Type: image/jpeg Size: 4657 bytes Desc: image005.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D11.1.3-Market and Competition Analysis _M36v3 - SAP 3.doc Type: application/msword Size: 6519296 bytes Desc: D11.1.3-Market and Competition Analysis _M36v3 - SAP 3.doc URL: From markus.heller at sap.com Thu Apr 24 09:35:41 2014 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 24 Apr 2014 07:35:41 +0000 Subject: [Fiware-apps] MArket In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD31B53@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD31711@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD31A45@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD31B53@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD31F83@DEWDFEMB14A.global.corp.sap> Hi UPM, SAP, iMinds, Can you please send me a reply today how you plan to proceed here and if ok for you. I have received no reply so I do not know (to my knowledge, you all are not in easter holidays, right?) Please note that the deadline for this would be 28.4., please confirm that ok with you. Best Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 15:41 To: Koen Casier (koen.casier at intec.ugent.be); Camille Reynders; Alvaro Arranz; JAVIER LUCIO RUIZ-ANDINO; Javier Soriano (jsoriano at fi.upm.es) Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: MArket Hi UPM, SAP, iMinds, I attach the drafted WORD (V3). Please check, basically the idea as below....adopting SOTA content and updating and tailoring for different target reader (market analyst instead of state of the art). To focus on the most interesting area first, I would think we should put stores/marketplaces analyis and bemes into foreground and move registry/repository into the second, less important line since there a market analysis is less obvious. Best Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 13:49 To: Koen Casier (koen.casier at intec.ugent.be); Camille Reynders; JAVIER DE PEDRO SANCHEZ (jdps at tid.es); Alvaro Arranz; JAVIER LUCIO RUIZ-ANDINO Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: FW: MArket Hi UPM, SAP, iMinds, TID, For the Market study deliverable, we are together in the first "usage scenario" group named "1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID)", that is why I wrote only to the four of us directly: The core idea of how we can structure our text contribution for this deliverable as said before (in the WP3 telco and my mail from yesterday) is to motivate at the beginning re-using/citing from D12.2.2 "Exploitation Plan" storyline of chapter "4.4 Applications Services Ecosystem" that in WP3 there are three building blocks of the infrastructure we provide as WP (Core business framework, composition tools, mediator) and that we have four "usage scenarios" as described there. I have now started to draft an outline of our contributions needed as input. I can send it around later today so that spaces are assigned where you can fill-in your content - if you agree. For our usage scenario Nr.1 we have to describe (a) Market Structure / Top Players and (b) Vertical Markets, I propose this: ? For (a) Market Structure Top Players: I would create a skeleton text that has multiple slots where you then fill in some content, basically each slot with a top 3-5 list & brief discussion of players or products (preferably discuss players first (reason: if we all this the same, it looks more homogenous, but if more useful, then go ahead and discuss products, afterall we are happy for any contents..... You can heavily build on the SOTA content that you wrote before in the Project, so that it is rather consistent naturally. I have copied some content into the template I already sent, but feel free and help yourself. Afterall, just fill your slots... If you do not agree, with this skeleton & slots approach, please mail to all mail receivers so that we can discuss in the team. ? For (b): Vertical markets: Here I see a rather loose list with bullet points, where we collect vertical markets and real examples (examples are important as requested by reviewers). Each one of us provides some, so that the whole list gives the overview where we are active. Markets are briefly described (1-2 sentences) and why they are relevant for us here, example also briefly described. If you do not agree with this bullet list freestyle approach (chosen mainly because we can contribute individually and puzzle it together), please mail to all mail receivers so that we can discuss in the team. OK? Please reply if you agree or not. I will send later today or tomorrow early morning the next WORD with my prefilled text areas (not final, but giving you the slots)... Best Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 09:24 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: MArket Hi all, A Hint that I collected from Juan: For section 3.4.1 "Market Structure" you might consider using your SOTA content that your wrote in previous deliverables and update this in 4.3.1. But please remind, that IMHO you _must_ mention in your text relevant companies and product names and discuss them a bit - not only mentioning some technologies (like XML, BPMN, ...), or let me say so that at least I consider this not enough. To fulfill this, please do not forget to add such as a "top 3-5 list" of players or product in your market area and add a short discussion of these players or product - it must not be too long but IMHO should not be missed since it is the minimum example of a market overview. Best Markus From: Heller, Markus Sent: Dienstag, 22. April 2014 17:42 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: MArket Hi all, Under leadership of Juan Barreno we have to deliver the WP3 part of D.11.1.3: FI-WARE Market and Competition Analysis. D11.1.3 goes hand in hand with the D11.2.3 Exploitation Plan where we also have to contribute. I attach the current WORD draft of the deliverable and explain the approach (attachment): A) Table of Contents: Please check the attached WORD, I have structured our WP3 contributions to D11.1.3 like this: We need to deliver the WP3 part there, where we contribute the complete section 4.3 "Economy of Internet Application". Please check also the COMMENTS and the chapters 4.4ff where I (will be deleted) later copy/pasted possible texts from SOTA, Market Study, or Exploitation Plan deliverables which might be helpful for you (or not). [cid:image001.png at 01CF5FA0.8EEEBB50] B) Needed Contributions: ? The sections on "3.4.1 Market Structures" and "3.4.2 Vertical Markets" are requested by Juan and reviewers - and they will be collectively written by us all. ? For this to happen, we will in each subsection simply report along the "usage scenarios" concept that we have introduced in our last D11.2.2 "Exploitation Plan". Reason behind is that this allows this way to have more targeted areas/partial market where we can write about: "These building blocks are described along four key usage scenarios (see D11.2.2 Exploitation Plan). In the following, the analysis is structured according to these key usage scenarios which address different partial markets. 1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID) 2. Revenue sharing (@TID) 3. Supporting service composition and crowd-sourcing (@ATOS, UPM, EAB, DT) 4. Supporting Interoperability with Mediation (@TI, THALES)" C) Teams/Authors: ? per usage scenario, we contribute in the teams as marked above in the YELLOW marking. D) Deadlines for D11.1.3: ? "Wave 1" - only for M36 leaving partners (SAP, iminds, DT) --> Juan did not set a deadline, so I neded to set one. I set it to 28.April EOB so that we need to deliver this week the contents or on Monday next week. ? "Wave 2" - for all others staying longer --> Juan did not set a deadline E) Your Action Items: ? @SAP, iMinds, DT: Please proceed and contribute your part of the work, please reach out to your coauthors for this to happen. o Only wave 1 partners need to contribute NOW (SAP, iMinds, DT), the others can deliver later if they wish according to Juan. o I see a dilemma that e.g. for usage scenario 1 and 2, wave 1 partners need to deliver with wave 2 partners so how to ensure that they fit together. o To solve this dilemma, the wave 1 partners must write useful (!) section NOW and contact your wave2 co-authors NOW to align/agree that your wave 1 contribution works together with their wave 2 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. o Wave 1 authors will deliver until deadline (28.4.) and the parts are delivered to TID as "internal deliverable" to get a small contribution certificate that we have delivered. ? @ALL OTHERS: o Please contact your wave 1 co-authors on your own align/agree with your co-authors NOW that your wave 2 contribution works together with the wave 1 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. Orga Telco possible: If many wish, we can organize a telco tomorrow on this topic to make sure that no questions remain. Please signal your interest... Best wishes Markus --------- Hi Markus The 28th is Ok for me Best Juan Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image002.png at 01CF21D2.D8BA98F0] From: Heller, Markus [mailto:markus.heller at sap.com] Sent: Monday, April 14, 2014 3:38 PM To: Bareno Guerenabarrena, Juan Subject: RE: WP11 Tasks for partners leaving on M36 Hi Juan, What is the deadline date for the Exploitation Plan and for the Market analysis to be delivered to you, I have not found a given deadline below, sorry? I guess you do not need to carry out checks but just more or less, if the format etc appropriate, collect our plan and check it and then together with TID issue the "internal deliverable certificate" then for this contribution. So would a deadline Monday 28.04. ok you? Best Markus From: Bareno Guerenabarrena, Juan [mailto:juan.bareno at atos.net] Sent: Dienstag, 8. April 2014 20:09 To: fiware-exploitation at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; Heller, Markus; Amon, Peter (p.amon at siemens.com); Bettina.Lehmann at telekom.de; Hans.Einsiedler at telekom.de; Banniza, Thomas-Rolf (Thomas-Rolf (thomas-rolf.banniza at alcatel-lucent.com); Wuenstel, Klaus (Klaus (klaus.wuenstel at alcatel-lucent.com); Seidl, Robert (NSN - DE/Munich (robert.seidl at nsn.com); koen.casier at intec.ugent.be Cc: lindsay.frost at neclab.eu; De-Lama Sanchez, Nuria; mcp at tid.es Subject: WP11 Tasks for partners leaving on M36 Dear Colleagues I need your contributions to WP11 deliverables before you leave the project on M36. My colleague Lindsay Frost from NEC, in cc, should demand your contributions for standardization deliverable. Basically I need the following: ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. ? All the individual exploitation plans should be described in the Annex 1 of the D11.2.3 ? Just additional/significative info that should be consider as confidential could be delivered in a confidential basis to Arian (Arian.ZWEGERS at ec.europa.eu) ? We will make a follow-up in the next WPL meetings [cid:image005.jpg at 01CF57F7.E6EEEBF0] [cid:image006.jpg at 01CF57F7.E6EEEBF0] ? WP3 contribution, as SAP leads it, regarding D11.1.3- Apps - Market Analysis (state of art, competitors, similar solutions in the market, potential added value, potential business models...) and D11.2.3- FI WARE Apps building block Exploitation (added value, business model selected, FI-Lab modus operandi.....)- SEE Initial draft TOCs attached and add or provide reference documents to complete ? Please take into account the following recommendations for the next review, some contribution (reference text, studies, references...) for the following recommendations for the review, will be very welcome and appreciated: D11.1.3- Market Analysis ? Analysis of last review recommendations analysis ? Continue to analyze ICT Market situation in relation with GEs ? The exploitation of FI technologies in the three main market sectors of Smart Cities, Smart Business, and Smart Home needs to be deepened ? The perspectives of the demand side are comparatively lacking even for the main verticals identified, e.g. business related services and manufacturing ? The policy and regulatory analysis in relation to the specific themes (Data protection, Cloud Computing, FI-LAB modus operandi) D11.2.3- Exploitation Plan ? FI-LAB Modus Operandi, Financing and Business model definition is needed and even how this vehicle is to be created in the first instance is totally opaque and uncertain. ? To define the extent of collaboration with the EIT ICT lab ? The potential policy issues and impact on the specific exploitation activities of FI-WARE partners and the evolution of the FI LAB should be more specifically identified and described ? At a detailed level, the document is less concrete in the examples and scenario descriptions provided in the Apps market sections. Some statements might be (even) more convincing if backed up by survey results; e.g. the business opportunity of the M2M market ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. D11.4.3- Standardization ? A Standardization Global Picture is required, as an effective means to enable market uptake of FI WARE results Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image007.jpg at 01CF57F7.E6EEEBF0] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 18991 bytes Desc: image001.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.png Type: image/png Size: 4687 bytes Desc: image002.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image003.jpg Type: image/jpeg Size: 9354 bytes Desc: image003.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image004.jpg Type: image/jpeg Size: 3257 bytes Desc: image004.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image005.jpg Type: image/jpeg Size: 4657 bytes Desc: image005.jpg URL: From markus.heller at sap.com Thu Apr 24 09:44:52 2014 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 24 Apr 2014 07:44:52 +0000 Subject: [Fiware-apps] Packages mentioned in Exploitation Plan (our general section and in our individual exploitation plans) Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD31FB7@DEWDFEMB14A.global.corp.sap> Hi, I am currently writing the exploitation plan at the moment, and I would like to write about the packages that we (will) offer in WP3, I saw that the package descriptions might need checks if still ok: Can you please do this today or until Friday EOB: Questions to the package leads: - Please review and send an "ok" or your updated description to me where you correct and add the current info... - Timeline was not fixed until now, please define a (precise) date for the "timeline". Only "release 3" is not possible any more, what about "M36" or "M37"? For the P1 and P2 I prefer "M30" when we can achieve this, P3 is iMinds-only.... - Docu / catalog entries need to be written - we still waiting for Stefano's templates sadly.... Best Markus Package 1: * Name: "Business Framework Provisioning Package" (focus is on provisioning) * Lead: ATOS, Partners: ATOS, UPM, SAP * Used GEs: COMPEL, Store, Marketplace, Repository * Delivery: not recipes. Delivered as 1 single VM image with installed + integrated GEs to be offered in FI-LAB as "dedicated instances". * FI-WARE Catalog Pages: SAP can create them * Timeline: TBD (Release 3) * Comments: * Identity Management is left out here (agreed) and is used in package 2. * Story: User uses Store to create an offering (including adding metadata like WSDL link) and to publish it in Marketplace. COMPEL users can find/search it and use it.... * Technically: The service USDL includes as metadata a "link to WSDL". COMPEL relies on this and can access the offered service via WDSL * Enhancement needed in Store so that user can add metadata in USDL. Rest is integrated. 2) Package 2: * Name: "Business Framework Consumption Package" (focus is on consumption) * Lead: UPM, Partners: UPM, TID, SAP * Used GEs: Wirecloud, Store, Marketplace, Repository, RSS, Identity Management * Delivery: RECIPE-based solution that create/populates the solution into FI-LAB to be offered in FI-LAB as "dedicated instance (recipes)" (Plan B: like package 1) * FI-WARE Catalog Pages: SAP can create them * Timeline: TBD (Release 3) * Comments: * Identity Management integrated already and mandatory (ensure that same user performs actions) * RSS is only available as a "Global instance" and would run separately. The packaged GES access it via the URLS provided. 3) Package 3 * Name: BEMES: Integrated Multi-level business modeling and simulation toolkit * Lead: iMinds * Used GEs: Business Modeler, Business Calculator (there could be possibilities to link to repository and/or RSS) * Delivery: * Delivered as (a) 1 single VM image with installed + integrated GEs to be offfered in FILAB as dedicated instances * Delivered as (b) 1 integrated SaaS test-version online (outside of the FILAB) * Delivered as (c) a recipe for setting up an own version and integrating both GEs together with integration testing procedures * Timeline: R3.3 * Comments: * The installation in (a) allows for a quick installation of a testversion in the FiLAB with all interactions between the tools automated and/or relative to the server path. * This will allow for the business modeling and simulation tools to be setup in a one step process. The business calculator as well as the business modeler both have a simplified and local storage repository for the models and possibly this could be linked to the repository if interesting. * The installation in (b) allows for direct testing of the front-end and the back-end functionality. This will allow for a quick link with introduction of the tool,and will be complemented with course material indicating how the tool can be used. Possibly here the link to an SaaS RSS instance could be made. * The installation in (c) is aimed at academic usage (FRAND or free licensing) and commercial offers of the tool with a local installation of the binaries (speed and privacy). The recipe and integration testing will help in a quick and effortless installation here. -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 22604 bytes Desc: not available URL: From markus.heller at sap.com Thu Apr 24 11:30:16 2014 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 24 Apr 2014 09:30:16 +0000 Subject: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD318A8@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD318A8@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD323FA@DEWDFEMB14A.global.corp.sap> Hi, @ALL: Architecture Deliverable: Ready. Koen, Camille, Andreas Klein have mailed that they are ready (thx). So we from SAP can start with the next steps (copying to public wiki, generate WORD apps contribution for M36 partners). Please mail now otherwise. @ALL: Please mail now ASAP if you want to make updates to Open Specs still today until EOB. Have not received any mails on this from you.... Please object if you need.... Best wishes Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 11:17 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Dear all, I would like to clarify with this mail how we proceed with the Architecture Deliverable and the Open Spec Deliverable for Apps chapter: A) D2.3.3 FI-WARE Architecture: Juanjo has reviewed a WORD generated from private wiki. Torsten Leidig sent it per email to you and each partner has updated their contributions according to JH review until the deadline 22.4 (yesterday). Next steps: 1. Copy content from private wiki into public wiki 2. Generate a WORD based on private wiki and sent to TID. B) D3.1.3 FI-WARE GE Open Specifications: Juanjo advised us to go ahead with no delay and publish. We did not receive a review result with improvement needs or so and all partners do not need to do updates based on his Review. Next step: 1. Copy content from private wiki to public wiki Action Items: @ALL: You as partner have 1 more day and you need to make sure that all your needed updates are completed in the private wiki until tomorrow. --> Deadline: Tomorrow EOB Thursday 24.4 @SAP: To simplify, SAP will carry out the listed next steps towards delivery. We will begin with this on Friday morning (25.4). Best Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Thu Apr 24 15:05:39 2014 From: markus.heller at sap.com (Heller, Markus) Date: Thu, 24 Apr 2014 13:05:39 +0000 Subject: [Fiware-apps] [Fiware-wpl] URGENT: GEis installation and test --> reply now Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD325BD@DEWDFEMB14A.global.corp.sap> Hi all, @iMInds, DT, SAP: We are M36 leavers.... Kind reminder: I have not received any results yet (deadline tomorrow), but do not forget to send them until deadline tomorrow EOB (deadline from Stefano). Please mail to me each test you have completely documented (and to Stefano directly also). @All others - TID, THALES, TI, EAB, ATOS, UPM, iMinds; You have the choice, I guess. So each partner please confirm now your plan in a mail to me if you want to have your tests ready for - so that I know. a) "now" (deadline 25.4.) b) "later" (deadline 30.June) Best Markus From: Heller, Markus Sent: Dienstag, 15. April 2014 16:06 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: FW: [Fiware-wpl] URGENT: GEis installation and test Hi, After having fixed the partner testing agreements in our chapter, now the next step: 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. There is this restriction mentioned here by Stefano that M36-leaving partners are enforced to test now or have their GEs tested now. Nevertheless, as with other activities I recommend that ALL WP3 partners stick to the first until the deadline 25.4. complete the tests. Only partners going to extension period could choose to do it later (no one has until now asked for it), but I recommend to get it done now - only short task and we can stay together to complete it until end of April. For the GE tests, please follow instructions from Stefano below until 25.4 (we received it earlier, no changes): 1. Contact the GE owner of the GE you have to test and align with him how to test it. 2. Perform the test and fill out for each test an instance of the attached WORD document from Stefano and send it to...mmmh not mentioned what to do with it.....for example, send them to me for now... 3. Document your activity completion in the given GOOGLE DOC document or send directly to Stefano (I do not have a google doc account and cannot do it for you) Best Markus From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- An HTML attachment was scrubbed... URL: From koen.casier at intec.ugent.be Thu Apr 24 23:20:17 2014 From: koen.casier at intec.ugent.be (koen casier) Date: Thu, 24 Apr 2014 23:20:17 +0200 Subject: [Fiware-apps] MArket In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD31F83@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD31711@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD31A45@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD31B53@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD31F83@DEWDFEMB14A.global.corp.sap> Message-ID: <53598011.6090207@intec.ugent.be> Hi Markus, all, iMinds is working on this document and a new version can be found in attachment. We will be finalizing this as soon as possible and at least send a new version by tomorrow EOB. We believe that an update in the course of next week might be required though. Would it be possible to have a look at our new additions on pp. 50-52 and check whether this is in line with the bullet list approach suggested in one of the previous mails? All suggestions for additions and corrections are welcome as well of course. best regards, Koen On 4/24/2014 9:35 AM, Heller, Markus wrote: > > Hi UPM, SAP, iMinds, > > Can you please send me a reply today how you plan to proceed here and > if ok for you. I have received no reply so I do not know (to my > knowledge, you all are not in easter holidays, right?) > > Please note that the deadline for this would be 28.4., please confirm > that ok with you. > > Best > > Markus > > *From:*Heller, Markus > *Sent:* Mittwoch, 23. April 2014 15:41 > *To:* Koen Casier (koen.casier at intec.ugent.be); Camille Reynders; > Alvaro Arranz; JAVIER LUCIO RUIZ-ANDINO; Javier Soriano > (jsoriano at fi.upm.es) > *Cc:* FI-WARE Apps (fiware-apps at lists.fi-ware.org) > *Subject:* RE: MArket > > Hi UPM, SAP, iMinds, > > I attach the drafted WORD (V3). Please check, basically the idea as > below....adopting SOTA content and updating and tailoring for > different target reader (market analyst instead of state of the art). > > To focus on the most interesting area first, I would think we should > put stores/marketplaces analyis and bemes into foreground and move > registry/repository into the second, less important line since there a > market analysis is less obvious. > > Best > > Markus > > *From:*Heller, Markus > *Sent:* Mittwoch, 23. April 2014 13:49 > *To:* Koen Casier (koen.casier at intec.ugent.be > ); Camille Reynders; JAVIER DE > PEDRO SANCHEZ (jdps at tid.es ); Alvaro Arranz; > JAVIER LUCIO RUIZ-ANDINO > *Cc:* FI-WARE Apps (fiware-apps at lists.fi-ware.org > ) > *Subject:* FW: MArket > > Hi UPM, SAP, iMinds, TID, > > For the Market study deliverable, we are together in the *first "usage > scenario" group* named "1. Exploring new business models with the > Business Framework (@ UPM, SAP, iMinds, TID)", that is why I wrote > only to the four of us directly: > > The core idea of how we can structure our text contribution for this > deliverable as said before (in the WP3 telco and my mail from > yesterday) is to motivate at the beginning re-using/citing from > D12.2.2 "Exploitation Plan" storyline of chapter "4.4 Applications > Services Ecosystem" that in WP3 there are three /building blocks/ of > the infrastructure we provide as WP (Core business framework, > composition tools, mediator) and that we have four "/usage scenarios/" > as described there. > > I have now started to draft an outline of our contributions needed as > input. I can send it around later today so that spaces are assigned > where you can fill-in your content -- if you agree. > > For our usage scenario Nr.1 we have to describe (a) Market Structure / > Top Players and (b) Vertical Markets, I propose this: > > ?*For (a) Market Structure Top Players:* > > I would create a skeleton text that has multiple slots where you then > fill in some content, basically each slot with a top 3-5 list & brief > discussion of players or products (preferably discuss players first > (reason: if we all this the same, it looks more homogenous, but if > more useful, then go ahead and discuss products, afterall we are happy > for any contents..... > > You can heavily build on the SOTA content that you wrote before in the > Project, so that it is rather consistent naturally. I have copied some > content into the template I already sent, but feel free and help > yourself. Afterall, just fill your slots... > > If you do not agree, with this skeleton & slots approach, please mail > to all mail receivers so that we can discuss in the team. > > ?*For (b): Vertical markets:* > > Here I see a rather loose list with bullet points, where we collect > vertical markets and real examples (examples are important as > requested by reviewers). Each one of us provides some, so that the > whole list gives the overview where we are active. Markets are briefly > described (1-2 sentences) and why they are relevant for us here, > example also briefly described. > > If you do not agree with this bullet list freestyle approach (chosen > mainly because we can contribute individually and puzzle it together), > please mail to all mail receivers so that we can discuss in the team. > > OK? Please reply if you agree or not. > > I will send later today or tomorrow early morning the next WORD with > my prefilled text areas (not final, but giving you the slots)... > > Best > > Markus > > *From:*Heller, Markus > *Sent:* Mittwoch, 23. April 2014 09:24 > *To:* FI-WARE Apps (fiware-apps at lists.fi-ware.org > ) > *Subject:* RE: MArket > > Hi all, > > A Hint that I collected from Juan: > > For section 3.4.1 "Market Structure" you might consider using your > SOTA content that your wrote in previous deliverables and update this > in 4.3.1. > > But please remind, that IMHO you _/must/_ mention in your text > relevant companies and product names and discuss them a bit - not only > mentioning some technologies (like XML, BPMN, ...), or let me say so > that at least I consider this not enough. > > To fulfill this, please do not forget to add such as a "top 3-5 list" > of players or product in your market area and add a short discussion > of these players or product -- it must not be too long but IMHO should > not be missed since it is the minimum example of a market overview. > > Best > > Markus > > *From:*Heller, Markus > *Sent:* Dienstag, 22. April 2014 17:42 > *To:* FI-WARE Apps (fiware-apps at lists.fi-ware.org > ) > *Subject:* MArket > > Hi all, > > Under leadership of Juan Barreno we have to deliver the *WP3 part of > D.11.1.3: FI-WARE Market and Competition Analysis*. D11.1.3 goes hand > in hand with the D11.2.3 Exploitation Plan where we also have to > contribute. > > I attach the current WORD draft of the deliverable and explain the > approach (attachment): > > *A)**Table of Contents:* > > Please check the attached WORD, I have structured our WP3 > contributions to D11.1.3 like this: > > We need to deliver the WP3 part there, where we contribute the > complete section 4.3 "Economy of Internet Application". > > Please check also the /COMMENTS/ and the /chapters 4.4ff/ where I > (will be deleted) later copy/pasted possible texts from SOTA, Market > Study, or Exploitation Plan deliverables which might be helpful for > you (or not). > > *B)**Needed Contributions:* > > ?The sections on *"3.4.1 Market Structures"* and *"3.4.2 Vertical > Markets"* are requested by Juan and reviewers -- and they will be > collectively written by us all. > > ?For this to happen, we will in each subsection simply report along > the "*usage scenarios*" concept that we have introduced in our last > D11.2.2 "Exploitation Plan". > Reason behind is that this allows this way to have more targeted > areas/partial market where we can write about: > > "These building blocks are described along four *key usage scenarios* > (see D11.2.2 Exploitation Plan). In the following, the analysis is > structured according to these key usage scenarios which address > different partial markets. > > 1.Exploring new business models with the Business Framework (@ UPM, > SAP, iMinds, TID) > > 2.Revenue sharing (@TID) > > 3.Supporting service composition and crowd-sourcing (@ATOS, UPM, EAB, DT) > > 4.Supporting Interoperability with Mediation (@TI, THALES)" > > *C)**Teams/Authors:* > > ?per usage scenario, we contribute in the teams as marked above in the > YELLOW marking. > > *D)**Deadlines for D11.1.3:* > > ** > > ?"Wave 1"-- only for M36 leaving partners (SAP, iminds, DT) ?Juan did > not set a deadline, so I neded to set one. I set it to 28.April EOB so > that we need to deliver this week the contents or on Monday next week. > > ?"Wave 2"- for all others staying longer ?Juan did not set a deadline > > *E)**Your Action Items:* > > ?*@SAP, iMinds, DT:*Please proceed and contribute your part of the > work, please reach out to your coauthors for this to happen. > > oOnly wave 1 partners need to contribute NOW (SAP, iMinds, DT), the > others can deliver later if they wish according to Juan. > > oI see a *dilemma* that e.g. for usage scenario 1 and 2, wave 1 > partners need to deliver with wave 2 partners so how to ensure that > they fit together. > > oTo solve this dilemma, the *wave 1 partners must write useful (!) > section NOW* and contact your wave2 co-authors NOW to align/agree that > your wave 1 contribution works together with their wave 2 > contributions. I will also try to ensure this -- but I will leave in 2 > weeks so I recommend to organize this between you also to be on the > safe side here. Please signal if you have difficulties here, so that I > can try to help. > > oWave 1 authors will deliver until deadline (28.4.) and the parts are > delivered to TID as "internal deliverable" to get a small contribution > certificate that we have delivered. > > ?*@ALL OTHERS:*** > > ** > > oPlease contact your wave 1 co-authors on your own align/agree with > your co-authors NOW that your wave 2 contribution works together with > the wave 1 contributions. I will also try to ensure this -- but I will > leave in 2 weeks so I recommend to organize this between you also to > be on the safe side here. Please signal if you have difficulties here, > so that I can try to help. > > Orga Telco possible: If many wish, we can organize a telco /tomorrow/ > on this topic to make sure that no questions remain. Please signal > your interest... > > Best wishes > > Markus > > --------- > > Hi Markus > > The 28^th is Ok for me > > Best > > Juan > > *Juan Bare?o* > > Research & Innovation > > Account Executive European Union Institutions-Iberia > > T. +34 912 148 859 > > M. +34 625 598 216 > > juan.bareno at atos.net > > Albarrac?n, 25 > > 28037 Madrid - Spain > > atos.net > > cid:image002.png at 01CF21D2.D8BA98F0 > > *From:*Heller, Markus [mailto:markus.heller at sap.com] > *Sent:* Monday, April 14, 2014 3:38 PM > *To:* Bareno Guerenabarrena, Juan > *Subject:* RE: WP11 Tasks for partners leaving on M36 > > Hi Juan, > > What is the deadline date for the Exploitation Plan and for the Market > analysis to be delivered to you, I have not found a given deadline > below, sorry? > > I guess you do not need to carry out checks but just more or less, if > the format etc appropriate, collect our plan and check it and then > together with TID issue the "internal deliverable certificate" then > for this contribution. > > So would a deadline Monday 28.04. ok you? > > Best > > Markus > > *From:*Bareno Guerenabarrena, Juan [mailto:juan.bareno at atos.net] > *Sent:* Dienstag, 8. April 2014 20:09 > *To:* fiware-exploitation at lists.fi-ware.eu > ; > fiware-wpl at lists.fi-ware.eu ; > Heller, Markus; Amon, Peter (p.amon at siemens.com > ); Bettina.Lehmann at telekom.de > ; Hans.Einsiedler at telekom.de > ; Banniza, Thomas-Rolf (Thomas-Rolf > (thomas-rolf.banniza at alcatel-lucent.com > ); Wuenstel, Klaus > (Klaus (klaus.wuenstel at alcatel-lucent.com > ); Seidl, Robert (NSN - > DE/Munich (robert.seidl at nsn.com ); > koen.casier at intec.ugent.be > *Cc:* lindsay.frost at neclab.eu ; > De-Lama Sanchez, Nuria; mcp at tid.es > *Subject:* WP11 Tasks for partners leaving on M36 > > Dear Colleagues > > I need your *contributions to WP11 deliverables before you leave the > project on M36.* My colleague Lindsay Frost from NEC, in cc, should > demand your contributions for standardization deliverable. > > Basically I need the following: > > ?*Individual exploitation plans, from the partners in the list below*, > following the instructions defined in each individual partner profile, > see *Annex 1- D11.2.3 attached. * > > ?All the individual exploitation plans should be described in the > *Annex 1 of the D11.2.3* > > ?Just additional/significative info that should be consider as > confidential could be delivered in a confidential basis to Arian > (Arian.ZWEGERS at ec.europa.eu ) > > ?We will make a follow-up in the next WPL meetings > > cid:image005.jpg at 01CF57F7.E6EEEBF0 > > cid:image006.jpg at 01CF57F7.E6EEEBF0 > > ?*WP3 contribution*, as SAP leads it, regarding D11.1.3- Apps - Market > Analysis (state of art, competitors, similar solutions in the market, > potential added value, potential business models...) and D11.2.3- FI > WARE Apps building block Exploitation (added value, business model > selected, FI-Lab modus operandi.....)-*SEE Initial draft TOCs attached > and add or provide reference documents to complete* > > ?Please *take into account the following recommendations for the next > review*, some contribution (reference text, studies, references...) > for the following recommendations for the review, will be very welcome > and appreciated: > > *D11.1.3- Market Analysis* > > ?Analysis of last review recommendations analysis > > ?Continue to analyze ICT Market situation in relation with GEs > > ?The *exploitation of FI technologies in the three main market sectors > of Smart Cities, Smart Business, and Smart Home needs to be deepened* > > ?The *perspectives of the demand side*are comparatively lacking even > for the main verticals identified, e.g. business related services and > manufacturing > > ?The policy and regulatory analysis in relation to the specific themes > (Data protection, Cloud Computing, FI-LAB modus operandi) > > *D11.2.3- Exploitation Plan* > > ?*FI-LAB Modus Operandi*, Financing and Business model definition is > needed and even how this vehicle is to be created in the first > instance is totally opaque and uncertain. > > ?To define the extent of *collaboration with the EIT ICT lab* > > ?The potential policy issues and impact on the specific exploitation > activities of FI-WARE partners and the *evolution of the FI LAB should > be more specifically*identified and described > > ?At a detailed level, the document is less concrete in the examples > and scenario descriptions provided *in the Apps market sections*. Some > statements might be (even) more convincing if backed up by survey > results; e.g. the business opportunity of the M2M market > > ?*Individual exploitation plans, from the partners in the list below*, > following the instructions defined in each individual partner profile, > see *Annex 1- D11.2.3 attached.* > > *D11.4.3- Standardization* > > ?A Standardization Global Picture is required, as an effective means > to enable market uptake of FI WARE results > > *Juan Bare?o* > > Research & Innovation > > Account Executive European Union Institutions-Iberia > > T. +34 912 148 859 > > M. +34 625 598 216 > > juan.bareno at atos.net > > Albarrac?n, 25 > > 28037 Madrid - Spain > > atos.net > > cid:image007.jpg at 01CF57F7.E6EEEBF0 > -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/png Size: 18991 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/png Size: 4687 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/jpeg Size: 9354 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/jpeg Size: 3257 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/jpeg Size: 4657 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D11.1.3-Market and Competition Analysis _M36v3 - SAP 3_vIMINDS.doc Type: application/msword Size: 6471680 bytes Desc: not available URL: From markus.heller at sap.com Fri Apr 25 09:05:50 2014 From: markus.heller at sap.com (Heller, Markus) Date: Fri, 25 Apr 2014 07:05:50 +0000 Subject: [Fiware-apps] MArket In-Reply-To: <53598011.6090207@intec.ugent.be> References: <393554EDCF801348BC53C7813C6CB73B1AD31711@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD31A45@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD31B53@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD31F83@DEWDFEMB14A.global.corp.sap> <53598011.6090207@intec.ugent.be> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD32C58@DEWDFEMB14A.global.corp.sap> Hi Koen, Thank you for this version, I also leave the WP3 list in CC since the discussion is interesting for all of us w.r.t Market Study Contributions. You have basically two open items: Market Overview/TopPlayers and Vertical Markets to write and I comment here on your input so far: 2) Vertical Markets: Currently you have no input there as I see, right? You need to add it then, its open. Can you please "really" mention some vertical markets (2-3) that you will/can address and stay not fuzzy here (--> I am not good in market analysis writing myself :) I cannot help here much, so if you can, do it please) So just mention some markets (like automotive, etc) where your technology will be directly or indirectly offered to or by which customer segments you plan that they use your stuff ultimately. For example, the customer segments from iMinds might be useful, if it fits? Additionally (not instead of, if possible) please write a few concrete examples here. My idea is that a reader can see how really you results from FI-WARE are going directly or -indirectly into something useful for customers that you address ("the BPM extensions are used by company CY and the editor is integrated into our release 10 in 2092, customer xy asked for this and we adapt). If not possible, describe "concept exploitation" like "we learned in FI-WARE XY and we applied this in designing product XY that we offer to client xy and they use it for or plan to use it for...) 1) Market Overview: First: I am not expert in such Market Studys and we all try to get along tgo produce something "similar" instead more or less IMHO which hopefully does the job....So kindly please take my comments into this context :) This what you wrote is ok as a starter describing a context w.r.t. important State-of-the-art work, but you might need to add something besides this: I miss (maybe I am wrong) a _clear_ visibility and more isolated discussion of company names of important players, market shares of them (ideally), competition analysis, real product names (if there, please highlight them or prepend "product:" or so to the name) and license info - how they sell their products. If possible, a critical paragraph on how you judge their standing or their market approach on your own and slightly compared to your own approach maybe (reminds me to the "competitive statement" we once wrote, maybe you can reuse this here, too..) ? I think, you have written about a few products (YELLOW) this already in the text below: You have some companies and products, if I understand right. I mark them in YELLOW? You can shape this and make it more the primary concern in your text ? You might move the "technologies" or "methods" (RED) (maybe some of my red markings are products then I am wrong for these but you can get my point) a little to the background (is "Collaborative business modelling (CBM)" such)? By doing so you clearly isolate the PRODUCTS (YELLOW) then. Would that be feasible what I write? The technologies-related texts can stay in the text but they are IMHO less interesting than markets, companiesm, products, license models IMHO. ? What you currently do not have IMHO is a discussion of companies and license models for the products you discuss in the text. Info on that would be useful. --> Summary: "More YELLOW-like Stuff" and separate YELLOW from RED stuff would be highly welcome:) As an idea, you can/should e.g. simply write it more like a "top 3" of them down into a bullet list and discuss then each of these bullets for each listed player in this bullet(company a has products X,Y with pay-per-use licsense, company b, company) , e.g. (this "top 3 list" is my own idea, but it helps in getting us into direction that we talk about companies and markets (the topic to write about) and not only technologies or state-of-the-art of techniques, methods, standards or alike. Again, you can leave this text and add to it or reshape it, but need to add something about players (companies), product names, licenses or alike - like a business analyst more or less, at least the fundament so to say. Best Markus --- Your Market Overview text here was: "Existing approaches for business modeling * Osterwalder Business Canvas: The business canvas is a flattened business modeling approach focusing on the interaction of one business offering (called value offering) with potential customers, financing, suppliers, cooperation and competition. It is a strictly descriptive format and limited to a one player one offering setting. Basically the approach works with a paper based canvas to be used in an interactive setting, for which various alternatives exist including software applications. Based on our view of the market, no web based application for this canvas exist, neither does any extension to this canvas allow for quantification. * E3-value is an implementation of fairly detailed business modeling approach linking roles to each other by means of ports in which exchanges of value to product or services are made. The application can be tested free of charge from the site. The e3-value is a standalone java graphical user interface. It provides a very technical approach with a very steep learning curve, which is however still limited in quantification possibilities. As such it misses an intuitive and interactive business modeling approach as well as the very detailed cost and revenue modeling. It misses revenue and pricing modeling as well as full value net simulation. * Moby presents a very fine grained description language which allows to describe the links between different roles with many details on the type, kind and source of role (e.g. financial, resource, process, etc.), but with limited to no information on the costs and revenues. Actual details for quantification are limited to fixed numbers and not functional links to either goals, models, drivers or time-dependent values. * The Business model wizard (BMW) allows for the creating of a business model by configuring 25 elements using an online form. The result is a business model that can be analysed and compared to the business models of existing organisations. While this is an easy to use approach, it focuses on one organisation and is constrained by the 25 elements that are part of the model. * The Collaborative business modelling (CBM) approach, which uses the Business Model Canvas by placing post-it notes on the canvas, generating a number of business models. After this is done, the business models are prioritised on the dimensions of attractiveness and effort. The models that are most attractive and take least effort are the ones that get most attention in the validation phase. * SIMBU : business modeling approach which precedes the BEMES approach. This is used as basis for the development of the business modeling approach. As such SIMBU is an asset and not a competitive force. The following table gives a comparison of the different business modeling approaches in terms of functionality, expressiveness and quantification possibilities: BEMES e3 value Moby BMW BMC CBM Value Proposition +/- - - + + - + + + + Multiple Actors + + + + + / - - - - - - - Flexible Relations + + + + + + - - - - - - Value Net Completeness + + + + + - - - - - - Value Net Simulation + + - - + / - + / - - - - - Ease of Use + - - - - + + + + + Intuitivism + - - - - + + + + Clearly BEMES business modeler differentiates to the existing offerings on the market by providing an expressive business modeling language in an intuitive interactive setting. The link to business calculator providing input for detailed time-dependent long term cost and revenue quantification is the second main differentiator. Existing approaches for cost and revenue modeling and estimation * Business Process Modeling Notation is an approach focused on modeling operational processes by means of a flowchart based approach. Considering the vast realm of tools linking to this modeling format, the extensive set of modeling elements and the strong standard on this, we have built our tool to model and calculate using (a subset of) this format. Additionally the linked and standardized XML Process Description Language is used in reading and storing these models, allowing the exchange with other parties. The open standard allows to freely build upon this and use and interact with other tools. * Activity Based Costing is a quantification approach building on top of a flowchart based modeling approach (e.g. BPMN). This is thoroughly described in literature and our quantification approach for the BPMN models has used this ABC as basis for the calculations. * ARIS is a toolkit which is focusing on using operational process descriptions together with asset management and measurements to get a view on the running costs of a company and allocation of the costs to the different activities. Calculation is in fact a smart aggregation of measurements and the tool is focused on documentation and reporting. * MEGA business process modeling is actually the main competitor for ARIS and provides comparable functionality. Clearly BEMES business calculator differentiates to the existing offerings on the market by providing an expressive and extensible set of long term domain specific modeling languages for various types of costs and revenues all working with detailed time dependent inputs and generating equally detailed output estimations over time. The inherently pluggable approach, allowing for both additional domain specific languages, links to existing standards and additional calculators is a second differentiator. Finally the linking to the business modeler, allowing to build large scale interactions and answer higher level quantitative questions is a third very important differentiator (e.g. which price should we ask to get a predefined profit, is the business model profitable for all partners, how will costs increase over time for the full offering, etc.). This last differentiator allows modeling in different levels of detail the interaction between different players, roles and interactions and combining various domain specific languages into one quantifiable business case. " From: koen casier [mailto:koen.casier at intec.ugent.be] Sent: Donnerstag, 24. April 2014 23:20 To: Heller, Markus; Camille Reynders; Alvaro Arranz; JAVIER LUCIO RUIZ-ANDINO; Javier Soriano (jsoriano at fi.upm.es) Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: MArket Hi Markus, all, iMinds is working on this document and a new version can be found in attachment. We will be finalizing this as soon as possible and at least send a new version by tomorrow EOB. We believe that an update in the course of next week might be required though. Would it be possible to have a look at our new additions on pp. 50-52 and check whether this is in line with the bullet list approach suggested in one of the previous mails? All suggestions for additions and corrections are welcome as well of course. best regards, Koen On 4/24/2014 9:35 AM, Heller, Markus wrote: Hi UPM, SAP, iMinds, Can you please send me a reply today how you plan to proceed here and if ok for you. I have received no reply so I do not know (to my knowledge, you all are not in easter holidays, right?) Please note that the deadline for this would be 28.4., please confirm that ok with you. Best Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 15:41 To: Koen Casier (koen.casier at intec.ugent.be); Camille Reynders; Alvaro Arranz; JAVIER LUCIO RUIZ-ANDINO; Javier Soriano (jsoriano at fi.upm.es) Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: MArket Hi UPM, SAP, iMinds, I attach the drafted WORD (V3). Please check, basically the idea as below....adopting SOTA content and updating and tailoring for different target reader (market analyst instead of state of the art). To focus on the most interesting area first, I would think we should put stores/marketplaces analyis and bemes into foreground and move registry/repository into the second, less important line since there a market analysis is less obvious. Best Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 13:49 To: Koen Casier (koen.casier at intec.ugent.be); Camille Reynders; JAVIER DE PEDRO SANCHEZ (jdps at tid.es); Alvaro Arranz; JAVIER LUCIO RUIZ-ANDINO Cc: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: FW: MArket Hi UPM, SAP, iMinds, TID, For the Market study deliverable, we are together in the first "usage scenario" group named "1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID)", that is why I wrote only to the four of us directly: The core idea of how we can structure our text contribution for this deliverable as said before (in the WP3 telco and my mail from yesterday) is to motivate at the beginning re-using/citing from D12.2.2 "Exploitation Plan" storyline of chapter "4.4 Applications Services Ecosystem" that in WP3 there are three building blocks of the infrastructure we provide as WP (Core business framework, composition tools, mediator) and that we have four "usage scenarios" as described there. I have now started to draft an outline of our contributions needed as input. I can send it around later today so that spaces are assigned where you can fill-in your content - if you agree. For our usage scenario Nr.1 we have to describe (a) Market Structure / Top Players and (b) Vertical Markets, I propose this: ? For (a) Market Structure Top Players: I would create a skeleton text that has multiple slots where you then fill in some content, basically each slot with a top 3-5 list & brief discussion of players or products (preferably discuss players first (reason: if we all this the same, it looks more homogenous, but if more useful, then go ahead and discuss products, afterall we are happy for any contents..... You can heavily build on the SOTA content that you wrote before in the Project, so that it is rather consistent naturally. I have copied some content into the template I already sent, but feel free and help yourself. Afterall, just fill your slots... If you do not agree, with this skeleton & slots approach, please mail to all mail receivers so that we can discuss in the team. ? For (b): Vertical markets: Here I see a rather loose list with bullet points, where we collect vertical markets and real examples (examples are important as requested by reviewers). Each one of us provides some, so that the whole list gives the overview where we are active. Markets are briefly described (1-2 sentences) and why they are relevant for us here, example also briefly described. If you do not agree with this bullet list freestyle approach (chosen mainly because we can contribute individually and puzzle it together), please mail to all mail receivers so that we can discuss in the team. OK? Please reply if you agree or not. I will send later today or tomorrow early morning the next WORD with my prefilled text areas (not final, but giving you the slots)... Best Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 09:24 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: MArket Hi all, A Hint that I collected from Juan: For section 3.4.1 "Market Structure" you might consider using your SOTA content that your wrote in previous deliverables and update this in 4.3.1. But please remind, that IMHO you _must_ mention in your text relevant companies and product names and discuss them a bit - not only mentioning some technologies (like XML, BPMN, ...), or let me say so that at least I consider this not enough. To fulfill this, please do not forget to add such as a "top 3-5 list" of players or product in your market area and add a short discussion of these players or product - it must not be too long but IMHO should not be missed since it is the minimum example of a market overview. Best Markus From: Heller, Markus Sent: Dienstag, 22. April 2014 17:42 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: MArket Hi all, Under leadership of Juan Barreno we have to deliver the WP3 part of D.11.1.3: FI-WARE Market and Competition Analysis. D11.1.3 goes hand in hand with the D11.2.3 Exploitation Plan where we also have to contribute. I attach the current WORD draft of the deliverable and explain the approach (attachment): A) Table of Contents: Please check the attached WORD, I have structured our WP3 contributions to D11.1.3 like this: We need to deliver the WP3 part there, where we contribute the complete section 4.3 "Economy of Internet Application". Please check also the COMMENTS and the chapters 4.4ff where I (will be deleted) later copy/pasted possible texts from SOTA, Market Study, or Exploitation Plan deliverables which might be helpful for you (or not). [cid:image001.png at 01CF6065.8D7BFBF0] B) Needed Contributions: ? The sections on "3.4.1 Market Structures" and "3.4.2 Vertical Markets" are requested by Juan and reviewers - and they will be collectively written by us all. ? For this to happen, we will in each subsection simply report along the "usage scenarios" concept that we have introduced in our last D11.2.2 "Exploitation Plan". Reason behind is that this allows this way to have more targeted areas/partial market where we can write about: "These building blocks are described along four key usage scenarios (see D11.2.2 Exploitation Plan). In the following, the analysis is structured according to these key usage scenarios which address different partial markets. 1. Exploring new business models with the Business Framework (@ UPM, SAP, iMinds, TID) 2. Revenue sharing (@TID) 3. Supporting service composition and crowd-sourcing (@ATOS, UPM, EAB, DT) 4. Supporting Interoperability with Mediation (@TI, THALES)" C) Teams/Authors: ? per usage scenario, we contribute in the teams as marked above in the YELLOW marking. D) Deadlines for D11.1.3: ? "Wave 1" - only for M36 leaving partners (SAP, iminds, DT) --> Juan did not set a deadline, so I neded to set one. I set it to 28.April EOB so that we need to deliver this week the contents or on Monday next week. ? "Wave 2" - for all others staying longer --> Juan did not set a deadline E) Your Action Items: ? @SAP, iMinds, DT: Please proceed and contribute your part of the work, please reach out to your coauthors for this to happen. o Only wave 1 partners need to contribute NOW (SAP, iMinds, DT), the others can deliver later if they wish according to Juan. o I see a dilemma that e.g. for usage scenario 1 and 2, wave 1 partners need to deliver with wave 2 partners so how to ensure that they fit together. o To solve this dilemma, the wave 1 partners must write useful (!) section NOW and contact your wave2 co-authors NOW to align/agree that your wave 1 contribution works together with their wave 2 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. o Wave 1 authors will deliver until deadline (28.4.) and the parts are delivered to TID as "internal deliverable" to get a small contribution certificate that we have delivered. ? @ALL OTHERS: o Please contact your wave 1 co-authors on your own align/agree with your co-authors NOW that your wave 2 contribution works together with the wave 1 contributions. I will also try to ensure this - but I will leave in 2 weeks so I recommend to organize this between you also to be on the safe side here. Please signal if you have difficulties here, so that I can try to help. Orga Telco possible: If many wish, we can organize a telco tomorrow on this topic to make sure that no questions remain. Please signal your interest... Best wishes Markus --------- Hi Markus The 28th is Ok for me Best Juan Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image002.png at 01CF21D2.D8BA98F0] From: Heller, Markus [mailto:markus.heller at sap.com] Sent: Monday, April 14, 2014 3:38 PM To: Bareno Guerenabarrena, Juan Subject: RE: WP11 Tasks for partners leaving on M36 Hi Juan, What is the deadline date for the Exploitation Plan and for the Market analysis to be delivered to you, I have not found a given deadline below, sorry? I guess you do not need to carry out checks but just more or less, if the format etc appropriate, collect our plan and check it and then together with TID issue the "internal deliverable certificate" then for this contribution. So would a deadline Monday 28.04. ok you? Best Markus From: Bareno Guerenabarrena, Juan [mailto:juan.bareno at atos.net] Sent: Dienstag, 8. April 2014 20:09 To: fiware-exploitation at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; Heller, Markus; Amon, Peter (p.amon at siemens.com); Bettina.Lehmann at telekom.de; Hans.Einsiedler at telekom.de; Banniza, Thomas-Rolf (Thomas-Rolf (thomas-rolf.banniza at alcatel-lucent.com); Wuenstel, Klaus (Klaus (klaus.wuenstel at alcatel-lucent.com); Seidl, Robert (NSN - DE/Munich (robert.seidl at nsn.com); koen.casier at intec.ugent.be Cc: lindsay.frost at neclab.eu; De-Lama Sanchez, Nuria; mcp at tid.es Subject: WP11 Tasks for partners leaving on M36 Dear Colleagues I need your contributions to WP11 deliverables before you leave the project on M36. My colleague Lindsay Frost from NEC, in cc, should demand your contributions for standardization deliverable. Basically I need the following: ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. ? All the individual exploitation plans should be described in the Annex 1 of the D11.2.3 ? Just additional/significative info that should be consider as confidential could be delivered in a confidential basis to Arian (Arian.ZWEGERS at ec.europa.eu) ? We will make a follow-up in the next WPL meetings [cid:image005.jpg at 01CF57F7.E6EEEBF0] [cid:image006.jpg at 01CF57F7.E6EEEBF0] ? WP3 contribution, as SAP leads it, regarding D11.1.3- Apps - Market Analysis (state of art, competitors, similar solutions in the market, potential added value, potential business models...) and D11.2.3- FI WARE Apps building block Exploitation (added value, business model selected, FI-Lab modus operandi.....)- SEE Initial draft TOCs attached and add or provide reference documents to complete ? Please take into account the following recommendations for the next review, some contribution (reference text, studies, references...) for the following recommendations for the review, will be very welcome and appreciated: D11.1.3- Market Analysis ? Analysis of last review recommendations analysis ? Continue to analyze ICT Market situation in relation with GEs ? The exploitation of FI technologies in the three main market sectors of Smart Cities, Smart Business, and Smart Home needs to be deepened ? The perspectives of the demand side are comparatively lacking even for the main verticals identified, e.g. business related services and manufacturing ? The policy and regulatory analysis in relation to the specific themes (Data protection, Cloud Computing, FI-LAB modus operandi) D11.2.3- Exploitation Plan ? FI-LAB Modus Operandi, Financing and Business model definition is needed and even how this vehicle is to be created in the first instance is totally opaque and uncertain. ? To define the extent of collaboration with the EIT ICT lab ? The potential policy issues and impact on the specific exploitation activities of FI-WARE partners and the evolution of the FI LAB should be more specifically identified and described ? At a detailed level, the document is less concrete in the examples and scenario descriptions provided in the Apps market sections. Some statements might be (even) more convincing if backed up by survey results; e.g. the business opportunity of the M2M market ? Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. D11.4.3- Standardization ? A Standardization Global Picture is required, as an effective means to enable market uptake of FI WARE results Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image007.jpg at 01CF57F7.E6EEEBF0] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 18991 bytes Desc: image001.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.png Type: image/png Size: 4687 bytes Desc: image002.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image003.jpg Type: image/jpeg Size: 9354 bytes Desc: image003.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image004.jpg Type: image/jpeg Size: 3257 bytes Desc: image004.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image005.jpg Type: image/jpeg Size: 4657 bytes Desc: image005.jpg URL: From andreas.klein at sap.com Fri Apr 25 13:25:05 2014 From: andreas.klein at sap.com (Klein, Andreas) Date: Fri, 25 Apr 2014 11:25:05 +0000 Subject: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD323FA@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD318A8@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD323FA@DEWDFEMB14A.global.corp.sap> Message-ID: <556F697ADC3400408FBBCF7C6040979D967E3890@DEWDFEMB15B.global.corp.sap> Hi, we just transferred everything related to OpenSpecs, OpenAPISpecs and the Architecture Deliverable from our private wiki to the public wiki. Thanks again and please double check your documents in the public wiki. Best Andreas From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of Heller, Markus Sent: Donnerstag, 24. April 2014 11:30 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Hi, @ALL: Architecture Deliverable: Ready. Koen, Camille, Andreas Klein have mailed that they are ready (thx). So we from SAP can start with the next steps (copying to public wiki, generate WORD apps contribution for M36 partners). Please mail now otherwise. @ALL: Please mail now ASAP if you want to make updates to Open Specs still today until EOB. Have not received any mails on this from you.... Please object if you need.... Best wishes Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 11:17 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Dear all, I would like to clarify with this mail how we proceed with the Architecture Deliverable and the Open Spec Deliverable for Apps chapter: A) D2.3.3 FI-WARE Architecture: Juanjo has reviewed a WORD generated from private wiki. Torsten Leidig sent it per email to you and each partner has updated their contributions according to JH review until the deadline 22.4 (yesterday). Next steps: 1. Copy content from private wiki into public wiki 2. Generate a WORD based on private wiki and sent to TID. B) D3.1.3 FI-WARE GE Open Specifications: Juanjo advised us to go ahead with no delay and publish. We did not receive a review result with improvement needs or so and all partners do not need to do updates based on his Review. Next step: 1. Copy content from private wiki to public wiki Action Items: @ALL: You as partner have 1 more day and you need to make sure that all your needed updates are completed in the private wiki until tomorrow. --> Deadline: Tomorrow EOB Thursday 24.4 @SAP: To simplify, SAP will carry out the listed next steps towards delivery. We will begin with this on Friday morning (25.4). Best Markus -------------- next part -------------- An HTML attachment was scrubbed... URL: From lucio at tid.es Fri Apr 25 14:59:53 2014 From: lucio at tid.es (JAVIER LUCIO RUIZ-ANDINO) Date: Fri, 25 Apr 2014 12:59:53 +0000 Subject: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications In-Reply-To: <556F697ADC3400408FBBCF7C6040979D967E3890@DEWDFEMB15B.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD318A8@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD323FA@DEWDFEMB14A.global.corp.sap> <556F697ADC3400408FBBCF7C6040979D967E3890@DEWDFEMB15B.global.corp.sap> Message-ID: <47E859DB20D4CD4281639C75E324CD8F93B8D0EB@EX10-MB2-MAD.hi.inet> Dear Andreas: The section ?Use cases?, and its figure ?Consumer buying service theme?, of the Architecture Oveview have not been transferred from the private to the public wiki. It contains some updates of the new functionality of the RSS GE about expenditure management. Best regards, Javier Lucio De: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] En nombre de Klein, Andreas Enviado el: viernes, 25 de abril de 2014 13:25 Para: Heller, Markus; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Asunto: Re: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Hi, we just transferred everything related to OpenSpecs, OpenAPISpecs and the Architecture Deliverable from our private wiki to the public wiki. Thanks again and please double check your documents in the public wiki. Best Andreas From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of Heller, Markus Sent: Donnerstag, 24. April 2014 11:30 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Hi, @ALL: Architecture Deliverable: Ready. Koen, Camille, Andreas Klein have mailed that they are ready (thx). So we from SAP can start with the next steps (copying to public wiki, generate WORD apps contribution for M36 partners). Please mail now otherwise. @ALL: Please mail now ASAP if you want to make updates to Open Specs still today until EOB. Have not received any mails on this from you?. Please object if you need?. Best wishes Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 11:17 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Dear all, I would like to clarify with this mail how we proceed with the Architecture Deliverable and the Open Spec Deliverable for Apps chapter: A) D2.3.3 FI-WARE Architecture: Juanjo has reviewed a WORD generated from private wiki. Torsten Leidig sent it per email to you and each partner has updated their contributions according to JH review until the deadline 22.4 (yesterday). Next steps: 1. Copy content from private wiki into public wiki 2. Generate a WORD based on private wiki and sent to TID. B) D3.1.3 FI-WARE GE Open Specifications: Juanjo advised us to go ahead with no delay and publish. We did not receive a review result with improvement needs or so and all partners do not need to do updates based on his Review. Next step: 1. Copy content from private wiki to public wiki Action Items: @ALL: You as partner have 1 more day and you need to make sure that all your needed updates are completed in the private wiki until tomorrow. --> Deadline: Tomorrow EOB Thursday 24.4 @SAP: To simplify, SAP will carry out the listed next steps towards delivery. We will begin with this on Friday morning (25.4). Best Markus ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From andreas.klein at sap.com Fri Apr 25 15:22:29 2014 From: andreas.klein at sap.com (Klein, Andreas) Date: Fri, 25 Apr 2014 13:22:29 +0000 Subject: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications In-Reply-To: <47E859DB20D4CD4281639C75E324CD8F93B8D0EB@EX10-MB2-MAD.hi.inet> References: <393554EDCF801348BC53C7813C6CB73B1AD318A8@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD323FA@DEWDFEMB14A.global.corp.sap> <556F697ADC3400408FBBCF7C6040979D967E3890@DEWDFEMB15B.global.corp.sap> <47E859DB20D4CD4281639C75E324CD8F93B8D0EB@EX10-MB2-MAD.hi.inet> Message-ID: <556F697ADC3400408FBBCF7C6040979D967E3978@DEWDFEMB15B.global.corp.sap> Hi Javier, how strange, the copy process worked for all images I checked except for the ?Consumer buying service theme? image. Even if I try to update the image in the public wiki by hand I get the error message ?The file is corrupt or has an incorrect extension. Please check the file and upload again.? Can you generate a new version of the image and try to update the image in the public wiki by yourself? Best Andreas From: JAVIER LUCIO RUIZ-ANDINO [mailto:lucio at tid.es] Sent: Freitag, 25. April 2014 15:00 To: Klein, Andreas; Heller, Markus; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Dear Andreas: The section ?Use cases?, and its figure ?Consumer buying service theme?, of the Architecture Oveview have not been transferred from the private to the public wiki. It contains some updates of the new functionality of the RSS GE about expenditure management. Best regards, Javier Lucio De: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] En nombre de Klein, Andreas Enviado el: viernes, 25 de abril de 2014 13:25 Para: Heller, Markus; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Asunto: Re: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Hi, we just transferred everything related to OpenSpecs, OpenAPISpecs and the Architecture Deliverable from our private wiki to the public wiki. Thanks again and please double check your documents in the public wiki. Best Andreas From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of Heller, Markus Sent: Donnerstag, 24. April 2014 11:30 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Hi, @ALL: Architecture Deliverable: Ready. Koen, Camille, Andreas Klein have mailed that they are ready (thx). So we from SAP can start with the next steps (copying to public wiki, generate WORD apps contribution for M36 partners). Please mail now otherwise. @ALL: Please mail now ASAP if you want to make updates to Open Specs still today until EOB. Have not received any mails on this from you?. Please object if you need?. Best wishes Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 11:17 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Dear all, I would like to clarify with this mail how we proceed with the Architecture Deliverable and the Open Spec Deliverable for Apps chapter: A) D2.3.3 FI-WARE Architecture: Juanjo has reviewed a WORD generated from private wiki. Torsten Leidig sent it per email to you and each partner has updated their contributions according to JH review until the deadline 22.4 (yesterday). Next steps: 1. Copy content from private wiki into public wiki 2. Generate a WORD based on private wiki and sent to TID. B) D3.1.3 FI-WARE GE Open Specifications: Juanjo advised us to go ahead with no delay and publish. We did not receive a review result with improvement needs or so and all partners do not need to do updates based on his Review. Next step: 1. Copy content from private wiki to public wiki Action Items: @ALL: You as partner have 1 more day and you need to make sure that all your needed updates are completed in the private wiki until tomorrow. --> Deadline: Tomorrow EOB Thursday 24.4 @SAP: To simplify, SAP will carry out the listed next steps towards delivery. We will begin with this on Friday morning (25.4). Best Markus ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From lucio at tid.es Mon Apr 28 10:02:53 2014 From: lucio at tid.es (JAVIER LUCIO RUIZ-ANDINO) Date: Mon, 28 Apr 2014 08:02:53 +0000 Subject: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications In-Reply-To: <556F697ADC3400408FBBCF7C6040979D967E3978@DEWDFEMB15B.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD318A8@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD323FA@DEWDFEMB14A.global.corp.sap> <556F697ADC3400408FBBCF7C6040979D967E3890@DEWDFEMB15B.global.corp.sap> <47E859DB20D4CD4281639C75E324CD8F93B8D0EB@EX10-MB2-MAD.hi.inet> <556F697ADC3400408FBBCF7C6040979D967E3978@DEWDFEMB15B.global.corp.sap> Message-ID: <47E859DB20D4CD4281639C75E324CD8F97C525CF@EX10-MB1-MAD.hi.inet> Done. Best regards, Javier De: Klein, Andreas [mailto:andreas.klein at sap.com] Enviado el: viernes, 25 de abril de 2014 15:22 Para: JAVIER LUCIO RUIZ-ANDINO CC: Heller, Markus; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Asunto: RE: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Hi Javier, how strange, the copy process worked for all images I checked except for the ?Consumer buying service theme? image. Even if I try to update the image in the public wiki by hand I get the error message ?The file is corrupt or has an incorrect extension. Please check the file and upload again.? Can you generate a new version of the image and try to update the image in the public wiki by yourself? Best Andreas From: JAVIER LUCIO RUIZ-ANDINO [mailto:lucio at tid.es] Sent: Freitag, 25. April 2014 15:00 To: Klein, Andreas; Heller, Markus; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: RE: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Dear Andreas: The section ?Use cases?, and its figure ?Consumer buying service theme?, of the Architecture Oveview have not been transferred from the private to the public wiki. It contains some updates of the new functionality of the RSS GE about expenditure management. Best regards, Javier Lucio De: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] En nombre de Klein, Andreas Enviado el: viernes, 25 de abril de 2014 13:25 Para: Heller, Markus; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Asunto: Re: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Hi, we just transferred everything related to OpenSpecs, OpenAPISpecs and the Architecture Deliverable from our private wiki to the public wiki. Thanks again and please double check your documents in the public wiki. Best Andreas From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of Heller, Markus Sent: Donnerstag, 24. April 2014 11:30 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: [Fiware-apps] Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Hi, @ALL: Architecture Deliverable: Ready. Koen, Camille, Andreas Klein have mailed that they are ready (thx). So we from SAP can start with the next steps (copying to public wiki, generate WORD apps contribution for M36 partners). Please mail now otherwise. @ALL: Please mail now ASAP if you want to make updates to Open Specs still today until EOB. Have not received any mails on this from you?. Please object if you need?. Best wishes Markus From: Heller, Markus Sent: Mittwoch, 23. April 2014 11:17 To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Next steps for delivery of D2.3.3 FI-WARE Architecture and D3.1.3 FI-WARE GE Open Specifications Dear all, I would like to clarify with this mail how we proceed with the Architecture Deliverable and the Open Spec Deliverable for Apps chapter: A) D2.3.3 FI-WARE Architecture: Juanjo has reviewed a WORD generated from private wiki. Torsten Leidig sent it per email to you and each partner has updated their contributions according to JH review until the deadline 22.4 (yesterday). Next steps: 1. Copy content from private wiki into public wiki 2. Generate a WORD based on private wiki and sent to TID. B) D3.1.3 FI-WARE GE Open Specifications: Juanjo advised us to go ahead with no delay and publish. We did not receive a review result with improvement needs or so and all partners do not need to do updates based on his Review. Next step: 1. Copy content from private wiki to public wiki Action Items: @ALL: You as partner have 1 more day and you need to make sure that all your needed updates are completed in the private wiki until tomorrow. --> Deadline: Tomorrow EOB Thursday 24.4 @SAP: To simplify, SAP will carry out the listed next steps towards delivery. We will begin with this on Friday morning (25.4). Best Markus ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Mon Apr 28 15:30:46 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 28 Apr 2014 13:30:46 +0000 Subject: [Fiware-apps] FW: [Fiware-wpl] Package Template Page v2 In-Reply-To: References: Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD353EA@DEWDFEMB14A.global.corp.sap> Hi ATOS, UPM, iMinds, and all, Only for us the workaround recommended from Stefano for all WPs: The early-leavers with packages can fill this WORD template and return to him, so that he collect it for M36 and creates pages later?.Not optimal, but working? For us in WP3, we have our 3 packages packages lead by ATOS, UPM, iMinds? Maybe we can deliver the package templates for all our 3 packages until M36? ? Packages UPM, ATOS: Question: Can you fill these out for the packages ?now? (e.g. this week)? Again, we SAP can help here with this task. For now, we should clarify a date when we deliver this to Stefano and who starts with it. Please reply. ? Package iMinds: You have your own package. You leave at M36 therefore you need to fill this out and return to Stefano ?now? for due date M36. Best Markus From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Montag, 28. April 2014 15:02 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] Package Template Page v2 dear all, as per discussion of this morning, please find attached the Package Template Page v2 which refines the previous version according to the comments received. I consider this version final. The document itself can be considered a msword template only for those organisations leaving the consortium at m36. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 395796 bytes Desc: not available URL: From markus.heller at sap.com Mon Apr 28 16:13:50 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 28 Apr 2014 14:13:50 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD35462@DEWDFEMB14A.global.corp.sap> Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 6914 bytes Desc: not available URL: From markus.heller at sap.com Mon Apr 28 16:15:03 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 28 Apr 2014 14:15:03 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD3548F@DEWDFEMB14A.global.corp.sap> Hi all 28.04.2014: Dear all, tomorrow the new WP3 WPL from ENG Alessandra Toninelli might join, we all would like to welcome her in WP3 Best wishes Markus Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 4846 bytes Desc: not available URL: From markus.heller at sap.com Mon Apr 28 16:16:20 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 28 Apr 2014 14:16:20 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD354DB@DEWDFEMB14A.global.corp.sap> Hi all 28.04.2014: Dear all, tomorrow the new WP3 WPL from ENG Alessandra Toninelli might join, we all would like to welcome her in WP3 Best wishes Markus Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 22554 bytes Desc: not available URL: From markus.heller at sap.com Mon Apr 28 16:16:20 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 28 Apr 2014 14:16:20 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD354D6@DEWDFEMB14A.global.corp.sap> Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 22582 bytes Desc: not available URL: From markus.heller at sap.com Mon Apr 28 16:16:20 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 28 Apr 2014 14:16:20 +0000 Subject: [Fiware-apps] Canceled: FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD354D1@DEWDFEMB14A.global.corp.sap> Hi all 28.04.2014: Dear all, tomorrow the new WP3 WPL from ENG Alessandra Toninelli might join, we all would like to welcome her in WP3 Best wishes Markus Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 4239 bytes Desc: not available URL: From markus.heller at sap.com Mon Apr 28 16:16:19 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 28 Apr 2014 14:16:19 +0000 Subject: [Fiware-apps] Canceled: FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD354CC@DEWDFEMB14A.global.corp.sap> Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 7072 bytes Desc: not available URL: From markus.heller at sap.com Mon Apr 28 20:08:53 2014 From: markus.heller at sap.com (Heller, Markus) Date: Mon, 28 Apr 2014 18:08:53 +0000 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <53551776.1080509@tid.es> References: <53551776.1080509@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> Hi Miguel, for APPS, we have completed the improvements for Release 3.3. (manuals/software) now. Only for the YELLOW rows improvements were needed according to your view for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup with mail exchange to DT/Horst). I have added the comments from the colleagues in the rightmost section... I cannot edit the Google docs (no google docs account). You can now please check them again and approve if Ok. Best Markus R3.3. Release Status GE name Improvement after Miguel Review was needed for Wave 1 (M36) GEi name Last Release Status UTP USER INS Files Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews the other manuals) Comments User & Progs. Comments Inst& Admin Files2 Observations Application Mashup NO ACTION M36 Wirecloud R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Light Semantic Composition Editor NO ACTION M37 COMPEL R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Marketplace NO ACTION M38 Marketplace - SAP RI R3.2 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel Mediator NO Mediator R3.2 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Mediator NO SETHA2 R2 N/A N/A N/A N/A N/A Reviewer: Reviewer: Registry NO Registry - SAP RI R3.3 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel TL Repository NO Repository - SAP RI R2 N/A N/A N/A N/A N/A Reviewer: Revenue Settlement and Sharing System NO Revenue Settlement and Sharing System R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Service Composition NO Ericsson Composition Engine (ECE) R1 N/A N/A N/A N/A N/A Service Mashup NO Mashup Factory R2 N/A N/A N/A N/A N/A Wrong entry on catalogue. No link to Installation manual or user manual on wiki DONE: This AP was clarified per E-Mail with Horst Stein DT and Markus and Miguel.... Store NO WStore R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Business Calculator YES Business Calculator R3.3 Rejected NOK NOK OK OK Reviewer: Miguel Looking better, but one comment was ignored: * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figures are placed to the left, others to the center. - Some figures have text to the right, others below. Please, follow the same scheme for all of them. - Some figures have title, others don't Reviewer: Miguel DONE. 've just resolved all my issues as mentioned in the excel sheet. Koen.22.04.2014 Business Modeler YES Business Modeler R3.3 Rejected OK NOK OK OK Reviewer: Miguel Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figure is left, others are centered - I miss some proportionality of the figures presented some are too big for the content they want to emphasize, other's are small. I'd appreciate some balance Reviewer: Miguel DONE. As far as I can tell I fixed my issues today, I'll double-check tomorrow morning. Camille 22.04.2014 From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Montag, 21. April 2014 15:05 To: Heller, Markus Cc: Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ Subject: WP3 reviewed (just those leaving on M36) Dear Markus, We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 74833 bytes Desc: not available URL: From mcp at tid.es Tue Apr 29 10:06:15 2014 From: mcp at tid.es (Miguel Carrillo) Date: Tue, 29 Apr 2014 10:06:15 +0200 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> Message-ID: <535F5D77.50000@tid.es> Hi Markus, You have an updated review again. There is little actual work left, all can be solved quickly. Note: the google doc is edible by the reviewers only. Best regards, Miguel El 28/04/2014 20:08, Heller, Markus escribi?: Hi Miguel, for APPS, we have completed the improvements for Release 3.3. (manuals/software) now. Only for the YELLOW rows improvements were needed according to your view for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup with mail exchange to DT/Horst). I have added the comments from the colleagues in the rightmost section... I cannot edit the Google docs (no google docs account). You can now please check them again and approve if Ok. Best Markus R3.3. Release Status GE name Improvement after Miguel Review was needed for Wave 1 (M36) GEi name Last Release Status UTP USER INS Files Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews the other manuals) Comments User & Progs. Comments Inst& Admin Files2 Observations Application Mashup NO ACTION M36 Wirecloud R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Light Semantic Composition Editor NO ACTION M37 COMPEL R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Marketplace NO ACTION M38 Marketplace - SAP RI R3.2 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel Mediator NO Mediator R3.2 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Mediator NO SETHA2 R2 N/A N/A N/A N/A N/A Reviewer: Reviewer: Registry NO Registry - SAP RI R3.3 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel TL Repository NO Repository - SAP RI R2 N/A N/A N/A N/A N/A Reviewer: Revenue Settlement and Sharing System NO Revenue Settlement and Sharing System R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Service Composition NO Ericsson Composition Engine (ECE) R1 N/A N/A N/A N/A N/A Service Mashup NO Mashup Factory R2 N/A N/A N/A N/A N/A Wrong entry on catalogue. No link to Installation manual or user manual on wiki DONE: This AP was clarified per E-Mail with Horst Stein DT and Markus and Miguel.... Store NO WStore R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Business Calculator YES Business Calculator R3.3 Rejected NOK NOK OK OK Reviewer: Miguel Looking better, but one comment was ignored: * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figures are placed to the left, others to the center. - Some figures have text to the right, others below. Please, follow the same scheme for all of them. - Some figures have title, others don't Reviewer: Miguel DONE. 've just resolved all my issues as mentioned in the excel sheet. Koen.22.04.2014 Business Modeler YES Business Modeler R3.3 Rejected OK NOK OK OK Reviewer: Miguel Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figure is left, others are centered - I miss some proportionality of the figures presented some are too big for the content they want to emphasize, other's are small. I'd appreciate some balance Reviewer: Miguel DONE. As far as I can tell I fixed my issues today, I'll double-check tomorrow morning. Camille 22.04.2014 From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Montag, 21. April 2014 15:05 To: Heller, Markus Cc: Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ Subject: WP3 reviewed (just those leaving on M36) Dear Markus, We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From mcp at tid.es Tue Apr 29 10:11:42 2014 From: mcp at tid.es (Miguel Carrillo) Date: Tue, 29 Apr 2014 10:11:42 +0200 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <535F5D77.50000@tid.es> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> Message-ID: <535F5EBE.9060102@tid.es> editable, I mean - whether this is "edible" or not, this is open to subjective perceptions! El 29/04/2014 10:06, Miguel Carrillo escribi?: Hi Markus, You have an updated review again. There is little actual work left, all can be solved quickly. Note: the google doc is edible by the reviewers only. Best regards, Miguel El 28/04/2014 20:08, Heller, Markus escribi?: Hi Miguel, for APPS, we have completed the improvements for Release 3.3. (manuals/software) now. Only for the YELLOW rows improvements were needed according to your view for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup with mail exchange to DT/Horst). I have added the comments from the colleagues in the rightmost section... I cannot edit the Google docs (no google docs account). You can now please check them again and approve if Ok. Best Markus R3.3. Release Status GE name Improvement after Miguel Review was needed for Wave 1 (M36) GEi name Last Release Status UTP USER INS Files Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews the other manuals) Comments User & Progs. Comments Inst& Admin Files2 Observations Application Mashup NO ACTION M36 Wirecloud R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Light Semantic Composition Editor NO ACTION M37 COMPEL R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Marketplace NO ACTION M38 Marketplace - SAP RI R3.2 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel Mediator NO Mediator R3.2 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Mediator NO SETHA2 R2 N/A N/A N/A N/A N/A Reviewer: Reviewer: Registry NO Registry - SAP RI R3.3 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel TL Repository NO Repository - SAP RI R2 N/A N/A N/A N/A N/A Reviewer: Revenue Settlement and Sharing System NO Revenue Settlement and Sharing System R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Service Composition NO Ericsson Composition Engine (ECE) R1 N/A N/A N/A N/A N/A Service Mashup NO Mashup Factory R2 N/A N/A N/A N/A N/A Wrong entry on catalogue. No link to Installation manual or user manual on wiki DONE: This AP was clarified per E-Mail with Horst Stein DT and Markus and Miguel.... Store NO WStore R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Business Calculator YES Business Calculator R3.3 Rejected NOK NOK OK OK Reviewer: Miguel Looking better, but one comment was ignored: * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figures are placed to the left, others to the center. - Some figures have text to the right, others below. Please, follow the same scheme for all of them. - Some figures have title, others don't Reviewer: Miguel DONE. 've just resolved all my issues as mentioned in the excel sheet. Koen.22.04.2014 Business Modeler YES Business Modeler R3.3 Rejected OK NOK OK OK Reviewer: Miguel Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figure is left, others are centered - I miss some proportionality of the figures presented some are too big for the content they want to emphasize, other's are small. I'd appreciate some balance Reviewer: Miguel DONE. As far as I can tell I fixed my issues today, I'll double-check tomorrow morning. Camille 22.04.2014 From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Montag, 21. April 2014 15:05 To: Heller, Markus Cc: Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ Subject: WP3 reviewed (just those leaving on M36) Dear Markus, We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-apps mailing list Fiware-apps at lists.fi-ware.org https://lists.fi-ware.org/listinfo/fiware-apps -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Tue Apr 29 10:15:22 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 29 Apr 2014 08:15:22 +0000 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <535F5D77.50000@tid.es> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD35AFE@DEWDFEMB14A.global.corp.sap> Hi WP3 We received the review of our submission from yesterday (record time once again, Miguel, thank you !). Only remarks for iMinds now. @iMinds: Please correct today and mail to me that its done. I can then report to Miguel again. Best Markus The updated table is here, Miguel has replaced the old entry fields with his new comment: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 [cid:image001.png at 01CF6393.EDF5B940] From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Dienstag, 29. April 2014 10:06 To: Heller, Markus Cc: MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: WP3 reviewed (just those leaving on M36) Hi Markus, You have an updated review again. There is little actual work left, all can be solved quickly. Note: the google doc is edible by the reviewers only. Best regards, Miguel El 28/04/2014 20:08, Heller, Markus escribi?: Hi Miguel, for APPS, we have completed the improvements for Release 3.3. (manuals/software) now. Only for the YELLOW rows improvements were needed according to your view for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup with mail exchange to DT/Horst). I have added the comments from the colleagues in the rightmost section... I cannot edit the Google docs (no google docs account). You can now please check them again and approve if Ok. Best Markus R3.3. Release Status GE name Improvement after Miguel Review was needed for Wave 1 (M36) GEi name Last Release Status UTP USER INS Files Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews the other manuals) Comments User & Progs. Comments Inst& Admin Files2 Observations Application Mashup NO ACTION M36 Wirecloud R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Light Semantic Composition Editor NO ACTION M37 COMPEL R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Marketplace NO ACTION M38 Marketplace - SAP RI R3.2 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel Mediator NO Mediator R3.2 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Mediator NO SETHA2 R2 N/A N/A N/A N/A N/A Reviewer: Reviewer: Registry NO Registry - SAP RI R3.3 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel TL Repository NO Repository - SAP RI R2 N/A N/A N/A N/A N/A Reviewer: Revenue Settlement and Sharing System NO Revenue Settlement and Sharing System R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Service Composition NO Ericsson Composition Engine (ECE) R1 N/A N/A N/A N/A N/A Service Mashup NO Mashup Factory R2 N/A N/A N/A N/A N/A Wrong entry on catalogue. No link to Installation manual or user manual on wiki DONE: This AP was clarified per E-Mail with Horst Stein DT and Markus and Miguel.... Store NO WStore R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Business Calculator YES Business Calculator R3.3 Rejected NOK NOK OK OK Reviewer: Miguel Looking better, but one comment was ignored: * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figures are placed to the left, others to the center. - Some figures have text to the right, others below. Please, follow the same scheme for all of them. - Some figures have title, others don't Reviewer: Miguel DONE. 've just resolved all my issues as mentioned in the excel sheet. Koen.22.04.2014 Business Modeler YES Business Modeler R3.3 Rejected OK NOK OK OK Reviewer: Miguel Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figure is left, others are centered - I miss some proportionality of the figures presented some are too big for the content they want to emphasize, other's are small. I'd appreciate some balance Reviewer: Miguel DONE. As far as I can tell I fixed my issues today, I'll double-check tomorrow morning. Camille 22.04.2014 From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Montag, 21. April 2014 15:05 To: Heller, Markus Cc: Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ Subject: WP3 reviewed (just those leaving on M36) Dear Markus, We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 113512 bytes Desc: not available URL: From camille.reynders at iminds.be Tue Apr 29 10:33:36 2014 From: camille.reynders at iminds.be (Camille Reynders) Date: Tue, 29 Apr 2014 10:33:36 +0200 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD35AFE@DEWDFEMB14A.global.corp.sap> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD35AFE@DEWDFEMB14A.global.corp.sap> Message-ID: Hi Markus, The Business Modeler user and programmer guide should be fixed now. *Camille Reynders* Living Labs, Prototyping *iMinds vzw | Gaston Crommenlaan 8 box 102 | 9050 Ghent | Belgium | www.iminds.be * *T: | F: +32 9 331 48 05 | M: * On Tue, Apr 29, 2014 at 10:15 AM, Heller, Markus wrote: > Hi WP3 > > > > We received the review of our submission from yesterday (record time once > again, Miguel, thank you !). Only remarks for iMinds now. > > > > @*iMinds*: Please correct today and mail to me that its done. I can then > report to Miguel again. > > > > Best > > Markus > > > > > > The updated table is here, Miguel has replaced the old entry fields with > his new comment: > https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 > > > > > > > > > > > > > > *From:* Miguel Carrillo [mailto:mcp at tid.es] > *Sent:* Dienstag, 29. April 2014 10:06 > *To:* Heller, Markus > *Cc:* MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps ( > fiware-apps at lists.fi-ware.org) > *Subject:* Re: WP3 reviewed (just those leaving on M36) > > > > Hi Markus, > > You have an updated review again. There is little actual work left, all > can be solved quickly. > > Note: the google doc is edible by the reviewers only. > > Best regards, > > Miguel > > El 28/04/2014 20:08, Heller, Markus escribi?: > > Hi Miguel, > > > > for APPS, we have completed the improvements for Release 3.3. > (manuals/software) now. > > Only for the YELLOW rows improvements were needed according to your view > for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup > with mail exchange to DT/Horst). > > > > I have added the comments from the colleagues in the rightmost section... I > cannot edit the Google docs (no google docs account). > > > > You can now please check them again and approve if Ok. > > > > Best > > Markus > > > > R3.3. Release Status > > *GE name* > > *Improvement after Miguel Review was needed for Wave 1 (M36)* > > *GEi name* > > *Last Release* > > *Status* > > *UTP* > > *USER* > > *INS* > > *Files* > > *Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews > the other manuals)* > > *Comments User & Progs.* > > *Comments Inst& Admin* > > *Files2* > > *Observations* > > Application Mashup > > NO ACTION M36 > > Wirecloud > > R3.3 > > Awaiting review > > Pending > > Pending > > Pending > > Pending > > Reviewer: > > Reviewer: > > Reviewer: > > Light Semantic Composition Editor > > NO ACTION M37 > > COMPEL > > R3.3 > > Awaiting review > > Pending > > Pending > > Pending > > Pending > > Reviewer: > > Reviewer: > > Reviewer: > > Marketplace > > NO ACTION M38 > > Marketplace - SAP RI > > R3.2 > > Accepted > > OK > > OK > > OK > > OK > > Reviewer: Miguel > > Reviewer: Manuel > > Reviewer: Miguel > > Mediator > > NO > > Mediator > > R3.2 > > Awaiting review > > Pending > > Pending > > Pending > > Pending > > Reviewer: > > Reviewer: > > Reviewer: > > Mediator > > NO > > SETHA2 > > R2 > > N/A > > N/A > > N/A > > N/A > > N/A > > Reviewer: > > Reviewer: > > Registry > > NO > > Registry - SAP RI > > R3.3 > > Accepted > > OK > > OK > > OK > > OK > > Reviewer: Miguel > > Reviewer: Manuel > > Reviewer: Miguel > > TL > > Repository > > NO > > Repository - SAP RI > > R2 > > N/A > > N/A > > N/A > > N/A > > N/A > > Reviewer: > > Revenue Settlement and Sharing System > > NO > > Revenue Settlement and Sharing System > > R3.3 > > Awaiting review > > Pending > > Pending > > Pending > > Pending > > Reviewer: > > Reviewer: > > Reviewer: > > Service Composition > > NO > > Ericsson Composition Engine (ECE) > > R1 > > N/A > > N/A > > N/A > > N/A > > N/A > > Service Mashup > > NO > > Mashup Factory > > R2 > > N/A > > N/A > > N/A > > N/A > > N/A > > Wrong entry on catalogue. No link to Installation manual or user manual on > wiki > > DONE: > > This AP was clarified per E-Mail with Horst Stein DT and Markus and > Miguel.... > > Store > > NO > > WStore > > R3.3 > > Awaiting review > > Pending > > Pending > > Pending > > Pending > > Reviewer: > > Reviewer: > > Reviewer: > > Business Calculator > > YES > > Business Calculator > > R3.3 > > Rejected > > NOK > > NOK > > OK > > OK > > Reviewer: Miguel > Looking better, but one comment was ignored: > * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration > > Reviewer: Manuel > Please, set up the Introduction section by following the example of the > Registry: > https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 > - Some figures are placed to the left, others to the center. > - Some figures have text to the right, others below. Please, follow the > same scheme for all of them. > - Some figures have title, others don't > > Reviewer: Miguel > > DONE. > > 've just resolved all my issues as mentioned in the excel sheet. > Koen.22.04.2014 > > Business Modeler > > YES > > Business Modeler > > R3.3 > > Rejected > > OK > > NOK > > OK > > OK > > Reviewer: Miguel > > Reviewer: Manuel > Please, set up the Introduction section by following the example of the > Registry: > > https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 > - Some figure is left, others are centered > - I miss some proportionality of the figures presented some are too big > for the content they want to emphasize, other's are small. I'd appreciate > some balance > > Reviewer: Miguel > > DONE. > > As far as I can tell I fixed my issues today, I'll double-check tomorrow > morning. Camille 22.04.2014 > > > > > > > > > > > > > > > > *From:* Miguel Carrillo [mailto:mcp at tid.es ] > *Sent:* Montag, 21. April 2014 15:05 > *To:* Heller, Markus > *Cc:* Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; > FERMIN GALAN MARQUEZ > *Subject:* WP3 reviewed (just those leaving on M36) > > > > Dear Markus, > > We are prioritising those leaving at the end of the month. This message > applies strictly to those marked in grey (if they are not exactly those > partners departing on M36 let us know) > > The other day I announced that part of the manuals are ready. Now we have > them all reviewed. Please distribute to your teams. > > - > https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 > > Also, note the observation I added to the Service Mashup (last delivery in > R2). They seem to need changes in the catalogue > > Best regards, > > Miguel > > -- > > ---------------------------------------------------------------------- > > _/ _/_/ Miguel Carrillo Pacheco > > _/ _/ _/ _/ Telef?nica Distrito Telef?nica > > _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 > > _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N > > _/ _/_/ 28050 Madrid (Spain) > > Tel: (+34) 91 483 26 77 > > > > e-mail: mcp at tid.es > > > > Follow FI-WARE on the net > > > > Website: http://www.fi-ware.org > > Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 > > Twitter: http://twitter.com/Fiware > > LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 > > ---------------------------------------------------------------------- > > > ------------------------------ > > > Este mensaje se dirige exclusivamente a su destinatario. Puede consultar > nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace > situado m?s abajo. > This message is intended exclusively for its addressee. We only send and > receive email on the basis of the terms set out at: > http://www.tid.es/ES/PAGINAS/disclaimer.aspx > > > > -- > > ---------------------------------------------------------------------- > > _/ _/_/ Miguel Carrillo Pacheco > > _/ _/ _/ _/ Telef?nica Distrito Telef?nica > > _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 > > _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N > > _/ _/_/ 28050 Madrid (Spain) > > Tel: (+34) 91 483 26 77 > > > > e-mail: mcp at tid.es > > > > Follow FI-WARE on the net > > > > Website: http://www.fi-ware.org > > Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 > > Twitter: http://twitter.com/Fiware > > LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 > > ---------------------------------------------------------------------- > > > ------------------------------ > > > Este mensaje se dirige exclusivamente a su destinatario. Puede consultar > nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace > situado m?s abajo. > This message is intended exclusively for its addressee. We only send and > receive email on the basis of the terms set out at: > http://www.tid.es/ES/PAGINAS/disclaimer.aspx > -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 29382 bytes Desc: not available URL: From daniel.gidoin at thalesgroup.com Tue Apr 29 10:47:20 2014 From: daniel.gidoin at thalesgroup.com (GIDOIN Daniel) Date: Tue, 29 Apr 2014 10:47:20 +0200 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD35AFE@DEWDFEMB14A.global.corp.sap> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD35AFE@DEWDFEMB14A.global.corp.sap> Message-ID: <7848_1398761244_535F671C_7848_1104_1_8F1D40232A0E68409E3FC23A30C326620169C29330C9@THSONEA01CMS04P.one.grp> We have engaged the test of the ? Business calculator". We are waiting any additional information from Koen, required to test it. Best regards Daniel De : fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] De la part de Heller, Markus Envoy? : mardi 29 avril 2014 10:15 ? : Koen Casier (koen.casier at intec.ugent.be); Camille Reynders; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Objet : Re: [Fiware-apps] WP3 reviewed (just those leaving on M36) Hi WP3 We received the review of our submission from yesterday (record time once again, Miguel, thank you !). Only remarks for iMinds now. @iMinds: Please correct today and mail to me that its done. I can then report to Miguel again. Best Markus The updated table is here, Miguel has replaced the old entry fields with his new comment: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 [cid:image001.png at 01CF6398.4F110CD0] From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Dienstag, 29. April 2014 10:06 To: Heller, Markus Cc: MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: WP3 reviewed (just those leaving on M36) Hi Markus, You have an updated review again. There is little actual work left, all can be solved quickly. Note: the google doc is edible by the reviewers only. Best regards, Miguel El 28/04/2014 20:08, Heller, Markus escribi?: Hi Miguel, for APPS, we have completed the improvements for Release 3.3. (manuals/software) now. Only for the YELLOW rows improvements were needed according to your view for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup with mail exchange to DT/Horst). I have added the comments from the colleagues in the rightmost section... I cannot edit the Google docs (no google docs account). You can now please check them again and approve if Ok. Best Markus R3.3. Release Status GE name Improvement after Miguel Review was needed for Wave 1 (M36) GEi name Last Release Status UTP USER INS Files Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews the other manuals) Comments User & Progs. Comments Inst& Admin Files2 Observations Application Mashup NO ACTION M36 Wirecloud R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Light Semantic Composition Editor NO ACTION M37 COMPEL R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Marketplace NO ACTION M38 Marketplace - SAP RI R3.2 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel Mediator NO Mediator R3.2 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Mediator NO SETHA2 R2 N/A N/A N/A N/A N/A Reviewer: Reviewer: Registry NO Registry - SAP RI R3.3 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel TL Repository NO Repository - SAP RI R2 N/A N/A N/A N/A N/A Reviewer: Revenue Settlement and Sharing System NO Revenue Settlement and Sharing System R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Service Composition NO Ericsson Composition Engine (ECE) R1 N/A N/A N/A N/A N/A Service Mashup NO Mashup Factory R2 N/A N/A N/A N/A N/A Wrong entry on catalogue. No link to Installation manual or user manual on wiki DONE: This AP was clarified per E-Mail with Horst Stein DT and Markus and Miguel.... Store NO WStore R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Business Calculator YES Business Calculator R3.3 Rejected NOK NOK OK OK Reviewer: Miguel Looking better, but one comment was ignored: * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figures are placed to the left, others to the center. - Some figures have text to the right, others below. Please, follow the same scheme for all of them. - Some figures have title, others don't Reviewer: Miguel DONE. 've just resolved all my issues as mentioned in the excel sheet. Koen.22.04.2014 Business Modeler YES Business Modeler R3.3 Rejected OK NOK OK OK Reviewer: Miguel Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figure is left, others are centered - I miss some proportionality of the figures presented some are too big for the content they want to emphasize, other's are small. I'd appreciate some balance Reviewer: Miguel DONE. As far as I can tell I fixed my issues today, I'll double-check tomorrow morning. Camille 22.04.2014 From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Montag, 21. April 2014 15:05 To: Heller, Markus Cc: Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ Subject: WP3 reviewed (just those leaving on M36) Dear Markus, We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 29382 bytes Desc: image001.png URL: From koen.casier at intec.ugent.be Tue Apr 29 13:45:46 2014 From: koen.casier at intec.ugent.be (koen casier) Date: Tue, 29 Apr 2014 13:45:46 +0200 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD35AFE@DEWDFEMB14A.global.corp.sap> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD35AFE@DEWDFEMB14A.global.corp.sap> Message-ID: <535F90EA.9070305@intec.ugent.be> Hi Markus, Thanks for informing us of these issues. However, the feature to which Miguel is referring has been dismissed in the backlog. I think it is a strange thing to detail the test procedure for a dismissed item of the backlog. As such I have no idea how to solve this issue? best regards, Koen On 4/29/2014 10:15 AM, Heller, Markus wrote: > > Hi WP3 > > We received the review of our submission from yesterday (record time > once again, Miguel, thank you !). Only remarks for iMinds now. > > @*iMinds*: Please correct today and mail to me that its done. I can > then report to Miguel again. > > Best > > Markus > > The updated table is here, Miguel has replaced the old entry fields > with his new comment: > https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 > > *From:*Miguel Carrillo [mailto:mcp at tid.es] > *Sent:* Dienstag, 29. April 2014 10:06 > *To:* Heller, Markus > *Cc:* MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps > (fiware-apps at lists.fi-ware.org) > *Subject:* Re: WP3 reviewed (just those leaving on M36) > > Hi Markus, > > You have an updated review again. There is little actual work left, > all can be solved quickly. > > Note: the google doc is edible by the reviewers only. > > Best regards, > > Miguel > > El 28/04/2014 20:08, Heller, Markus escribi?: > > Hi Miguel, > > for APPS, we have completed the improvements for Release 3.3. > (manuals/software) now. > > Only for the YELLOW rows improvements were needed according to > your view for now Wave 1 for M36, only for iMinds BM and BC (and > for Service Mashup with mail exchange to DT/Horst). > > I have added the comments from the colleagues in the rightmost > section... I cannot edit the Google docs (no google docs account). > > You can now please check them again and approve if Ok. > > Best > > Markus > > R3.3. Release Status > > > > > > > > > > > > > > > > > > > > > > > > > > > > *GE name* > > > > *Improvement after Miguel Review was needed for Wave 1 (M36)* > > > > *GEi name* > > > > *Last Release* > > > > *Status* > > > > *UTP* > > > > *USER* > > > > *INS* > > > > *Files* > > > > *Comments UTP (all UTPS reviewed by Miguel, irrespective of who > reviews the other manuals)* > > > > *Comments User & Progs.* > > > > *Comments Inst& Admin* > > > > *Files2* > > > > *Observations* > > Application Mashup > > > > NO ACTION M36 > > > > Wirecloud > > > > R3.3 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Light Semantic Composition Editor > > > > NO ACTION M37 > > > > COMPEL > > > > R3.3 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Marketplace > > > > NO ACTION M38 > > > > Marketplace - SAP RI > > > > R3.2 > > > > Accepted > > > > OK > > > > OK > > > > OK > > > > OK > > > > Reviewer: Miguel > > > > Reviewer: Manuel > > > > Reviewer: Miguel > > > > > Mediator > > > > NO > > > > Mediator > > > > R3.2 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Mediator > > > > NO > > > > SETHA2 > > > > R2 > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > > Reviewer: > > > > Reviewer: > > > > > Registry > > > > NO > > > > Registry - SAP RI > > > > R3.3 > > > > Accepted > > > > OK > > > > OK > > > > OK > > > > OK > > > > Reviewer: Miguel > > > > Reviewer: Manuel > > > > Reviewer: Miguel > > > > > TL > > Repository > > > > NO > > > > Repository - SAP RI > > > > R2 > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > > > Reviewer: > > > > > Revenue Settlement and Sharing System > > > > NO > > > > Revenue Settlement and Sharing System > > > > R3.3 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Service Composition > > > > NO > > > > Ericsson Composition Engine (ECE) > > > > R1 > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > > > > > Service Mashup > > > > NO > > > > Mashup Factory > > > > R2 > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > > > > > Wrong entry on catalogue. No link to Installation manual or user > manual on wiki > > DONE: > > This AP was clarified per E-Mail with Horst Stein DT and Markus > and Miguel.... > > Store > > > > NO > > > > WStore > > > > R3.3 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Business Calculator > > > > YES > > > > Business Calculator > > > > R3.3 > > > > Rejected > > > > NOK > > > > NOK > > > > OK > > > > OK > > > > Reviewer: Miguel > Looking better, but one comment was ignored: > * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration > > > > Reviewer: Manuel > Please, set up the Introduction section by following the example > of the Registry: > https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 > - Some figures are placed to the left, others to the center. > - Some figures have text to the right, others below. Please, > follow the same scheme for all of them. > - Some figures have title, others don't > > > > Reviewer: Miguel > > > > > DONE. > > 've just resolved all my issues as mentioned in the excel sheet. > Koen.22.04.2014 > > Business Modeler > > > > YES > > > > Business Modeler > > > > R3.3 > > > > Rejected > > > > OK > > > > NOK > > > > OK > > > > OK > > > > Reviewer: Miguel > > > > Reviewer: Manuel > Please, set up the Introduction section by following the example > of the > Registry: > https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 > - Some figure is left, others are centered > - I miss some proportionality of the figures presented some are > too big for the content they want to emphasize, other's are small. > I'd appreciate some balance > > > > Reviewer: Miguel > > > > > DONE. > > As far as I can tell I fixed my issues today, I'll double-check > tomorrow morning. Camille 22.04.2014 > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > *From:*Miguel Carrillo [mailto:mcp at tid.es] > *Sent:* Montag, 21. April 2014 15:05 > *To:* Heller, Markus > *Cc:* Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE > VICENTE; FERMIN GALAN MARQUEZ > *Subject:* WP3 reviewed (just those leaving on M36) > > Dear Markus, > > We are prioritising those leaving at the end of the month. This > message applies strictly to those marked in grey (if they are not > exactly those partners departing on M36 let us know) > > The other day I announced that part of the manuals are ready. Now > we have them all reviewed. Please distribute to your teams. > > * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 > > > Also, note the observation I added to the Service Mashup (last > delivery in R2). They seem to need changes in the catalogue > > Best regards, > > Miguel > > -- > > ---------------------------------------------------------------------- > > _/ _/_/ Miguel Carrillo Pacheco > > _/ _/ _/ _/ Telef?nica Distrito Telef?nica > > _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 > > _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N > > _/ _/_/ 28050 Madrid (Spain) > > Tel: (+34) 91 483 26 77 > > > > e-mail:mcp at tid.es > > > > Follow FI-WARE on the net > > > > Website:http://www.fi-ware.org > > Facebook:http://www.facebook.com/pages/FI-WARE/251366491587242 > > Twitter:http://twitter.com/Fiware > > LinkedIn:http://www.linkedin.com/groups/FIWARE-4239932 > > ---------------------------------------------------------------------- > > ------------------------------------------------------------------------ > > > Este mensaje se dirige exclusivamente a su destinatario. Puede > consultar nuestra pol?tica de env?o y recepci?n de correo > electr?nico en el enlace situado m?s abajo. > This message is intended exclusively for its addressee. We only > send and receive email on the basis of the terms set out at: > http://www.tid.es/ES/PAGINAS/disclaimer.aspx > > > > -- > ---------------------------------------------------------------------- > _/ _/_/ Miguel Carrillo Pacheco > _/ _/ _/ _/ Telef?nica Distrito Telef?nica > _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 > _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N > _/ _/_/ 28050 Madrid (Spain) > Tel: (+34) 91 483 26 77 > > e-mail:mcp at tid.es > > Follow FI-WARE on the net > > Website:http://www.fi-ware.org > Facebook:http://www.facebook.com/pages/FI-WARE/251366491587242 > Twitter:http://twitter.com/Fiware > LinkedIn:http://www.linkedin.com/groups/FIWARE-4239932 > ---------------------------------------------------------------------- > > ------------------------------------------------------------------------ > > > Este mensaje se dirige exclusivamente a su destinatario. Puede > consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico > en el enlace situado m?s abajo. > This message is intended exclusively for its addressee. We only send > and receive email on the basis of the terms set out at: > http://www.tid.es/ES/PAGINAS/disclaimer.aspx > -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/png Size: 29382 bytes Desc: not available URL: From koen.casier at intec.ugent.be Tue Apr 29 13:47:26 2014 From: koen.casier at intec.ugent.be (koen casier) Date: Tue, 29 Apr 2014 13:47:26 +0200 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <7848_1398761244_535F671C_7848_1104_1_8F1D40232A0E68409E3FC23A30C326620169C29330C9@THSONEA01CMS04P.one.grp> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD35AFE@DEWDFEMB14A.global.corp.sap> <7848_1398761244_535F671C_7848_1104_1_8F1D40232A0E68409E3FC23A30C326620169C29330C9@THSONEA01CMS04P.one.grp> Message-ID: <535F914E.4050307@intec.ugent.be> Hi Daniel, Could you please send me the log-files of the JBoss server and the userinfo.xml file which you should find in the SERVERLOCATION/bin/users directory? best regards, Koen On 4/29/2014 10:47 AM, GIDOIN Daniel wrote: > > We have engaged the test of the ? Business calculator". We are waiting > any additional information from Koen, required to test it. > > Best regards > > Daniel > > *De :*fiware-apps-bounces at lists.fi-ware.org > [mailto:fiware-apps-bounces at lists.fi-ware.org] *De la part de* Heller, > Markus > *Envoy? :* mardi 29 avril 2014 10:15 > *? :* Koen Casier (koen.casier at intec.ugent.be); Camille Reynders; > FI-WARE Apps (fiware-apps at lists.fi-ware.org) > *Objet :* Re: [Fiware-apps] WP3 reviewed (just those leaving on M36) > > Hi WP3 > > We received the review of our submission from yesterday (record time > once again, Miguel, thank you !). Only remarks for iMinds now. > > @*iMinds*: Please correct today and mail to me that its done. I can > then report to Miguel again. > > Best > > Markus > > The updated table is here, Miguel has replaced the old entry fields > with his new comment: > https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 > > *From:*Miguel Carrillo [mailto:mcp at tid.es] > *Sent:* Dienstag, 29. April 2014 10:06 > *To:* Heller, Markus > *Cc:* MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps > (fiware-apps at lists.fi-ware.org ) > *Subject:* Re: WP3 reviewed (just those leaving on M36) > > Hi Markus, > > You have an updated review again. There is little actual work left, > all can be solved quickly. > > Note: the google doc is edible by the reviewers only. > > Best regards, > > Miguel > > El 28/04/2014 20:08, Heller, Markus escribi?: > > Hi Miguel, > > for APPS, we have completed the improvements for Release 3.3. > (manuals/software) now. > > Only for the YELLOW rows improvements were needed according to > your view for now Wave 1 for M36, only for iMinds BM and BC (and > for Service Mashup with mail exchange to DT/Horst). > > I have added the comments from the colleagues in the rightmost > section... I cannot edit the Google docs (no google docs account). > > You can now please check them again and approve if Ok. > > Best > > Markus > > R3.3. Release Status > > > > > > > > > > > > > > > > > > > > > > > > > > > > *GE name* > > > > *Improvement after Miguel Review was needed for Wave 1 (M36)* > > > > *GEi name* > > > > *Last Release* > > > > *Status* > > > > *UTP* > > > > *USER* > > > > *INS* > > > > *Files* > > > > *Comments UTP (all UTPS reviewed by Miguel, irrespective of who > reviews the other manuals)* > > > > *Comments User & Progs.* > > > > *Comments Inst& Admin* > > > > *Files2* > > > > *Observations* > > Application Mashup > > > > NO ACTION M36 > > > > Wirecloud > > > > R3.3 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Light Semantic Composition Editor > > > > NO ACTION M37 > > > > COMPEL > > > > R3.3 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Marketplace > > > > NO ACTION M38 > > > > Marketplace - SAP RI > > > > R3.2 > > > > Accepted > > > > OK > > > > OK > > > > OK > > > > OK > > > > Reviewer: Miguel > > > > Reviewer: Manuel > > > > Reviewer: Miguel > > > > > Mediator > > > > NO > > > > Mediator > > > > R3.2 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Mediator > > > > NO > > > > SETHA2 > > > > R2 > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > > Reviewer: > > > > Reviewer: > > > > > Registry > > > > NO > > > > Registry - SAP RI > > > > R3.3 > > > > Accepted > > > > OK > > > > OK > > > > OK > > > > OK > > > > Reviewer: Miguel > > > > Reviewer: Manuel > > > > Reviewer: Miguel > > > > > TL > > Repository > > > > NO > > > > Repository - SAP RI > > > > R2 > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > > > Reviewer: > > > > > Revenue Settlement and Sharing System > > > > NO > > > > Revenue Settlement and Sharing System > > > > R3.3 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Service Composition > > > > NO > > > > Ericsson Composition Engine (ECE) > > > > R1 > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > > > > > Service Mashup > > > > NO > > > > Mashup Factory > > > > R2 > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > N/A > > > > > > > > Wrong entry on catalogue. No link to Installation manual or user > manual on wiki > > DONE: > > This AP was clarified per E-Mail with Horst Stein DT and Markus > and Miguel.... > > Store > > > > NO > > > > WStore > > > > R3.3 > > > > Awaiting review > > > > Pending > > > > Pending > > > > Pending > > > > Pending > > > > Reviewer: > > > > Reviewer: > > > > Reviewer: > > > > > Business Calculator > > > > YES > > > > Business Calculator > > > > R3.3 > > > > Rejected > > > > NOK > > > > NOK > > > > OK > > > > OK > > > > Reviewer: Miguel > Looking better, but one comment was ignored: > * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration > > > > Reviewer: Manuel > Please, set up the Introduction section by following the example > of the Registry: > https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 > - Some figures are placed to the left, others to the center. > - Some figures have text to the right, others below. Please, > follow the same scheme for all of them. > - Some figures have title, others don't > > > > Reviewer: Miguel > > > > > DONE. > > 've just resolved all my issues as mentioned in the excel sheet. > Koen.22.04.2014 > > Business Modeler > > > > YES > > > > Business Modeler > > > > R3.3 > > > > Rejected > > > > OK > > > > NOK > > > > OK > > > > OK > > > > Reviewer: Miguel > > > > Reviewer: Manuel > Please, set up the Introduction section by following the example > of the > Registry: > https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 > - Some figure is left, others are centered > - I miss some proportionality of the figures presented some are > too big for the content they want to emphasize, other's are small. > I'd appreciate some balance > > > > Reviewer: Miguel > > > > > DONE. > > As far as I can tell I fixed my issues today, I'll double-check > tomorrow morning. Camille 22.04.2014 > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > *From:*Miguel Carrillo [mailto:mcp at tid.es] > *Sent:* Montag, 21. April 2014 15:05 > *To:* Heller, Markus > *Cc:* Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE > VICENTE; FERMIN GALAN MARQUEZ > *Subject:* WP3 reviewed (just those leaving on M36) > > Dear Markus, > > We are prioritising those leaving at the end of the month. This > message applies strictly to those marked in grey (if they are not > exactly those partners departing on M36 let us know) > > The other day I announced that part of the manuals are ready. Now > we have them all reviewed. Please distribute to your teams. > > * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 > > > Also, note the observation I added to the Service Mashup (last > delivery in R2). They seem to need changes in the catalogue > > Best regards, > > Miguel > > -- > > ---------------------------------------------------------------------- > > _/ _/_/ Miguel Carrillo Pacheco > > _/ _/ _/ _/ Telef?nica Distrito Telef?nica > > _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 > > _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N > > _/ _/_/ 28050 Madrid (Spain) > > Tel: (+34) 91 483 26 77 > > > > e-mail:mcp at tid.es > > > > Follow FI-WARE on the net > > > > Website:http://www.fi-ware.org > > Facebook:http://www.facebook.com/pages/FI-WARE/251366491587242 > > Twitter:http://twitter.com/Fiware > > LinkedIn:http://www.linkedin.com/groups/FIWARE-4239932 > > ---------------------------------------------------------------------- > > ------------------------------------------------------------------------ > > > Este mensaje se dirige exclusivamente a su destinatario. Puede > consultar nuestra pol?tica de env?o y recepci?n de correo > electr?nico en el enlace situado m?s abajo. > This message is intended exclusively for its addressee. We only > send and receive email on the basis of the terms set out at: > http://www.tid.es/ES/PAGINAS/disclaimer.aspx > > -- > ---------------------------------------------------------------------- > _/ _/_/ Miguel Carrillo Pacheco > _/ _/ _/ _/ Telef?nica Distrito Telef?nica > _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 > _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N > _/ _/_/ 28050 Madrid (Spain) > Tel: (+34) 91 483 26 77 > > e-mail:mcp at tid.es > > Follow FI-WARE on the net > > Website:http://www.fi-ware.org > Facebook:http://www.facebook.com/pages/FI-WARE/251366491587242 > Twitter:http://twitter.com/Fiware > LinkedIn:http://www.linkedin.com/groups/FIWARE-4239932 > ---------------------------------------------------------------------- > > ------------------------------------------------------------------------ > > > Este mensaje se dirige exclusivamente a su destinatario. Puede > consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico > en el enlace situado m?s abajo. > This message is intended exclusively for its addressee. We only send > and receive email on the basis of the terms set out at: > http://www.tid.es/ES/PAGINAS/disclaimer.aspx > -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/png Size: 29382 bytes Desc: not available URL: From andreas.klein at sap.com Tue Apr 29 13:52:00 2014 From: andreas.klein at sap.com (Klein, Andreas) Date: Tue, 29 Apr 2014 11:52:00 +0000 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <535F90EA.9070305@intec.ugent.be> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD35AFE@DEWDFEMB14A.global.corp.sap> <535F90EA.9070305@intec.ugent.be> Message-ID: <556F697ADC3400408FBBCF7C6040979D967E40A1@DEWDFEMB15B.global.corp.sap> Hi Koen, I guess Miguel is checking your test cases against the features promised in the technical roadmap. Removing FIWARE.Feature.Apps.BEMES.RSSIntegration from the technical Roadmap should be sufficient. https://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Roadmap_of_Applications/Services_Ecosystem_and_Delivery_Framework#Second_Major_Release_.283Q_2013.29 Best Andreas From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of koen casier Sent: Dienstag, 29. April 2014 13:46 To: Heller, Markus; Camille Reynders; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: [Fiware-apps] WP3 reviewed (just those leaving on M36) Hi Markus, Thanks for informing us of these issues. However, the feature to which Miguel is referring has been dismissed in the backlog. I think it is a strange thing to detail the test procedure for a dismissed item of the backlog. As such I have no idea how to solve this issue? best regards, Koen On 4/29/2014 10:15 AM, Heller, Markus wrote: Hi WP3 We received the review of our submission from yesterday (record time once again, Miguel, thank you !). Only remarks for iMinds now. @iMinds: Please correct today and mail to me that its done. I can then report to Miguel again. Best Markus The updated table is here, Miguel has replaced the old entry fields with his new comment: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 [cid:image001.png at 01CF63B2.30F40260] From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Dienstag, 29. April 2014 10:06 To: Heller, Markus Cc: MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: WP3 reviewed (just those leaving on M36) Hi Markus, You have an updated review again. There is little actual work left, all can be solved quickly. Note: the google doc is edible by the reviewers only. Best regards, Miguel El 28/04/2014 20:08, Heller, Markus escribi?: Hi Miguel, for APPS, we have completed the improvements for Release 3.3. (manuals/software) now. Only for the YELLOW rows improvements were needed according to your view for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup with mail exchange to DT/Horst). I have added the comments from the colleagues in the rightmost section... I cannot edit the Google docs (no google docs account). You can now please check them again and approve if Ok. Best Markus R3.3. Release Status GE name Improvement after Miguel Review was needed for Wave 1 (M36) GEi name Last Release Status UTP USER INS Files Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews the other manuals) Comments User & Progs. Comments Inst& Admin Files2 Observations Application Mashup NO ACTION M36 Wirecloud R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Light Semantic Composition Editor NO ACTION M37 COMPEL R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Marketplace NO ACTION M38 Marketplace - SAP RI R3.2 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel Mediator NO Mediator R3.2 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Mediator NO SETHA2 R2 N/A N/A N/A N/A N/A Reviewer: Reviewer: Registry NO Registry - SAP RI R3.3 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel TL Repository NO Repository - SAP RI R2 N/A N/A N/A N/A N/A Reviewer: Revenue Settlement and Sharing System NO Revenue Settlement and Sharing System R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Service Composition NO Ericsson Composition Engine (ECE) R1 N/A N/A N/A N/A N/A Service Mashup NO Mashup Factory R2 N/A N/A N/A N/A N/A Wrong entry on catalogue. No link to Installation manual or user manual on wiki DONE: This AP was clarified per E-Mail with Horst Stein DT and Markus and Miguel.... Store NO WStore R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Business Calculator YES Business Calculator R3.3 Rejected NOK NOK OK OK Reviewer: Miguel Looking better, but one comment was ignored: * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figures are placed to the left, others to the center. - Some figures have text to the right, others below. Please, follow the same scheme for all of them. - Some figures have title, others don't Reviewer: Miguel DONE. 've just resolved all my issues as mentioned in the excel sheet. Koen.22.04.2014 Business Modeler YES Business Modeler R3.3 Rejected OK NOK OK OK Reviewer: Miguel Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figure is left, others are centered - I miss some proportionality of the figures presented some are too big for the content they want to emphasize, other's are small. I'd appreciate some balance Reviewer: Miguel DONE. As far as I can tell I fixed my issues today, I'll double-check tomorrow morning. Camille 22.04.2014 From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Montag, 21. April 2014 15:05 To: Heller, Markus Cc: Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ Subject: WP3 reviewed (just those leaving on M36) Dear Markus, We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 29382 bytes Desc: image001.png URL: From markus.heller at sap.com Tue Apr 29 14:19:21 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 29 Apr 2014 12:19:21 +0000 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <535F5D77.50000@tid.es> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD35E91@DEWDFEMB14A.global.corp.sap> Hi Miguel, We are ready now and have addressed your 2nd review: - Business Calculator: Koen remarks that the feature has been dismissed in the backlog. Therefore a test procedure does not need to be detailed for it. - Business Modeler: Camille has improved and resolved the issues mentioned. You can now please check and approve the entries in the wave 1, if you agree? Best Markus [cid:image001.png at 01CF63B6.0379DEF0] From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Dienstag, 29. April 2014 10:06 To: Heller, Markus Cc: MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: WP3 reviewed (just those leaving on M36) Hi Markus, You have an updated review again. There is little actual work left, all can be solved quickly. Note: the google doc is edible by the reviewers only. Best regards, Miguel El 28/04/2014 20:08, Heller, Markus escribi?: Hi Miguel, for APPS, we have completed the improvements for Release 3.3. (manuals/software) now. Only for the YELLOW rows improvements were needed according to your view for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup with mail exchange to DT/Horst). I have added the comments from the colleagues in the rightmost section... I cannot edit the Google docs (no google docs account). You can now please check them again and approve if Ok. Best Markus R3.3. Release Status GE name Improvement after Miguel Review was needed for Wave 1 (M36) GEi name Last Release Status UTP USER INS Files Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews the other manuals) Comments User & Progs. Comments Inst& Admin Files2 Observations Application Mashup NO ACTION M36 Wirecloud R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Light Semantic Composition Editor NO ACTION M37 COMPEL R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Marketplace NO ACTION M38 Marketplace - SAP RI R3.2 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel Mediator NO Mediator R3.2 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Mediator NO SETHA2 R2 N/A N/A N/A N/A N/A Reviewer: Reviewer: Registry NO Registry - SAP RI R3.3 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel TL Repository NO Repository - SAP RI R2 N/A N/A N/A N/A N/A Reviewer: Revenue Settlement and Sharing System NO Revenue Settlement and Sharing System R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Service Composition NO Ericsson Composition Engine (ECE) R1 N/A N/A N/A N/A N/A Service Mashup NO Mashup Factory R2 N/A N/A N/A N/A N/A Wrong entry on catalogue. No link to Installation manual or user manual on wiki DONE: This AP was clarified per E-Mail with Horst Stein DT and Markus and Miguel.... Store NO WStore R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Business Calculator YES Business Calculator R3.3 Rejected NOK NOK OK OK Reviewer: Miguel Looking better, but one comment was ignored: * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figures are placed to the left, others to the center. - Some figures have text to the right, others below. Please, follow the same scheme for all of them. - Some figures have title, others don't Reviewer: Miguel DONE. 've just resolved all my issues as mentioned in the excel sheet. Koen.22.04.2014 Business Modeler YES Business Modeler R3.3 Rejected OK NOK OK OK Reviewer: Miguel Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figure is left, others are centered - I miss some proportionality of the figures presented some are too big for the content they want to emphasize, other's are small. I'd appreciate some balance Reviewer: Miguel DONE. As far as I can tell I fixed my issues today, I'll double-check tomorrow morning. Camille 22.04.2014 From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Montag, 21. April 2014 15:05 To: Heller, Markus Cc: Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ Subject: WP3 reviewed (just those leaving on M36) Dear Markus, We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 24651 bytes Desc: image001.png URL: From mcp at tid.es Tue Apr 29 14:40:29 2014 From: mcp at tid.es (Miguel Carrillo) Date: Tue, 29 Apr 2014 14:40:29 +0200 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD35E91@DEWDFEMB14A.global.corp.sap> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD35E91@DEWDFEMB14A.global.corp.sap> Message-ID: <535F9DBD.2040805@tid.es> B calculator: If a given feature was not developed in R3, I do not understand why they do not delete if from the roadmap. It is a "zombi". Please make it consistent. El 29/04/2014 14:19, Heller, Markus escribi?: Hi Miguel, We are ready now and have addressed your 2nd review: - Business Calculator: Koen remarks that the feature has been dismissed in the backlog. Therefore a test procedure does not need to be detailed for it. - Business Modeler: Camille has improved and resolved the issues mentioned. You can now please check and approve the entries in the wave 1, if you agree? Best Markus [cid:part1.03000809.04020403 at tid.es] From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Dienstag, 29. April 2014 10:06 To: Heller, Markus Cc: MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: WP3 reviewed (just those leaving on M36) Hi Markus, You have an updated review again. There is little actual work left, all can be solved quickly. Note: the google doc is edible by the reviewers only. Best regards, Miguel El 28/04/2014 20:08, Heller, Markus escribi?: Hi Miguel, for APPS, we have completed the improvements for Release 3.3. (manuals/software) now. Only for the YELLOW rows improvements were needed according to your view for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup with mail exchange to DT/Horst). I have added the comments from the colleagues in the rightmost section... I cannot edit the Google docs (no google docs account). You can now please check them again and approve if Ok. Best Markus R3.3. Release Status GE name Improvement after Miguel Review was needed for Wave 1 (M36) GEi name Last Release Status UTP USER INS Files Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews the other manuals) Comments User & Progs. Comments Inst& Admin Files2 Observations Application Mashup NO ACTION M36 Wirecloud R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Light Semantic Composition Editor NO ACTION M37 COMPEL R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Marketplace NO ACTION M38 Marketplace - SAP RI R3.2 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel Mediator NO Mediator R3.2 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Mediator NO SETHA2 R2 N/A N/A N/A N/A N/A Reviewer: Reviewer: Registry NO Registry - SAP RI R3.3 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel TL Repository NO Repository - SAP RI R2 N/A N/A N/A N/A N/A Reviewer: Revenue Settlement and Sharing System NO Revenue Settlement and Sharing System R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Service Composition NO Ericsson Composition Engine (ECE) R1 N/A N/A N/A N/A N/A Service Mashup NO Mashup Factory R2 N/A N/A N/A N/A N/A Wrong entry on catalogue. No link to Installation manual or user manual on wiki DONE: This AP was clarified per E-Mail with Horst Stein DT and Markus and Miguel.... Store NO WStore R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Business Calculator YES Business Calculator R3.3 Rejected NOK NOK OK OK Reviewer: Miguel Looking better, but one comment was ignored: * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figures are placed to the left, others to the center. - Some figures have text to the right, others below. Please, follow the same scheme for all of them. - Some figures have title, others don't Reviewer: Miguel DONE. 've just resolved all my issues as mentioned in the excel sheet. Koen.22.04.2014 Business Modeler YES Business Modeler R3.3 Rejected OK NOK OK OK Reviewer: Miguel Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figure is left, others are centered - I miss some proportionality of the figures presented some are too big for the content they want to emphasize, other's are small. I'd appreciate some balance Reviewer: Miguel DONE. As far as I can tell I fixed my issues today, I'll double-check tomorrow morning. Camille 22.04.2014 From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Montag, 21. April 2014 15:05 To: Heller, Markus Cc: Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ Subject: WP3 reviewed (just those leaving on M36) Dear Markus, We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/png Size: 24651 bytes Desc: not available URL: From markus.heller at sap.com Tue Apr 29 14:42:12 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 29 Apr 2014 12:42:12 +0000 Subject: [Fiware-apps] WP3 reviewed (just those leaving on M36) In-Reply-To: <535F9DBD.2040805@tid.es> References: <53551776.1080509@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD3587D@DEWDFEMB14A.global.corp.sap> <535F5D77.50000@tid.es> <393554EDCF801348BC53C7813C6CB73B1AD35E91@DEWDFEMB14A.global.corp.sap> <535F9DBD.2040805@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD35F10@DEWDFEMB14A.global.corp.sap> Hi Miguel, Ok, do you approve the architecture ? best Markus From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Dienstag, 29. April 2014 14:40 To: Heller, Markus Cc: MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: WP3 reviewed (just those leaving on M36) B calculator: If a given feature was not developed in R3, I do not understand why they do not delete if from the roadmap. It is a "zombi". Please make it consistent. El 29/04/2014 14:19, Heller, Markus escribi?: Hi Miguel, We are ready now and have addressed your 2nd review: - Business Calculator: Koen remarks that the feature has been dismissed in the backlog. Therefore a test procedure does not need to be detailed for it. - Business Modeler: Camille has improved and resolved the issues mentioned. You can now please check and approve the entries in the wave 1, if you agree? Best Markus [cid:image001.png at 01CF63B9.346F9060] From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Dienstag, 29. April 2014 10:06 To: Heller, Markus Cc: MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ; FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: Re: WP3 reviewed (just those leaving on M36) Hi Markus, You have an updated review again. There is little actual work left, all can be solved quickly. Note: the google doc is edible by the reviewers only. Best regards, Miguel El 28/04/2014 20:08, Heller, Markus escribi?: Hi Miguel, for APPS, we have completed the improvements for Release 3.3. (manuals/software) now. Only for the YELLOW rows improvements were needed according to your view for now Wave 1 for M36, only for iMinds BM and BC (and for Service Mashup with mail exchange to DT/Horst). I have added the comments from the colleagues in the rightmost section... I cannot edit the Google docs (no google docs account). You can now please check them again and approve if Ok. Best Markus R3.3. Release Status GE name Improvement after Miguel Review was needed for Wave 1 (M36) GEi name Last Release Status UTP USER INS Files Comments UTP (all UTPS reviewed by Miguel, irrespective of who reviews the other manuals) Comments User & Progs. Comments Inst& Admin Files2 Observations Application Mashup NO ACTION M36 Wirecloud R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Light Semantic Composition Editor NO ACTION M37 COMPEL R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Marketplace NO ACTION M38 Marketplace - SAP RI R3.2 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel Mediator NO Mediator R3.2 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Mediator NO SETHA2 R2 N/A N/A N/A N/A N/A Reviewer: Reviewer: Registry NO Registry - SAP RI R3.3 Accepted OK OK OK OK Reviewer: Miguel Reviewer: Manuel Reviewer: Miguel TL Repository NO Repository - SAP RI R2 N/A N/A N/A N/A N/A Reviewer: Revenue Settlement and Sharing System NO Revenue Settlement and Sharing System R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Service Composition NO Ericsson Composition Engine (ECE) R1 N/A N/A N/A N/A N/A Service Mashup NO Mashup Factory R2 N/A N/A N/A N/A N/A Wrong entry on catalogue. No link to Installation manual or user manual on wiki DONE: This AP was clarified per E-Mail with Horst Stein DT and Markus and Miguel.... Store NO WStore R3.3 Awaiting review Pending Pending Pending Pending Reviewer: Reviewer: Reviewer: Business Calculator YES Business Calculator R3.3 Rejected NOK NOK OK OK Reviewer: Miguel Looking better, but one comment was ignored: * Feature not traced: FIWARE.Feature.Apps.BEMES.RSSIntegration Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figures are placed to the left, others to the center. - Some figures have text to the right, others below. Please, follow the same scheme for all of them. - Some figures have title, others don't Reviewer: Miguel DONE. 've just resolved all my issues as mentioned in the excel sheet. Koen.22.04.2014 Business Modeler YES Business Modeler R3.3 Rejected OK NOK OK OK Reviewer: Miguel Reviewer: Manuel Please, set up the Introduction section by following the example of the Registry: https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/Registry_-_User_and_Programmers_Guide%28R3.3%29 - Some figure is left, others are centered - I miss some proportionality of the figures presented some are too big for the content they want to emphasize, other's are small. I'd appreciate some balance Reviewer: Miguel DONE. As far as I can tell I fixed my issues today, I'll double-check tomorrow morning. Camille 22.04.2014 From: Miguel Carrillo [mailto:mcp at tid.es] Sent: Montag, 21. April 2014 15:05 To: Heller, Markus Cc: Sandfuchs, Thorsten; Leidig, Torsten; MANUEL ESCRICHE VICENTE; FERMIN GALAN MARQUEZ Subject: WP3 reviewed (just those leaving on M36) Dear Markus, We are prioritising those leaving at the end of the month. This message applies strictly to those marked in grey (if they are not exactly those partners departing on M36 let us know) The other day I announced that part of the manuals are ready. Now we have them all reviewed. Please distribute to your teams. * https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGlvRWJrQl96M1VNTHBlc3hvUGF0Zmc#gid=0 Also, note the observation I added to the Service Mashup (last delivery in R2). They seem to need changes in the catalogue Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 24651 bytes Desc: image001.png URL: From markus.heller at sap.com Tue Apr 29 16:05:48 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 29 Apr 2014 14:05:48 +0000 Subject: [Fiware-apps] FI-WARE: WP3 Call Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD360C2@DEWDFEMB14A.global.corp.sap> Hi all, FY I have now extended the call series to 30.09.2014. Alessandra later will setup her own call, I assume. Until then, we can use the SAP dialin data... Best Markus --- Dear FI-WARE WP3 colleagues, I invite you to our new WP3 Call on Tuesdays 15-16. Please use the dial-in info below. Best wishes Markus ---- Please join me in a SAP CONNECT meeting. Web conference: https://sap.emea.pgiconnect.com/heller Audio Participant Code: 124 225 33 29 Country Number Blackberry Friendly / Lync Friendly (if you are running SAP Lync Quality Advisor) Android Friendly Germany, Frankfurt tel:+4969222210764 tel:+4969222210764x1242253329# tel:+4969222210764;1242253329# Germany, Munich tel:+4989710424682 tel:+4989710424682x1242253329# tel:+4989710424682;1242253329# Europe Austria, Vienna tel:+431253021750 tel:+431253021750x1242253329# tel:+431253021750;1242253329# France, Paris tel:+33170701777 tel:+33170701777x1242253329# tel:+33170701777;1242253329# Italy, Milan tel:+390236009839 tel:+390236009839x1242253329# tel:+390236009839;1242253329# Spain, Madrid tel:+34917699443 tel:+34917699443x1242253329# tel:+34917699443;1242253329# Switzerland, Zurich tel:+41434569248 tel:+41434569248x1242253329# tel:+41434569248;1242253329# UK, London tel:+442033645639 tel:+442033645639x1242253329# tel:+442033645639;1242253329# Overseas Australia, Sydney tel:+61290090688 tel:+61290090688x1242253329# tel:+61290090688;1242253329# India, Bangalore tel:+918061275055 tel:+918061275055x1242253329# tel:+918061275055;1242253329# USA, New York tel:+16464340499 tel:+16464340499x1242253329# tel:+16464340499;1242253329# If you have never attended a Connect Pro meeting before: Test your connection: https://sap.emea.pgiconnect.com/common/help/en/support/meeting_test.htm Get a quick overview: http://www.adobe.com/go/connectpro_overview Adobe, the Adobe -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 22794 bytes Desc: not available URL: From markus.heller at sap.com Tue Apr 29 17:54:11 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 29 Apr 2014 15:54:11 +0000 Subject: [Fiware-apps] Current State on "GEis installation and test" for WP3 Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD36481@DEWDFEMB14A.global.corp.sap> Hi all, I have collected the current state for GE test reports is as follows (attachment with all reports so far FYI) For M36 wave 1 these open items are as far as I can see: Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) Service Mashup Mashup Factory iMinds (Koen) Business Calculator Business Calculator THALES --> Please send your missing test reports as soon as possible. The rest of the tests is wave 2 - for later...deadline for wave 2 is 30.June.2014 Best Markus --- Here the table: Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester completion date Apps - WP3 Application Mashup Wirecloud YES NO SAP DONE 24.04.2014 Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Registry Registry - SAP RI R3.2 YES NO ATOS - to be confirmed - assigned by WPL Repository Repository - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Revenue Settlement and Sharing System Revenue Settlement and Sharing System R3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds (Koen) - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore R3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner DONE 24.04.2014 From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 952112 bytes Desc: not available URL: From markus.heller at sap.com Tue Apr 29 20:31:01 2014 From: markus.heller at sap.com (Heller, Markus) Date: Tue, 29 Apr 2014 18:31:01 +0000 Subject: [Fiware-apps] Our WPA for WP3 Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD36552@DEWDFEMB14A.global.corp.sap> Dear all, As announced before, we are in the process in our team to select a new WPA taking over from Torsten Leidig. Let us finalize now the process to identify the new WPA candidate. Recently I asked you all to think about a possible engagement as WP3 WPA. From my side I would like to propose Javier Soriano from UPM for this WPA role. Would you as each FI-WARE partner please signal to me if you are OK with this proposal, or if you reject it for some reasons, or if you would like to propose another candidate for the WP3 WPA role? @ALL: Please per each partner reply to me / the mailing list with your contributions. Deadline: Friday 2.May EOB - so that we can finalize this in the upcoming WP3 telco next week. Best Markus -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 5968 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 30 10:24:53 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 30 Apr 2014 08:24:53 +0000 Subject: [Fiware-apps] FW: WP3 reviewed (just those leaving on M36) --> D2.3.3 Architecture - WP3 contribution Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD36CE9@DEWDFEMB14A.global.corp.sap> FYI URL on Forge.... From: Heller, Markus Sent: Mittwoch, 30. April 2014 10:21 To: MANUEL ESCRICHE VICENTE Subject: FW: WP3 reviewed (just those leaving on M36) --> Architecture Hi Manuel, > . If this is final, we need the final doc/pdf (both) ready to deliver. I have now also created a PDF of the final WP3 Architecture contribution and stored it in the same folder aside the WORD with "private" setting: https://forge.fi-ware.org/docman/view.php/27/3851/D.2.3.3+-+FI-WARE+Architecture+WP3+Contribution.pdf In summary, we have uploaded WORD and DOC of the final contribution to the "intermediate" locations (folder Peer reviews and subfolders "archreview" and "openspecs" (for the open specs) as in screenshot). So now we know where they are stored it... Best Markus [cid:image001.png at 01CF645D.EADA87C0] -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 137960 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 30 10:25:35 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 30 Apr 2014 08:25:35 +0000 Subject: [Fiware-apps] FW: D3.1.3 Open Specs: WP3 contribution completed In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD36CD5@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD362F7@DEWDFEMB14A.global.corp.sap> <65CDBE2E7E5A964BB8BC5F4328FDE90BDAE33E16@EX10-MB1-MAD.hi.inet> <393554EDCF801348BC53C7813C6CB73B1AD36335@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD36CD5@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD36D01@DEWDFEMB14A.global.corp.sap> FYI URL on Forge From: Heller, Markus Sent: Mittwoch, 30. April 2014 10:24 To: MANUEL ESCRICHE VICENTE Cc: MIGUEL CARRILLO PACHECO Subject: RE: D3.1.3 Open Specs: WP3 contribution completed Hi Manuel, > If this is final, we need the final doc/pdf (both) ready to deliver. Open specs: I have now also created a PDF of the final WP3 Open Specs contribution and stored it in the same folder aside the WORD with ?private? setting: https://forge.fi-ware.org/docman/view.php/27/3852/D.3.1.3+-+FI-WARE+GE+Open+Specification+-+WP3+Contribution.pdf In summary, we have uploaded WORD and DOC of the final contribution to the ?intermediate? locations (folder Peer reviews and subfolders ?archreview? and ?openspecs? (for the open specs) as in screenshot). So now we know where they are stored it? Best Markus [cid:image001.png at 01CF645E.4063CEE0] From: Heller, Markus Sent: Dienstag, 29. April 2014 17:28 To: MANUEL ESCRICHE VICENTE Cc: MIGUEL CARRILLO PACHECO Subject: RE: D3.1.3 Open Specs: WP3 contribution completed Hi Manuel, Thank you! Best wishes Markus From: MANUEL ESCRICHE VICENTE [mailto:mev at tid.es] Sent: Dienstag, 29. April 2014 17:27 To: Heller, Markus Cc: MIGUEL CARRILLO PACHECO Subject: RE: D3.1.3 Open Specs: WP3 contribution completed Thanks Markus!! Well done!! Congratulations!! I understand Miguel will proceed to its delivery quickly!! I?ll update the delivery awareness report with the delivery date of the actual submission and will inform the consortium!! Manuel From: Heller, Markus [mailto:markus.heller at sap.com] Sent: martes, 29 de abril de 2014 17:23 To: MANUEL ESCRICHE VICENTE Cc: MIGUEL CARRILLO PACHECO Subject: D3.1.3 Open Specs: WP3 contribution completed Hi Manuel, I would like to inform you that we have completed our action items for WP3 input to the upcoming D3.1.3 Open Specs Deliverable. We have published the approved content on public wiki and uploaded a generated WORD that was generated from public wiki FYI to the Forge, I hope the location is acceptable: OpenSpecification: https://forge.fi-ware.org/docman/view.php/27/3850/D.3.1.3_FI-WARE+GE+Open+Specification.docx As far as I know, we have no action item besides this now for Architecture ans are waiting for submission later only?. Best Markus ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 138602 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 30 10:27:13 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 30 Apr 2014 08:27:13 +0000 Subject: [Fiware-apps] FW: [Fiware-wpl] Fwd: Re: IoT packages: where to upload the packages? In-Reply-To: <5360B16C.7080402@tid.es> References: <5360B010.9070301@tid.es> <5360B16C.7080402@tid.es> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD36D1F@DEWDFEMB14A.global.corp.sap> FYI this is relevant for the 3 Packages in WP3 From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of Miguel Carrillo Sent: Mittwoch, 30. April 2014 10:17 To: fiware-wpa at lists.fi-ware.org; fiware-wpl at lists.fi-ware.org Subject: [Fiware-wpl] Fwd: Re: IoT packages: where to upload the packages? This is of general interest. -------- Mensaje original -------- Asunto: Re: IoT packages: where to upload the packages? Fecha: Wed, 30 Apr 2014 10:10:56 +0200 De: Miguel Carrillo Para: thierry.nagellen at orange.com, MANUEL ESCRICHE VICENTE , FERMIN GALAN MARQUEZ Hi Thierry, Very quickly, there are many things going on in parallel today. Place: Files tool on forge Naming Rules: Same ones as for the the GEs - instead of a GEi name you have package names now Documentation You can upload documents together with the package to the Files tools. I guess that the doc would be something like release notes. I am aware that some WPs are creating private wiki pages but I assume that these will be short and can be used to create a pdf document easily. BR Miguel El 30/04/2014 8:37, thierry.nagellen at orange.com escribi?: Hi Miguel, Manuel, Do we have the guidelines for the software packages which will typically install 2 or 3 IoT GEis together? * Rules for the naming of the package * Place to upload them (I expect in the forge but in this case we should have a clear naming system for packages) * And documentation? Typically in IoT we have a package for the Technicolor Cloud Proxy which install together Esper4FastData and Protocol Adapter ZPA. In the same way, the team worked last week in Madrid on integration between Backend GEis to provide packages so before to ask developers to do some actions to publish these packages I would be sure we tackle all the issues. Thanks, Thierry Nagellen -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 12038 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 30 10:44:25 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 30 Apr 2014 08:44:25 +0000 Subject: [Fiware-apps] Current State on "GEis installation and test" for WP3 In-Reply-To: <47637E3E5662AD4B9B640BA60ADB4314044C9F@DEFTHW99EX2MSX.ww931.my-it-solutions.net> References: <393554EDCF801348BC53C7813C6CB73B1AD36481@DEWDFEMB14A.global.corp.sap> <47637E3E5662AD4B9B640BA60ADB4314044C9F@DEFTHW99EX2MSX.ww931.my-it-solutions.net> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD36D7C@DEWDFEMB14A.global.corp.sap> Hi Joaquin, Thank you, I have sent it to Stefano and Thorsten Sandfuchs (attachment). Current state: For M36 wave 1 these open items are as far as I can see: Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) Service Mashup Mashup Factory iMinds (Koen) Business Calculator Business Calculator THALES New Table: Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester completion date Apps - WP3 Application Mashup Wirecloud YES NO SAP DONE 24.04.2014 Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Registry Registry - SAP RI R3.2 YES NO ATOS - to be confirmed - assigned by WPL DONE 30.04.2014 Repository Repository - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Revenue Settlement and Sharing System Revenue Settlement and Sharing System R3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds (Koen) - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore R3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner DONE 24.04.2014 Best Markus From: Iranzo Yuste, Joaquin [mailto:joaquin.iranzo at atos.net] Sent: Mittwoch, 30. April 2014 09:11 To: Heller, Markus Subject: RE: Current State on "GEis installation and test" for WP3 Hi Markus, I want to send you our installation and test document for the Registry GE. Regards, Joaquin. From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of Heller, Markus Sent: Tuesday, April 29, 2014 5:54 PM To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: [Fiware-apps] Current State on "GEis installation and test" for WP3 Hi all, I have collected the current state for GE test reports is as follows (attachment with all reports so far FYI) For M36 wave 1 these open items are as far as I can see: Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) Service Mashup Mashup Factory iMinds (Koen) Business Calculator Business Calculator THALES --> Please send your missing test reports as soon as possible. The rest of the tests is wave 2 - for later...deadline for wave 2 is 30.June.2014 Best Markus --- Here the table: Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester completion date Apps - WP3 Application Mashup Wirecloud YES NO SAP DONE 24.04.2014 Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Registry Registry - SAP RI R3.2 YES NO ATOS - to be confirmed - assigned by WPL Repository Repository - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Revenue Settlement and Sharing System Revenue Settlement and Sharing System R3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds (Koen) - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore R3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner DONE 24.04.2014 From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 336809 bytes Desc: not available URL: From daniel.gidoin at thalesgroup.com Wed Apr 30 10:57:01 2014 From: daniel.gidoin at thalesgroup.com (GIDOIN Daniel) Date: Wed, 30 Apr 2014 10:57:01 +0200 Subject: [Fiware-apps] Current State on "GEis installation and test" for WP3 In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD36D7C@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD36481@DEWDFEMB14A.global.corp.sap> <47637E3E5662AD4B9B640BA60ADB4314044C9F@DEFTHW99EX2MSX.ww931.my-it-solutions.net> <393554EDCF801348BC53C7813C6CB73B1AD36D7C@DEWDFEMB14A.global.corp.sap> Message-ID: <7192_1398848221_5360BADC_7192_1825_1_8F1D40232A0E68409E3FC23A30C326620169C2983A19@THSONEA01CMS04P.one.grp> Dear Markus, Since yesterday, Phong is working to test Business Calculator but we are faced with issues (Jboss and java version and licencing, the off line don't operate, we have not models....). The problems pile up! It's very discouraging! Best regards Daniel De : fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] De la part de Heller, Markus Envoy? : mercredi 30 avril 2014 10:44 ? : FI-WARE Apps (fiware-apps at lists.fi-ware.org) Objet : Re: [Fiware-apps] Current State on "GEis installation and test" for WP3 Hi Joaquin, Thank you, I have sent it to Stefano and Thorsten Sandfuchs (attachment). Current state: For M36 wave 1 these open items are as far as I can see: Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) Service Mashup Mashup Factory iMinds (Koen) Business Calculator Business Calculator THALES New Table: Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester completion date Apps - WP3 Application Mashup Wirecloud YES NO SAP DONE 24.04.2014 Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Registry Registry - SAP RI R3.2 YES NO ATOS - to be confirmed - assigned by WPL DONE 30.04.2014 Repository Repository - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Revenue Settlement and Sharing System Revenue Settlement and Sharing System R3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds (Koen) - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore R3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner DONE 24.04.2014 Best Markus From: Iranzo Yuste, Joaquin [mailto:joaquin.iranzo at atos.net] Sent: Mittwoch, 30. April 2014 09:11 To: Heller, Markus Subject: RE: Current State on "GEis installation and test" for WP3 Hi Markus, I want to send you our installation and test document for the Registry GE. Regards, Joaquin. From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of Heller, Markus Sent: Tuesday, April 29, 2014 5:54 PM To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: [Fiware-apps] Current State on "GEis installation and test" for WP3 Hi all, I have collected the current state for GE test reports is as follows (attachment with all reports so far FYI) For M36 wave 1 these open items are as far as I can see: Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) Service Mashup Mashup Factory iMinds (Koen) Business Calculator Business Calculator THALES --> Please send your missing test reports as soon as possible. The rest of the tests is wave 2 - for later...deadline for wave 2 is 30.June.2014 Best Markus --- Here the table: Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester completion date Apps - WP3 Application Mashup Wirecloud YES NO SAP DONE 24.04.2014 Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Registry Registry - SAP RI R3.2 YES NO ATOS - to be confirmed - assigned by WPL Repository Repository - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Revenue Settlement and Sharing System Revenue Settlement and Sharing System R3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds (Koen) - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore R3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner DONE 24.04.2014 From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Wed Apr 30 12:58:32 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 30 Apr 2014 10:58:32 +0000 Subject: [Fiware-apps] FW: Agile dynamic: Closing Sprint 3.4.1 - LAST CALL In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90BDAE34F9B@EX10-MB1-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90BDAE34F9B@EX10-MB1-MAD.hi.inet> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD36E57@DEWDFEMB14A.global.corp.sap> FYI From: fiware-ge-owners-bounces at lists.fi-ware.org [mailto:fiware-ge-owners-bounces at lists.fi-ware.org] On Behalf Of MANUEL ESCRICHE VICENTE Sent: Mittwoch, 30. April 2014 12:01 To: fiware-ge-owners at lists.fi-ware.org Cc: fiware-wpl at lists.fi-ware.org; fiware-wpa at lists.fi-ware.org Subject: [Fiware-ge-owners] Agile dynamic: Closing Sprint 3.4.1 - LAST CALL Dear Partners: Let me remind you that today we close Sprint 3.4.1. Please, proceed to close those backlog items finished during this month. Right now, activity seems very low. (Remind you I'm working on crossing backlog and effort reported - I hope I'll be able to share those reports next month) Today at 18:00 I'll take due snapshot. Current status: Apps https://forge.fi-ware.org/docman/view.php/27/3853/FIWARE.backlog.apps.dashboard.20140430.xlsx [cid:image001.png at 01CF646A.AFC92620] Cloud https://forge.fi-ware.org/docman/view.php/27/3854/FIWARE.backlog.cloud.dashboard.20140430.xlsx [cid:image002.png at 01CF646B.28E3F4E0] IoT https://forge.fi-ware.org/docman/view.php/27/3855/FIWARE.backlog.iot.dashboard.20140430.xlsx [cid:image003.png at 01CF646B.28E3F4E0] Data https://forge.fi-ware.org/docman/view.php/27/3856/FIWARE.backlog.data.dashboard.20140430.xlsx [cid:image004.png at 01CF646B.28E3F4E0] I2ND https://forge.fi-ware.org/docman/view.php/27/3857/FIWARE.backlog.i2nd.dashboard.20140430.xlsx [cid:image005.png at 01CF646B.28E3F4E0] Security https://forge.fi-ware.org/docman/view.php/27/3858/FIWARE.backlog.security.dashboard.20140430.xlsx [cid:image006.png at 01CF646B.28E3F4E0] Miwi https://forge.fi-ware.org/docman/view.php/27/3859/FIWARE.backlog.miwi.dashboard.20140430.xlsx [cid:image007.png at 01CF646B.55490200] Backlog reviews: https://forge.fi-ware.org/docman/view.php/27/3860/FIWARE.backlog.apps.review.20140430.xlsx https://forge.fi-ware.org/docman/view.php/27/3861/FIWARE.backlog.cloud.review.20140430.xlsx https://forge.fi-ware.org/docman/view.php/27/3862/FIWARE.backlog.iot.review.20140430.xlsx https://forge.fi-ware.org/docman/view.php/27/3863/FIWARE.backlog.data.review.20140430.xlsx https://forge.fi-ware.org/docman/view.php/27/3864/FIWARE.backlog.i2nd.review.20140430.xlsx https://forge.fi-ware.org/docman/view.php/27/3865/FIWARE.backlog.security.review.20140430.xlsx https://forge.fi-ware.org/docman/view.php/27/3866/FIWARE.backlog.miwi.review.20140430.xlsx Thanks for cooperation!! If anything, please, don't hesitate to let me know. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 110875 bytes Desc: not available URL: From markus.heller at sap.com Wed Apr 30 13:09:02 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 30 Apr 2014 11:09:02 +0000 Subject: [Fiware-apps] WP3: FYI Alessandra now subscribed to WP3 mailing list Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD36E9F@DEWDFEMB14A.global.corp.sap> Hi all, FI Please note that I have added Alessandra Toninelli (ENG) to our WP3 mailing list, she will receive all mails from now on also. Her mail address is: Alessandra Toninelli (alessandra.toninelli at eng.it) Best Markus -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 5223 bytes Desc: not available URL: From koen.casier at intec.ugent.be Wed Apr 30 14:00:02 2014 From: koen.casier at intec.ugent.be (koen casier) Date: Wed, 30 Apr 2014 14:00:02 +0200 Subject: [Fiware-apps] Current State on "GEis installation and test" for WP3 In-Reply-To: <7192_1398848221_5360BADC_7192_1825_1_8F1D40232A0E68409E3FC23A30C326620169C2983A19@THSONEA01CMS04P.one.grp> References: <393554EDCF801348BC53C7813C6CB73B1AD36481@DEWDFEMB14A.global.corp.sap> <47637E3E5662AD4B9B640BA60ADB4314044C9F@DEFTHW99EX2MSX.ww931.my-it-solutions.net> <393554EDCF801348BC53C7813C6CB73B1AD36D7C@DEWDFEMB14A.global.corp.sap> <7192_1398848221_5360BADC_7192_1825_1_8F1D40232A0E68409E3FC23A30C326620169C2983A19@THSONEA01CMS04P.one.grp> Message-ID: <5360E5C2.7090707@intec.ugent.be> Dear Markus, Daniel, I typically start from a fresh VM (I have used both linux and windows in the past), and the total installation takes only 10 minutes to complete. The installation manual mentions a JBoss wildfly as preferred installation, and I imagined an up to date java installation of course. The offline version is only intended for constructing models in testing phase, all calculations are intended always to be made in online mode. The unit tests and documentation clearly show how to build a minimal model. I've performed a clean installation some minutes ago, and this is again working without any problems, although some warnings are given in the log-files (which were mentioned in the mail from Phong as well). These are typically for debugging purposes and should not be interpreted as such. The file not found is actually an indication that this file is not found, still the code is proceeding beyond this point. best regards, Koen On 4/30/2014 10:57 AM, GIDOIN Daniel wrote: > > Dear Markus, > > Since yesterday, Phong is working to test Business Calculator but we > are faced with issues (Jboss and java version and licencing, the off > line don't operate, we have not models....). The problems pile up! > > It's very discouraging! > > Best regards > > Daniel > > *De :*fiware-apps-bounces at lists.fi-ware.org > [mailto:fiware-apps-bounces at lists.fi-ware.org] *De la part de* Heller, > Markus > *Envoy? :* mercredi 30 avril 2014 10:44 > *? :* FI-WARE Apps (fiware-apps at lists.fi-ware.org) > *Objet :* Re: [Fiware-apps] Current State on "GEis installation and > test" for WP3 > > Hi Joaquin, > > Thank you, I have sent it to Stefano and Thorsten Sandfuchs (attachment). > > Current state: > > For *M36 wave 1* these open items are as far as I can see: > > Light Semantic Composition Editor > > > > COMPEL > > > > > YES > > > > NO > > > > iMinds (Camille) > > > > Service Mashup > > > > Mashup Factory > > > > > > > iMinds (Koen) > > > > Business Calculator > > > > Business Calculator > > > > > > > THALES > > > > New Table: > > *Chapter* > > > > *GE* > > > > *GEi* > > > > *Release to test* > > > > *Testing applies?* > > > > *Testing on FI-Lab?* > > > > *Assigned tester* > > > > *completion date* > > Apps - WP3 > > > > Application Mashup > > > > Wirecloud > > > > > YES > > > > NO > > > > SAP > > > > DONE 24.04.2014 > > > > > Light Semantic Composition Editor > > > > COMPEL > > > > > YES > > > > NO > > > > iMinds (Camille) -- to be confirmed -- assigned by WPL > > > > > > Marketplace > > > > Marketplace - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > UPM -- to be confirmed -- assigned by WPL -- UPM did it before so > report could be written about this > > > > DONE 28.04.2014 > > > > > Mediator > > > > Mediator > > > > > > > SAP --confirmed -- release and conditions to be defined by GE owner > > > > DONE 29.04.2014 > > > > > Mediator > > > > SETHA2 > > > > > > > SAP -- confirmed -- release and conditions to be defined by GE owner > > > > DONE 29.04.2014 > > > > > Registry > > > > Registry - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > ATOS -- to be confirmed -- assigned by WPL > > > > DONE 30.04.2014 > > > > > Repository > > > > Repository - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > UPM -- to be confirmed -- assigned by WPL -- UPM did it before so > report could be written about this > > > > DONE 28.04.2014 > > > > > Revenue Settlement and Sharing System > > > > Revenue Settlement and Sharing System > > > > R3.3 > > > > YES > > > > NO > > > > UPM -- confirmed (later - for 30.June) > > > > > > Service Composition > > > > Ericsson Composition Engine (ECE) > > > > > > > TBD > > > > > > Service Mashup > > > > Mashup Factory > > > > > > > iMinds (Koen) -- to be confirmed -- assigned by WPL -- release and > conditions to be defined by GE owner > > > > > > Store > > > > WStore > > > > R3.3 > > > > YES > > > > NO > > > > TID -- confirmed > > > > > > Business Calculator > > > > Business Calculator > > > > > > > THALES -- to be confirmed -- assigned by WPL -- release and conditions > to be defined by GE owner > > > > > > Business Modeler > > > > Business Modeler > > > > > > > TI -- to be confirmed -- assigned by WPL -- release and conditions to > be defined by GE owner > > > > DONE 24.04.2014 > > Best > > Markus > > *From:*Iranzo Yuste, Joaquin [mailto:joaquin.iranzo at atos.net] > *Sent:* Mittwoch, 30. April 2014 09:11 > *To:* Heller, Markus > *Subject:* RE: Current State on "GEis installation and test" for WP3 > > Hi Markus, > > I want to send you our installation and test document for the Registry GE. > > Regards, > > Joaquin. > > *From:*fiware-apps-bounces at lists.fi-ware.org > > [mailto:fiware-apps-bounces at lists.fi-ware.org] *On Behalf Of *Heller, > Markus > *Sent:* Tuesday, April 29, 2014 5:54 PM > *To:* FI-WARE Apps (fiware-apps at lists.fi-ware.org > ) > *Subject:* [Fiware-apps] Current State on "GEis installation and test" > for WP3 > > Hi all, > > I have collected the current state for GE test reports is as follows > (attachment with all reports so far FYI) > > For *M36 wave 1* these open items are as far as I can see: > > Light Semantic Composition Editor > > > > COMPEL > > > > > YES > > > > NO > > > > iMinds (Camille) > > > > Service Mashup > > > > Mashup Factory > > > > > > > iMinds (Koen) > > > > Business Calculator > > > > Business Calculator > > > > > > > THALES > > > > ?Please send your missing test reports as soon as possible. > > The rest of the tests is *wave 2* -- for later...deadline for wave 2 > is 30.June.2014 > > Best > > Markus > > --- > > Here the table: > > *Chapter* > > > > *GE* > > > > *GEi* > > > > *Release to test* > > > > *Testing applies?* > > > > *Testing on FI-Lab?* > > > > *Assigned tester* > > > > *completion date* > > Apps - WP3 > > > > Application Mashup > > > > Wirecloud > > > > > YES > > > > NO > > > > SAP > > > > DONE 24.04.2014 > > > > > Light Semantic Composition Editor > > > > COMPEL > > > > > YES > > > > NO > > > > iMinds (Camille) -- to be confirmed -- assigned by WPL > > > > > > Marketplace > > > > Marketplace - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > UPM -- to be confirmed -- assigned by WPL -- UPM did it before so > report could be written about this > > > > DONE 28.04.2014 > > > > > Mediator > > > > Mediator > > > > > > > SAP --confirmed -- release and conditions to be defined by GE owner > > > > DONE 29.04.2014 > > > > > Mediator > > > > SETHA2 > > > > > > > SAP -- confirmed -- release and conditions to be defined by GE owner > > > > DONE 29.04.2014 > > > > > Registry > > > > Registry - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > ATOS -- to be confirmed -- assigned by WPL > > > > > > Repository > > > > Repository - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > UPM -- to be confirmed -- assigned by WPL -- UPM did it before so > report could be written about this > > > > DONE 28.04.2014 > > > > > Revenue Settlement and Sharing System > > > > Revenue Settlement and Sharing System > > > > R3.3 > > > > YES > > > > NO > > > > UPM -- confirmed (later - for 30.June) > > > > > > Service Composition > > > > Ericsson Composition Engine (ECE) > > > > > > > TBD > > > > > > Service Mashup > > > > Mashup Factory > > > > > > > iMinds (Koen) -- to be confirmed -- assigned by WPL -- release and > conditions to be defined by GE owner > > > > > > Store > > > > WStore > > > > R3.3 > > > > YES > > > > NO > > > > TID -- confirmed > > > > > > Business Calculator > > > > Business Calculator > > > > > > > THALES -- to be confirmed -- assigned by WPL -- release and conditions > to be defined by GE owner > > > > > > Business Modeler > > > > Business Modeler > > > > > > > TI -- to be confirmed -- assigned by WPL -- release and conditions to > be defined by GE owner > > > > DONE 24.04.2014 > > *From:*fiware-wpl-bounces at lists.fi-ware.org > > [mailto:fiware-wpl-bounces at lists.fi-ware.org] *On Behalf Of *stefano > de panfilis > *Sent:* Dienstag, 8. April 2014 20:32 > *To:* fiware-wpl at lists.fi-ware.eu > ; fiware-wpa at lists.fi-ware.eu > > *Subject:* [Fiware-wpl] URGENT: GEis installation and test > > dear all, > > as discussed yesterday during our call and refined this morning in the > wp10 call, here is the procedure to install and test the geis as > requested in the scope of recommendation 18 of the review report 6 > excerpt of which is "/Obviously, hardly any of the documentation can > claim completeness in the remaining time, but should at least cover > all known grounds. To this end, extensive and directed installation > and usage tests should be performed -- not only through the Use Case > projects, but also within the consortium. For example, partners not > involved in the development of a specific Generic Enabler can verify > it through installation and testing. The according results and > findings should be incorporated in the forthcoming Release 3 and the > validation reporting of deliverable D10.5.3/." > > the wpl migth already have received at this time an invitation from me > to access a googledoc (here again the link for your convenience: > https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) > > this doc contains all the geis implemented at the moment or in the > very near future. > > 1. each wpl must, within this friday (11 april 2014), fill, in > agreement with their wp participants, the name of the organisation > responsible for installing a testing a specific gei. in addition the > wpl should declare which geis will be tested. the overal rules are: > > 1.1 no geis of wp4 for what concerns fi-lab installation and test > > 1.2 only the geis of wp7 which do not require special network environment > > 1.3 no geis for which do not exist an oss version > > 2. within 25 april 2014 all the installations and tests must be > completed either by the organisations leaving the project at m36, and > by those organisation if a test assigned to them involve a gei owned > by an organisation leaving the project at m36. > > 3. all the remaining installations and tests must be fulfilled by 30 > june 2014. > > the installation and tests must be documented using the form described > in the attached document. > > please note that, as you can easily guess from point 1 above, there > are two different kind of installations to be tested: > > 1. manual deplyoment, which involves all oss released geis > > 2. recipes supported deployment in the fi-ware testbed. this case the > person making the test must create a vm, which should be removed > immediately after the installation and test is completed (due to the > obvious resource cosumption) > > it would be great if the persons who will make the installation and > tests are completely outside the fi-ware environment. > > this procedure refines and superseeds what sent by thorsten, thank you > for triggering the process, on last wednesday. > > for any clarification you migth need, please do not hesitate to > contact me. > > ciao, > > stefano > > -- > > Stefano De Panfilis > Chief Innovation Officer > Engineering Ingegneria Informatica S.p.A. > via Riccardo Morandi 32 > 00148 Roma > Italy > > tel (direct): +39-068307-4295 > tel (secr.): +39-068307-4513 > fax: +39-068307-4200 > cell: +39-335-7542-567 > > skype: depa01 > > > > _______________________________________________ > Fiware-apps mailing list > Fiware-apps at lists.fi-ware.org > https://lists.fi-ware.org/listinfo/fiware-apps -------------- next part -------------- An HTML attachment was scrubbed... URL: From markus.heller at sap.com Wed Apr 30 16:25:43 2014 From: markus.heller at sap.com (Heller, Markus) Date: Wed, 30 Apr 2014 14:25:43 +0000 Subject: [Fiware-apps] Current State on "GEis installation and test" for WP3 In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD36D7C@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD36481@DEWDFEMB14A.global.corp.sap> <47637E3E5662AD4B9B640BA60ADB4314044C9F@DEFTHW99EX2MSX.ww931.my-it-solutions.net> <393554EDCF801348BC53C7813C6CB73B1AD36D7C@DEWDFEMB14A.global.corp.sap> Message-ID: <393554EDCF801348BC53C7813C6CB73B1AD3716B@DEWDFEMB14A.global.corp.sap> Hi all, Thanks to Camille, COMPEL was tested by iMinds (Attachment) New state: For M36 wave 1 these open items are as far as I can see: Service Mashup Mashup Factory iMinds (Koen) Business Calculator Business Calculator THALES New Table: Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester completion date Apps - WP3 Application Mashup Wirecloud YES NO SAP DONE 24.04.2014 Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL DONE 30.04.2014 Marketplace Marketplace - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Registry Registry - SAP RI R3.2 YES NO ATOS - to be confirmed - assigned by WPL DONE 30.04.2014 Repository Repository - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Revenue Settlement and Sharing System Revenue Settlement and Sharing System R3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds (Koen) - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore R3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner DONE 24.04.2014 Best Markus From: Iranzo Yuste, Joaquin [mailto:joaquin.iranzo at atos.net] Sent: Mittwoch, 30. April 2014 09:11 To: Heller, Markus Subject: RE: Current State on "GEis installation and test" for WP3 Hi Markus, I want to send you our installation and test document for the Registry GE. Regards, Joaquin. From: fiware-apps-bounces at lists.fi-ware.org [mailto:fiware-apps-bounces at lists.fi-ware.org] On Behalf Of Heller, Markus Sent: Tuesday, April 29, 2014 5:54 PM To: FI-WARE Apps (fiware-apps at lists.fi-ware.org) Subject: [Fiware-apps] Current State on "GEis installation and test" for WP3 Hi all, I have collected the current state for GE test reports is as follows (attachment with all reports so far FYI) For M36 wave 1 these open items are as far as I can see: Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) Service Mashup Mashup Factory iMinds (Koen) Business Calculator Business Calculator THALES --> Please send your missing test reports as soon as possible. The rest of the tests is wave 2 - for later...deadline for wave 2 is 30.June.2014 Best Markus --- Here the table: Chapter GE GEi Release to test Testing applies? Testing on FI-Lab? Assigned tester completion date Apps - WP3 Application Mashup Wirecloud YES NO SAP DONE 24.04.2014 Light Semantic Composition Editor COMPEL YES NO iMinds (Camille) - to be confirmed - assigned by WPL Marketplace Marketplace - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Mediator Mediator SAP -confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Mediator SETHA2 SAP - confirmed - release and conditions to be defined by GE owner DONE 29.04.2014 Registry Registry - SAP RI R3.2 YES NO ATOS - to be confirmed - assigned by WPL Repository Repository - SAP RI R3.2 YES NO UPM - to be confirmed - assigned by WPL - UPM did it before so report could be written about this DONE 28.04.2014 Revenue Settlement and Sharing System Revenue Settlement and Sharing System R3.3 YES NO UPM - confirmed (later - for 30.June) Service Composition Ericsson Composition Engine (ECE) TBD Service Mashup Mashup Factory iMinds (Koen) - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Store WStore R3.3 YES NO TID - confirmed Business Calculator Business Calculator THALES - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner Business Modeler Business Modeler TI - to be confirmed - assigned by WPL - release and conditions to be defined by GE owner DONE 24.04.2014 From: fiware-wpl-bounces at lists.fi-ware.org [mailto:fiware-wpl-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Dienstag, 8. April 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpl] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is "Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed - not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3." the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: I10.2_Installation_and_Test_Light Semantic Composition GE - ATOS tested by iMinds.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 234086 bytes Desc: I10.2_Installation_and_Test_Light Semantic Composition GE - ATOS tested by iMinds.docx URL: From koen.casier at intec.ugent.be Wed Apr 30 17:27:37 2014 From: koen.casier at intec.ugent.be (koen casier) Date: Wed, 30 Apr 2014 17:27:37 +0200 Subject: [Fiware-apps] Current State on "GEis installation and test" for WP3 In-Reply-To: <393554EDCF801348BC53C7813C6CB73B1AD3716B@DEWDFEMB14A.global.corp.sap> References: <393554EDCF801348BC53C7813C6CB73B1AD36481@DEWDFEMB14A.global.corp.sap> <47637E3E5662AD4B9B640BA60ADB4314044C9F@DEFTHW99EX2MSX.ww931.my-it-solutions.net> <393554EDCF801348BC53C7813C6CB73B1AD36D7C@DEWDFEMB14A.global.corp.sap> <393554EDCF801348BC53C7813C6CB73B1AD3716B@DEWDFEMB14A.global.corp.sap> Message-ID: <53611669.70900@intec.ugent.be> Dear Markus, As there are problems reaching the service mashup factory today (I am not authorized to reach the running instance and the people from the mashup factory are trying to solve this issue), I will not be able to test this service by the end of april. Would it be possible to give the people from the mashup factory an extension on this test-plan so they can give me the required rights, and so I will have the time to test the service. Considering the business calculator, there were some smaller misunderstandings in the installation, and in using the toolkit. As far as I understood the people from Thales have installed and tested the editor, the repository, the calculator hub and the specific instantiations for ECMN, BPMN and Revenue modeling successfully (as I got a working screenshot). This leaves two tests open considering the hierarchical network structure (PNMN) model. I am quite sure that this will be solved soon as well. best regards, Koen On 4/30/2014 4:25 PM, Heller, Markus wrote: > > Hi all, > > Thanks to Camille, COMPEL was tested by iMinds (Attachment) > > New state: > > For *M36 wave 1* these open items are as far as I can see: > > Service Mashup > > > > Mashup Factory > > > > > > > iMinds (Koen) > > > > Business Calculator > > > > Business Calculator > > > > > > > THALES > > > > New Table: > > *Chapter* > > > > *GE* > > > > *GEi* > > > > *Release to test* > > > > *Testing applies?* > > > > *Testing on FI-Lab?* > > > > *Assigned tester* > > > > *completion date* > > Apps - WP3 > > > > Application Mashup > > > > Wirecloud > > > > > YES > > > > NO > > > > SAP > > > > DONE 24.04.2014 > > > > > Light Semantic Composition Editor > > > > COMPEL > > > > > YES > > > > NO > > > > iMinds (Camille) -- to be confirmed -- assigned by WPL > > > > DONE 30.04.2014 > > > > > Marketplace > > > > Marketplace - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > UPM -- to be confirmed -- assigned by WPL -- UPM did it before so > report could be written about this > > > > DONE 28.04.2014 > > > > > Mediator > > > > Mediator > > > > > > > SAP --confirmed -- release and conditions to be defined by GE owner > > > > DONE 29.04.2014 > > > > > Mediator > > > > SETHA2 > > > > > > > SAP -- confirmed -- release and conditions to be defined by GE owner > > > > DONE 29.04.2014 > > > > > Registry > > > > Registry - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > ATOS -- to be confirmed -- assigned by WPL > > > > DONE 30.04.2014 > > > > > Repository > > > > Repository - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > UPM -- to be confirmed -- assigned by WPL -- UPM did it before so > report could be written about this > > > > DONE 28.04.2014 > > > > > Revenue Settlement and Sharing System > > > > Revenue Settlement and Sharing System > > > > R3.3 > > > > YES > > > > NO > > > > UPM -- confirmed (later - for 30.June) > > > > > > Service Composition > > > > Ericsson Composition Engine (ECE) > > > > > > > TBD > > > > > > Service Mashup > > > > Mashup Factory > > > > > > > iMinds (Koen) -- to be confirmed -- assigned by WPL -- release and > conditions to be defined by GE owner > > > > > > Store > > > > WStore > > > > R3.3 > > > > YES > > > > NO > > > > TID -- confirmed > > > > > > Business Calculator > > > > Business Calculator > > > > > > > THALES -- to be confirmed -- assigned by WPL -- release and conditions > to be defined by GE owner > > > > > > Business Modeler > > > > Business Modeler > > > > > > > TI -- to be confirmed -- assigned by WPL -- release and conditions to > be defined by GE owner > > > > DONE 24.04.2014 > > Best > > Markus > > *From:*Iranzo Yuste, Joaquin [mailto:joaquin.iranzo at atos.net] > *Sent:* Mittwoch, 30. April 2014 09:11 > *To:* Heller, Markus > *Subject:* RE: Current State on "GEis installation and test" for WP3 > > Hi Markus, > > I want to send you our installation and test document for the Registry GE. > > Regards, > > Joaquin. > > *From:*fiware-apps-bounces at lists.fi-ware.org > > [mailto:fiware-apps-bounces at lists.fi-ware.org] *On Behalf Of *Heller, > Markus > *Sent:* Tuesday, April 29, 2014 5:54 PM > *To:* FI-WARE Apps (fiware-apps at lists.fi-ware.org > ) > *Subject:* [Fiware-apps] Current State on "GEis installation and test" > for WP3 > > Hi all, > > I have collected the current state for GE test reports is as follows > (attachment with all reports so far FYI) > > For *M36 wave 1* these open items are as far as I can see: > > Light Semantic Composition Editor > > > > COMPEL > > > > > YES > > > > NO > > > > iMinds (Camille) > > > > Service Mashup > > > > Mashup Factory > > > > > > > iMinds (Koen) > > > > Business Calculator > > > > Business Calculator > > > > > > > THALES > > > > ?Please send your missing test reports as soon as possible. > > The rest of the tests is *wave 2* -- for later...deadline for wave 2 > is 30.June.2014 > > Best > > Markus > > --- > > Here the table: > > *Chapter* > > > > *GE* > > > > *GEi* > > > > *Release to test* > > > > *Testing applies?* > > > > *Testing on FI-Lab?* > > > > *Assigned tester* > > > > *completion date* > > Apps - WP3 > > > > Application Mashup > > > > Wirecloud > > > > > YES > > > > NO > > > > SAP > > > > DONE 24.04.2014 > > > > > Light Semantic Composition Editor > > > > COMPEL > > > > > YES > > > > NO > > > > iMinds (Camille) -- to be confirmed -- assigned by WPL > > > > > > Marketplace > > > > Marketplace - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > UPM -- to be confirmed -- assigned by WPL -- UPM did it before so > report could be written about this > > > > DONE 28.04.2014 > > > > > Mediator > > > > Mediator > > > > > > > SAP --confirmed -- release and conditions to be defined by GE owner > > > > DONE 29.04.2014 > > > > > Mediator > > > > SETHA2 > > > > > > > SAP -- confirmed -- release and conditions to be defined by GE owner > > > > DONE 29.04.2014 > > > > > Registry > > > > Registry - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > ATOS -- to be confirmed -- assigned by WPL > > > > > > Repository > > > > Repository - SAP RI > > > > R3.2 > > > > YES > > > > NO > > > > UPM -- to be confirmed -- assigned by WPL -- UPM did it before so > report could be written about this > > > > DONE 28.04.2014 > > > > > Revenue Settlement and Sharing System > > > > Revenue Settlement and Sharing System > > > > R3.3 > > > > YES > > > > NO > > > > UPM -- confirmed (later - for 30.June) > > > > > > Service Composition > > > > Ericsson Composition Engine (ECE) > > > > > > > TBD > > > > > > Service Mashup > > > > Mashup Factory > > > > > > > iMinds (Koen) -- to be confirmed -- assigned by WPL -- release and > conditions to be defined by GE owner > > > > > > Store > > > > WStore > > > > R3.3 > > > > YES > > > > NO > > > > TID -- confirmed > > > > > > Business Calculator > > > > Business Calculator > > > > > > > THALES -- to be confirmed -- assigned by WPL -- release and conditions > to be defined by GE owner > > > > > > Business Modeler > > > > Business Modeler > > > > > > > TI -- to be confirmed -- assigned by WPL -- release and conditions to > be defined by GE owner > > > > DONE 24.04.2014 > > *From:*fiware-wpl-bounces at lists.fi-ware.org > > [mailto:fiware-wpl-bounces at lists.fi-ware.org] *On Behalf Of *stefano > de panfilis > *Sent:* Dienstag, 8. April 2014 20:32 > *To:* fiware-wpl at lists.fi-ware.eu > ; fiware-wpa at lists.fi-ware.eu > > *Subject:* [Fiware-wpl] URGENT: GEis installation and test > > dear all, > > as discussed yesterday during our call and refined this morning in the > wp10 call, here is the procedure to install and test the geis as > requested in the scope of recommendation 18 of the review report 6 > excerpt of which is "/Obviously, hardly any of the documentation can > claim completeness in the remaining time, but should at least cover > all known grounds. To this end, extensive and directed installation > and usage tests should be performed -- not only through the Use Case > projects, but also within the consortium. For example, partners not > involved in the development of a specific Generic Enabler can verify > it through installation and testing. The according results and > findings should be incorporated in the forthcoming Release 3 and the > validation reporting of deliverable D10.5.3/." > > the wpl migth already have received at this time an invitation from me > to access a googledoc (here again the link for your convenience: > https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) > > this doc contains all the geis implemented at the moment or in the > very near future. > > 1. each wpl must, within this friday (11 april 2014), fill, in > agreement with their wp participants, the name of the organisation > responsible for installing a testing a specific gei. in addition the > wpl should declare which geis will be tested. the overal rules are: > > 1.1 no geis of wp4 for what concerns fi-lab installation and test > > 1.2 only the geis of wp7 which do not require special network environment > > 1.3 no geis for which do not exist an oss version > > 2. within 25 april 2014 all the installations and tests must be > completed either by the organisations leaving the project at m36, and > by those organisation if a test assigned to them involve a gei owned > by an organisation leaving the project at m36. > > 3. all the remaining installations and tests must be fulfilled by 30 > june 2014. > > the installation and tests must be documented using the form described > in the attached document. > > please note that, as you can easily guess from point 1 above, there > are two different kind of installations to be tested: > > 1. manual deplyoment, which involves all oss released geis > > 2. recipes supported deployment in the fi-ware testbed. this case the > person making the test must create a vm, which should be removed > immediately after the installation and test is completed (due to the > obvious resource cosumption) > > it would be great if the persons who will make the installation and > tests are completely outside the fi-ware environment. > > this procedure refines and superseeds what sent by thorsten, thank you > for triggering the process, on last wednesday. > > for any clarification you migth need, please do not hesitate to > contact me. > > ciao, > > stefano > > -- > > Stefano De Panfilis > Chief Innovation Officer > Engineering Ingegneria Informatica S.p.A. > via Riccardo Morandi 32 > 00148 Roma > Italy > > tel (direct): +39-068307-4295 > tel (secr.): +39-068307-4513 > fax: +39-068307-4200 > cell: +39-335-7542-567 > > skype: depa01 > > > > _______________________________________________ > Fiware-apps mailing list > Fiware-apps at lists.fi-ware.org > https://lists.fi-ware.org/listinfo/fiware-apps -------------- next part -------------- An HTML attachment was scrubbed... URL: