From GLIKSON at il.ibm.com Tue Oct 1 14:51:44 2013 From: GLIKSON at il.ibm.com (Alex Glikson) Date: Tue, 1 Oct 2013 14:51:44 +0200 Subject: [Fiware-cloud] Fw: [Fiware-wpl] Agile dynamic - release and sprint closing -> request for cooperation Message-ID: Dear all, Reviewers have been complaining for the last 2 years regarding the traceability of our agile process. Now we finally have the tooling to conveniently see the agile metrics (thanks to Manuel's scripts). It is very important to make sure that the reports for our GEs look good. We will review the report at our upcoming meeting on Wed. In a nutshell, the 'actual' graph on Sprint Burndown chart of each GE (and of the entire chapter, on the 'dashboard' tab) should gradually go from some reasonable number of items down to zero (X axis is the days of the sprint), and the 'closed' graph on the Release Burnup (called 'flow' in the spreadsheet) chart should go up every sprint, converging with the 'opened' graph in projection towards the end of the project. Regards, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 ----- Forwarded by Alex Glikson/Haifa/IBM on 01/10/2013 01:52 PM ----- From: MANUEL ESCRICHE VICENTE To: "fiware-ge-owners at lists.fi-ware.eu" , "fiware-wpl at lists.fi-ware.eu" , "fiware-wpa at lists.fi-ware.eu" , Date: 01/10/2013 01:09 PM Subject: [Fiware-wpl] Agile dynamic - release and sprint closing -> request for cooperation Sent by: fiware-wpl-bounces at lists.fi-ware.eu Dear Partners, Find linked the dashboards produced to capture the release and sprint closing. https://forge.fi-ware.eu/docman/view.php/27/2859/FIWARE.backlog.apps.dashboard.20130930-1802.xlsx https://forge.fi-ware.eu/docman/view.php/27/2860/FIWARE.backlog.cloud.dashboard.20130930-1802.xlsx https://forge.fi-ware.eu/docman/view.php/27/2863/FIWARE.backlog.iot.dashboard.20130930-1803.xlsx https://forge.fi-ware.eu/docman/view.php/27/2861/FIWARE.backlog.data.dashboard.20130930-1802.xlsx https://forge.fi-ware.eu/docman/view.php/27/2862/FIWARE.backlog.i2nd.dashboard.20130930-1802.xlsx https://forge.fi-ware.eu/docman/view.php/27/2864/FIWARE.backlog.security.dashboard.20130930-1803.xlsx After having a look at the burndown diagrams mainly, which show how items were closed over time, I see many GEi onwers didn?t perform any action to close the release or sprint. I?d need to know the reasons preventing those GEi onwers to close their items properly. In general I think we need to come to the right agile dynamic as soon as possible. I can also appreciate that some GEi owners in the following chapters Data, Security and I2ND did close the corresponding items properly, what I thank them for. The agile methodology gives flexibility when you set up your backlog, it means at the sprint planning. Afterwards, it needs us to be diligent and keep committed to the backlog. I wonder whether any of you had a chance to pay attention to the review report from the EC and read the comments related to the backlog. I?ll be following the agile dynamic closely so as to demonstrate the EC that FI-WARE is working properly. In these regards, next backlog deliverable may be structured on a GE Implementation bases with views of your burn down and flow charts. In general, following the agile dynamic I think it?s a shared objective, so I need to ask for your cooperation to overcome the current situation. I?m also requesting the Work Package Leaders to include in your weekly agendas a time slot for backlog maintenance. Thanks in advance for cooperation!! If anything, please, don?t hesitate to let me know. Kind regards Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-wpl mailing list Fiware-wpl at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-wpl -------------- next part -------------- An HTML attachment was scrubbed... URL: From GLIKSON at il.ibm.com Fri Oct 4 12:07:23 2013 From: GLIKSON at il.ibm.com (Alex Glikson) Date: Fri, 4 Oct 2013 12:07:23 +0200 Subject: [Fiware-cloud] Fw: [Fiware-wpl] Agile dynamic - closing sprint planning - day 7 at 18:00 CET Message-ID: See below. Regards, Alex ----- Forwarded by Alex Glikson/Haifa/IBM on 04/10/2013 01:06 PM ----- From: MANUEL ESCRICHE VICENTE To: "fiware-ge-owners at lists.fi-ware.eu" , Cc: "fiware-wpl at lists.fi-ware.eu" , "fiware-wpa at lists.fi-ware.eu" Date: 04/10/2013 11:50 AM Subject: [Fiware-wpl] Agile dynamic - closing sprint planning - day 7 at 18:00 CET Sent by: fiware-wpl-bounces at lists.fi-ware.eu Dear Partners, Let me inform you that we are closing the sprint planning time slot on day 7 at 18:00 CET. Please, have it ready before that time because I?ll get them a snapshot of the trackers and wiki to review the content with your corresponding WP Leaders. Thanks for cooperation!! If anything, please, let me know. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-wpl mailing list Fiware-wpl at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-wpl -------------- next part -------------- An HTML attachment was scrubbed... URL: From GLIKSON at il.ibm.com Tue Oct 8 15:32:22 2013 From: GLIKSON at il.ibm.com (Alex Glikson) Date: Tue, 8 Oct 2013 16:32:22 +0300 Subject: [Fiware-cloud] tomorrow's meeting Message-ID: Dear all, Here are the topics I would like to discuss tomorrow: 1. status of integration of Portal & IdM with Grizzly (hopefully someone from UPM will be able to join?) 2. roadmap for the 3rd release 3. status of the backlog 4. misc Please, let me know if there are other topics you would like to discuss. Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 -------------- next part -------------- An HTML attachment was scrubbed... URL: From GLIKSON at il.ibm.com Wed Oct 16 15:01:30 2013 From: GLIKSON at il.ibm.com (Alex Glikson) Date: Wed, 16 Oct 2013 16:01:30 +0300 Subject: [Fiware-cloud] Fw: FI-WARE: WP4 - weekly backlog snapshot Message-ID: Dear all, Please, give high priority to updating the tracker, as per Manuel's report. 1.Go to the tab of your GE in the 'Dashboard' spreadsheet. Scroll down, look for rows with status in Red in column D, figure out what the problem is, and fix it. I see issues for all the GEs. Make sure the 'workflow state' is accurate. E.g., stories should move to 'scheduled' state when assigned to a sprint (unfortunately, tracker can't do it automatically). All the stories associated previously assigned to a previous state, should be either 'closed' or re-assigned to current sprint and stay 'scheduled'. Same for features and releases. 2. In the "report" spreadsheet, take care of T-C1 and T-C2 errors (they might overlap with those mentioned above). Regards, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 ----- Forwarded by Alex Glikson/Haifa/IBM on 14/10/2013 03:35 PM ----- From: MANUEL ESCRICHE VICENTE To: Alex Glikson/Haifa/IBM at IBMIL, Date: 14/10/2013 01:36 PM Subject: FI-WARE: WP4 - weekly backlog snapshot Hi Alex, Find below links to the dashboard [1] and review [2] from the snapshot taken today. During the week 15 items were changed. In the dashboard, there?s Monitoring, ObjectStorage and Service Manager with nothing scheduled for this sprint, and quite a number of items whose states need to be reviewed (they are marked red now) There?s no progress on the review report. Kind regards, Manuel [1]: https://forge.fi-ware.eu/docman/view.php/27/2901/FIWARE.backlog.cloud.dashboard.20131014-0934.xlsx [2]: https://forge.fi-ware.eu/docman/view.php/27/2907/FIWARE.backlog.cloud.review.20131014-0932.xlsx ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/png Size: 26229 bytes Desc: not available URL: From GLIKSON at il.ibm.com Thu Oct 17 14:50:07 2013 From: GLIKSON at il.ibm.com (Alex Glikson) Date: Thu, 17 Oct 2013 15:50:07 +0300 Subject: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) Message-ID: As discussed during the call yesterday, please, send me your contributions to the WP4 periodic report, referring to months 25-30, by Tue EOB next week (October 22nd). Main themes that I recall: General (I will fill in the details in the report): - Release 2 of deliverables - Testbed, OIL, Catalogue, Campus Party, hackatons - XiFi interlock Task 4.1: - Intel: Object Storage (CDMI, spec, etc), DCRM (trusted pools in OpenStack Nova) - IBM: Object Storage (Swift enhancements), DCRM (DOVE virtual networking) Task 4.2: - IBM: DCRM (OpenStack, Pulsar scheduler, VM HA, Neutron DOVE plugin) - Intel: DCRM (OCCI) Task 4.3: - TRDF: Cloud Proxy - Thales: Edgelets Management Task 4.4: - TID: SM - IBM: DCRM (PIVOT scheduler in OpenStack) Task 4.5: - TID: PaaS Manager, SDC, Monitoring - UPM: Portal, IdM integration - Inria: Job Scheduler Deviations - UPM - Intel - IBM Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 ----- Forwarded by Alex Glikson/Haifa/IBM on 17/10/2013 03:27 PM ----- From: JAVIER DE PEDRO SANCHEZ To: Alex Glikson/Haifa/IBM at IBMIL, Cc: "subsidies at tid.es" Date: 15/10/2013 04:46 PM Subject: RE: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4 Dear Alex, Please find attached the template of WP3. Each involved partner has to be evaluated at task level. Please confirm the reception of this important e-mail. Thank you very much. BR Javier. De: subsidies-bounces at tid.es [mailto:subsidies-bounces at tid.es] En nombre de JAVIER DE PEDRO SANCHEZ Enviado el: martes, 15 de octubre de 2013 15:40 Para: 'fiware-wpl at lists.fi-ware.eu' CC: subsidies at tid.es Asunto: [Subsidies] FI-WARE: Periodic Report M30 (D.1.2.5) Importancia: Alta Dear all, as WPL, I need your contribution to deliver the Periodic Report of M30. We have updated the template due to the following remark of the Commission: So, It is very important that the report shows the contribution of each involved partner at task level. We kindly ask you to follow the template where the first section is about the WP as a team, and each task is evaluated by partner. I?m going to send in a particularized e-mail with the template of your WP to you. Please ask to each involved partner their information. As soon as I have the consumption of PM of each partner, I?ll send it to you. Note: xxx= Missing information in the document. Deadline: November 30th 2013. It is probably that we?ll need a new iteration after this deadline with the effort of each partner, where we?ll need you to evaluate each declaration of effort. Thank you in advance. BR Javier. Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/jpeg Size: 45089 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.5 - WP4.docx Type: application/octet-stream Size: 224875 bytes Desc: not available URL: From GLIKSON at il.ibm.com Thu Oct 17 14:54:09 2013 From: GLIKSON at il.ibm.com (Alex Glikson) Date: Thu, 17 Oct 2013 15:54:09 +0300 Subject: [Fiware-cloud] FI-WARE cloud weekly - 16/10 Message-ID: Attendees: IBM, Thales, UPM 1. Exploitation plans: need to send to EC by the end of the months updates (per partner) 2. Progress report: request for contributions 3. Backlog: sent separate email with guidelines, need to fix by next week towards delivery at the end of the month 4. Project roadmap: need to update the page. May need to apply some replanning if project extension is approved. 5. Hackaton: ongoing, requires support by some of the team members Regards, Alex -------------- next part -------------- An HTML attachment was scrubbed... URL: From john.m.kennedy at intel.com Mon Oct 21 14:23:52 2013 From: john.m.kennedy at intel.com (Kennedy, John M) Date: Mon, 21 Oct 2013 12:23:52 +0000 Subject: [Fiware-cloud] [Fiware-testbed] [Fiware-wpa] Minutes and action points on validation deliverable submission (10.5.2b) In-Reply-To: <2981E9D6242FCF47ADC9B5DBA5DFD6648605BD90@DEWDFEMB11A.global.corp.sap> References: <2981E9D6242FCF47ADC9B5DBA5DFD664860552DD@DEWDFEMB11A.global.corp.sap> <2981E9D6242FCF47ADC9B5DBA5DFD6648605BD90@DEWDFEMB11A.global.corp.sap> Message-ID: <70851B256BA35449A5ADF81F0FADF8812BC673E7@IRSMSX102.ger.corp.intel.com> Dear Thorsten, Please find initial cloud summary now available here - I based it on the apps analysis - I just included a representative amount of comments: https://forge.fi-ware.eu/plugins/mediawiki/wiki/testbed/index.php/Chapter_level_analysis_-_cloud For the cloud workpackage folks: fyi an initial analysis of the numbers of our GE evaluation by various Use case projects. Kind regards, - John From: fiware-testbed-bounces at lists.fi-ware.eu [mailto:fiware-testbed-bounces at lists.fi-ware.eu] On Behalf Of Sandfuchs, Thorsten Sent: Friday, October 18, 2013 5:13 PM To: fiware-testbed at lists.fi-ware.eu Cc: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: Re: [Fiware-testbed] [Fiware-wpa] Minutes and action points on validation deliverable submission (10.5.2b) Dear colleagues, please find attached the first draft of the deliverable D.10.5.2b with early version of the content. - Salvatore provided already his part - John wanted to submit until Monday - For apps I wrote the text - For subsequent subchapters there is still a lot of content contributions open - happy for any contributions, either in the wiki or directly in the word file (please use "track-changes") We seem to fall behind the initial plan of finalizing the content within this week. Please try to contribute to the content ASAP in order to not require to shift the time plan or lose the ability to make a thorough review. Wish all of you a nice weekend & best regards, /Thorsten From: fiware-wpa-bounces at lists.fi-ware.eu [mailto:fiware-wpa-bounces at lists.fi-ware.eu] On Behalf Of Sandfuchs, Thorsten Sent: Montag, 14. Oktober 2013 10:25 To: fiware-testbed at lists.fi-ware.eu Cc: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] Minutes and action points on validation deliverable submission (10.5.2b) Dear colleagues, on Friday there was a testbed-internal session which discussed how to submit D.10.5.2b (the resubmission of the validation deliverable). We have a very tight schedule to submit this deliverable with all contributions in time. For this minutes I'm taking WPL/WPA on the CC list in order to let everybody know the status. Thorsten presented the approach and explained along the lines of the presentation what content should needs to be produced. - Mainly the testbed-team will in a neutral way write what we "see", judged by the numbers - things like: "SMARTAGRIFOOD rated the integration badly in the case of the XXX chapter...." We could try to come up with first assumptions on why these ratings did take place and dig deeper - but overall WPL/WPA need to do the _content_ driven analysis. "The reason for this was ..." or "We will take this serious and already implemented the following actions ..." Background are the graphs and tables prepared by Thorsten in the presentation and pivot-tables of the XLS. - Additionally and for the deliverable the "scenario based" questionnairs in DOC format need to be analyzed and "highs" and "lows" need to be extracted for the chapters. - Stefano wanted everybody to analyze the bare-metal XLS and try to come up with "new interesting" things somebody sees in the day. This task needs to be worked on in parallel within the week of 14.10. - 18.10. - everybody to report relevant findings on the 22.10. Rough time plan: KW42 (14.-18.10): main content work, Testbed-team writing what we "see", judged by the numbers KW43 (21.-25.10): finalizing text & hand-over to WPL/WPA team - 22th of October: deadline for the content work - goal: on 23th October WPL/WPA should be able to start their work with the content analysis (you will have ~3 business days) KW44 (28.-30.10): finalizing the DOC deliverable and starting a review cycle - Please volunteer if you want to be a reviewer for this deliverable KW44 (31.10): planned submission to EC Please - if possible - directly update the wiki on https://forge.fi-ware.eu/plugins/mediawiki/wiki/testbed/index.php/The_Validation_Analysis or the underlying pages. If unsure, just write the text in any other format and provide it ASAP to Thorsten so he can integrated it to the wiki. Find attached the updated presentation & the bare-metal data in XLS format. Assignments for writing the Analysis: - Cloud-chapter: John - Data: Clara - IoT: Salvatore - Overall FI-WARE: Stefano - Methodologie: Thorsten - Open chapters: o Apps o Security (ask Pascal) o Use Case chapters (all of them not assigned) Any questions or corrections, please let me know /Thorsten -- Thorsten Sandfuchs SAP AG | Vincenz-Priessnitz-Strasse 1 | D-76131 Karlsruhe, Germany | www.sap.com Pflichtangaben/Mandatory Disclosure Statements: http://www.sap.com/company/legal/impressum.epx Diese E-Mail kann Betriebs- oder Gesch?ftsgeheimnisse oder sonstige vertrauliche Informationen enthalten. Sollten Sie diese E-Mail irrt?mlich erhalten haben, ist Ihnen eine Kenntnisnahme des Inhalts, eine Vervielf?ltigung oder Weitergabe der E-Mail ausdr?cklich untersagt. Bitte benachrichtigen Sie uns und vernichten Sie die empfangene E-Mail. Vielen Dank. This e-mail may contain trade secrets or privileged, undisclosed, or otherwise confidential information. If you have received this e-mail in error, you are hereby notified that any review, copying, or distribution of it is strictly prohibited. Please inform us immediately and destroy the original transmittal. Thank you for your cooperation. Please consider the environment before printing this mail! ------------------------------------------------------------- Intel Ireland Limited (Branch) Collinstown Industrial Park, Leixlip, County Kildare, Ireland Registered Number: E902934 This e-mail and any attachments may contain confidential material for the sole use of the intended recipient(s). Any review or distribution by others is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies. -------------- next part -------------- An HTML attachment was scrubbed... URL: From GLIKSON at il.ibm.com Mon Oct 21 18:36:42 2013 From: GLIKSON at il.ibm.com (Alex Glikson) Date: Mon, 21 Oct 2013 19:36:42 +0300 Subject: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) In-Reply-To: References: Message-ID: For your reference, attached the report from M24. Notice that the was an explicit comment by the reviewers that this time the report should include contributions per partner per task. Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 From: Alex Glikson/Haifa/IBM at IBMIL To: fiware-cloud at lists.fi-ware.eu, Date: 17/10/2013 03:51 PM Subject: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) Sent by: fiware-cloud-bounces at lists.fi-ware.eu As discussed during the call yesterday, please, send me your contributions to the WP4 periodic report, referring to months 25-30, by Tue EOB next week (October 22nd). Main themes that I recall: General (I will fill in the details in the report): - Release 2 of deliverables - Testbed, OIL, Catalogue, Campus Party, hackatons - XiFi interlock Task 4.1: - Intel: Object Storage (CDMI, spec, etc), DCRM (trusted pools in OpenStack Nova) - IBM: Object Storage (Swift enhancements), DCRM (DOVE virtual networking) Task 4.2: - IBM: DCRM (OpenStack, Pulsar scheduler, VM HA, Neutron DOVE plugin) - Intel: DCRM (OCCI) Task 4.3: - TRDF: Cloud Proxy - Thales: Edgelets Management Task 4.4: - TID: SM - IBM: DCRM (PIVOT scheduler in OpenStack) Task 4.5: - TID: PaaS Manager, SDC, Monitoring - UPM: Portal, IdM integration - Inria: Job Scheduler Deviations - UPM - Intel - IBM Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 ----- Forwarded by Alex Glikson/Haifa/IBM on 17/10/2013 03:27 PM ----- From: JAVIER DE PEDRO SANCHEZ To: Alex Glikson/Haifa/IBM at IBMIL, Cc: "subsidies at tid.es" Date: 15/10/2013 04:46 PM Subject: RE: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4 Dear Alex, Please find attached the template of WP3. Each involved partner has to be evaluated at task level. Please confirm the reception of this important e-mail. Thank you very much. BR Javier. De: subsidies-bounces at tid.es [mailto:subsidies-bounces at tid.es] En nombre de JAVIER DE PEDRO SANCHEZ Enviado el: martes, 15 de octubre de 2013 15:40 Para: 'fiware-wpl at lists.fi-ware.eu' CC: subsidies at tid.es Asunto: [Subsidies] FI-WARE: Periodic Report M30 (D.1.2.5) Importancia: Alta Dear all, as WPL, I need your contribution to deliver the Periodic Report of M30. We have updated the template due to the following remark of the Commission: So, It is very important that the report shows the contribution of each involved partner at task level. We kindly ask you to follow the template where the first section is about the WP as a team, and each task is evaluated by partner. I?m going to send in a particularized e-mail with the template of your WP to you. Please ask to each involved partner their information. As soon as I have the consumption of PM of each partner, I?ll send it to you. Note: xxx= Missing information in the document. Deadline: November 30th 2013. It is probably that we?ll need a new iteration after this deadline with the effort of each partner, where we?ll need you to evaluate each declaration of effort. Thank you in advance. BR Javier. Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-cloud mailing list Fiware-cloud at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-cloud #### D.1.2.5 - WP4.docx removed & duplicate added to MyAttachments Repository V3.8 () on 20 October 2013 by Alex Glikson. Original attachment record is here (). #### D.1.2.5 - WP4.docx has been re-attached on 20 October 2013 by Alex Glikson #### D.1.2.5 - WP4.docx removed & duplicate added to MyAttachments Repository V3.8 () on 21 October 2013 by Alex Glikson. Original attachment record is here (). -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/jpeg Size: 45089 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE Periodic Report M24 WP4.doc Type: application/octet-stream Size: 371200 bytes Desc: not available URL: From henk.heijnen at technicolor.com Tue Oct 22 11:18:40 2013 From: henk.heijnen at technicolor.com (Heijnen Henk) Date: Tue, 22 Oct 2013 11:18:40 +0200 Subject: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) In-Reply-To: References: Message-ID: <189C15C1ADF61544BD5A11DCE7D5C5000355D93835@MOPESMBX01.eu.thmulti.com> Alex, I've updated the Cloud Proxy part in task 4.3 (still missing: an update for the edgelets from Thales) Regards and sorry for the delay Henk From: fiware-cloud-bounces at lists.fi-ware.eu [mailto:fiware-cloud-bounces at lists.fi-ware.eu] On Behalf Of Alex Glikson Sent: lundi 21 octobre 2013 18:37 To: fiware-cloud at lists.fi-ware.eu Cc: Alexandra Kisin; David Hadas; Eran Raichstein; Erez Hadad Subject: Re: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) For your reference, attached the report from M24. Notice that the was an explicit comment by the reviewers that this time the report should include contributions per partner per task. Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 From: Alex Glikson/Haifa/IBM at IBMIL To: fiware-cloud at lists.fi-ware.eu, Date: 17/10/2013 03:51 PM Subject: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) Sent by: fiware-cloud-bounces at lists.fi-ware.eu ________________________________ As discussed during the call yesterday, please, send me your contributions to the WP4 periodic report, referring to months 25-30, by Tue EOB next week (October 22nd). Main themes that I recall: General (I will fill in the details in the report): - Release 2 of deliverables - Testbed, OIL, Catalogue, Campus Party, hackatons - XiFi interlock Task 4.1: - Intel: Object Storage (CDMI, spec, etc), DCRM (trusted pools in OpenStack Nova) - IBM: Object Storage (Swift enhancements), DCRM (DOVE virtual networking) Task 4.2: - IBM: DCRM (OpenStack, Pulsar scheduler, VM HA, Neutron DOVE plugin) - Intel: DCRM (OCCI) Task 4.3: - TRDF: Cloud Proxy - Thales: Edgelets Management Task 4.4: - TID: SM - IBM: DCRM (PIVOT scheduler in OpenStack) Task 4.5: - TID: PaaS Manager, SDC, Monitoring - UPM: Portal, IdM integration - Inria: Job Scheduler Deviations - UPM - Intel - IBM Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 ----- Forwarded by Alex Glikson/Haifa/IBM on 17/10/2013 03:27 PM ----- From: JAVIER DE PEDRO SANCHEZ > To: Alex Glikson/Haifa/IBM at IBMIL, Cc: "subsidies at tid.es" > Date: 15/10/2013 04:46 PM Subject: RE: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4 ________________________________ Dear Alex, Please find attached the template of WP3. Each involved partner has to be evaluated at task level. Please confirm the reception of this important e-mail. Thank you very much. BR Javier. De: subsidies-bounces at tid.es [mailto:subsidies-bounces at tid.es] En nombre de JAVIER DE PEDRO SANCHEZ Enviado el: martes, 15 de octubre de 2013 15:40 Para: 'fiware-wpl at lists.fi-ware.eu' CC: subsidies at tid.es Asunto: [Subsidies] FI-WARE: Periodic Report M30 (D.1.2.5) Importancia: Alta Dear all, as WPL, I need your contribution to deliver the Periodic Report of M30. We have updated the template due to the following remark of the Commission: [cid:image001.jpg at 01CECF18.76031000] So, It is very important that the report shows the contribution of each involved partner at task level. We kindly ask you to follow the template where the first section is about the WP as a team, and each task is evaluated by partner. I'm going to send in a particularized e-mail with the template of your WP to you. Please ask to each involved partner their information. As soon as I have the consumption of PM of each partner, I'll send it to you. Note: xxx= Missing information in the document. Deadline: November 30th 2013. It is probably that we'll need a new iteration after this deadline with the effort of each partner, where we'll need you to evaluate each declaration of effort. Thank you in advance. BR Javier. ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-cloud mailing list Fiware-cloud at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-cloud #### D.1.2.5 - WP4.docx removed & duplicate added to MyAttachments Repository V3.8 (Link) on 20 October 2013 by Alex Glikson. Original attachment record is here (Link). #### D.1.2.5 - WP4.docx has been re-attached on 20 October 2013 by Alex Glikson #### D.1.2.5 - WP4.docx removed & duplicate added to MyAttachments Repository V3.8 (Link) on 21 October 2013 by Alex Glikson. Original attachment record is here (Link). -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 45089 bytes Desc: image001.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE Periodic Report M30 WP4 - cloud proxy.doc Type: application/msword Size: 351232 bytes Desc: FIWARE Periodic Report M30 WP4 - cloud proxy.doc URL: From lionel.besson at thalesgroup.com Tue Oct 22 11:29:48 2013 From: lionel.besson at thalesgroup.com (BESSON Lionel) Date: Tue, 22 Oct 2013 11:29:48 +0200 Subject: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) In-Reply-To: <189C15C1ADF61544BD5A11DCE7D5C5000355D93835@MOPESMBX01.eu.thmulti.com> References: <189C15C1ADF61544BD5A11DCE7D5C5000355D93835@MOPESMBX01.eu.thmulti.com> Message-ID: <27559_1382434221_526645AD_27559_2044_9_9D81BB1E57145440BDD5DBA70BA6C0870C31102AF2@THSONEA01CMS09P.one.grp> Hi, I already started the part about the edgelets, it will be sent beginning of the afternoon. regards, Lionel [@@ THALES GROUP INTERNAL @@] De : fiware-cloud-bounces at lists.fi-ware.eu [mailto:fiware-cloud-bounces at lists.fi-ware.eu] De la part de Heijnen Henk Envoy? : mardi 22 octobre 2013 11:19 ? : Alex Glikson; fiware-cloud at lists.fi-ware.eu Cc : Alexandra Kisin; David Hadas; Eran Raichstein; Erez Hadad Objet : Re: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) Alex, I've updated the Cloud Proxy part in task 4.3 (still missing: an update for the edgelets from Thales) Regards and sorry for the delay Henk From: fiware-cloud-bounces at lists.fi-ware.eu [mailto:fiware-cloud-bounces at lists.fi-ware.eu] On Behalf Of Alex Glikson Sent: lundi 21 octobre 2013 18:37 To: fiware-cloud at lists.fi-ware.eu Cc: Alexandra Kisin; David Hadas; Eran Raichstein; Erez Hadad Subject: Re: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) For your reference, attached the report from M24. Notice that the was an explicit comment by the reviewers that this time the report should include contributions per partner per task. Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 From: Alex Glikson/Haifa/IBM at IBMIL To: fiware-cloud at lists.fi-ware.eu, Date: 17/10/2013 03:51 PM Subject: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) Sent by: fiware-cloud-bounces at lists.fi-ware.eu ________________________________ As discussed during the call yesterday, please, send me your contributions to the WP4 periodic report, referring to months 25-30, by Tue EOB next week (October 22nd). Main themes that I recall: General (I will fill in the details in the report): - Release 2 of deliverables - Testbed, OIL, Catalogue, Campus Party, hackatons - XiFi interlock Task 4.1: - Intel: Object Storage (CDMI, spec, etc), DCRM (trusted pools in OpenStack Nova) - IBM: Object Storage (Swift enhancements), DCRM (DOVE virtual networking) Task 4.2: - IBM: DCRM (OpenStack, Pulsar scheduler, VM HA, Neutron DOVE plugin) - Intel: DCRM (OCCI) Task 4.3: - TRDF: Cloud Proxy - Thales: Edgelets Management Task 4.4: - TID: SM - IBM: DCRM (PIVOT scheduler in OpenStack) Task 4.5: - TID: PaaS Manager, SDC, Monitoring - UPM: Portal, IdM integration - Inria: Job Scheduler Deviations - UPM - Intel - IBM Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 ----- Forwarded by Alex Glikson/Haifa/IBM on 17/10/2013 03:27 PM ----- From: JAVIER DE PEDRO SANCHEZ > To: Alex Glikson/Haifa/IBM at IBMIL, Cc: "subsidies at tid.es" > Date: 15/10/2013 04:46 PM Subject: RE: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4 ________________________________ Dear Alex, Please find attached the template of WP3. Each involved partner has to be evaluated at task level. Please confirm the reception of this important e-mail. Thank you very much. BR Javier. De: subsidies-bounces at tid.es [mailto:subsidies-bounces at tid.es] En nombre de JAVIER DE PEDRO SANCHEZ Enviado el: martes, 15 de octubre de 2013 15:40 Para: 'fiware-wpl at lists.fi-ware.eu' CC: subsidies at tid.es Asunto: [Subsidies] FI-WARE: Periodic Report M30 (D.1.2.5) Importancia: Alta Dear all, as WPL, I need your contribution to deliver the Periodic Report of M30. We have updated the template due to the following remark of the Commission: [cid:image001.jpg at 01CECF1A.04447E20] So, It is very important that the report shows the contribution of each involved partner at task level. We kindly ask you to follow the template where the first section is about the WP as a team, and each task is evaluated by partner. I'm going to send in a particularized e-mail with the template of your WP to you. Please ask to each involved partner their information. As soon as I have the consumption of PM of each partner, I'll send it to you. Note: xxx= Missing information in the document. Deadline: November 30th 2013. It is probably that we'll need a new iteration after this deadline with the effort of each partner, where we'll need you to evaluate each declaration of effort. Thank you in advance. BR Javier. ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-cloud mailing list Fiware-cloud at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-cloud #### D.1.2.5 - WP4.docx removed & duplicate added to MyAttachments Repository V3.8 (Link) on 20 October 2013 by Alex Glikson. Original attachment record is here (Link). #### D.1.2.5 - WP4.docx has been re-attached on 20 October 2013 by Alex Glikson #### D.1.2.5 - WP4.docx removed & duplicate added to MyAttachments Repository V3.8 (Link) on 21 October 2013 by Alex Glikson. Original attachment record is here (Link). -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.jpg Type: image/jpeg Size: 45089 bytes Desc: image001.jpg URL: From fla at tid.es Tue Oct 22 15:16:19 2013 From: fla at tid.es (FERNANDO LOPEZ AGUILAR) Date: Tue, 22 Oct 2013 13:16:19 +0000 Subject: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) In-Reply-To: References: Message-ID: <5813B228-9886-40A2-BE52-B57EA7F6F693@tid.es> Dear Alex, Here you are the contribution from TID to the Periodic Report M30. If you need anything else, let me know. BR, Fernando L?pez Aguilar Cloud Computing fla at tid dot es +34 914 832 729 Telef?nica I+D (R&D) Ronda de la Comunicaci?n s/n Distrito C, Edificio Oeste 1, Planta 9 28043 Madrid, Spain Follow FI-WARE on the net Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 El 21/10/2013, a las 18:36, Alex Glikson > escribi?: For your reference, attached the report from M24. Notice that the was an explicit comment by the reviewers that this time the report should include contributions per partner per task. Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 From: Alex Glikson/Haifa/IBM at IBMIL To: fiware-cloud at lists.fi-ware.eu, Date: 17/10/2013 03:51 PM Subject: [Fiware-cloud] INPUT NEEDED by 22/10 (Fw: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4) Sent by: fiware-cloud-bounces at lists.fi-ware.eu ________________________________ As discussed during the call yesterday, please, send me your contributions to the WP4 periodic report, referring to months 25-30, by Tue EOB next week (October 22nd). Main themes that I recall: General (I will fill in the details in the report): - Release 2 of deliverables - Testbed, OIL, Catalogue, Campus Party, hackatons - XiFi interlock Task 4.1: - Intel: Object Storage (CDMI, spec, etc), DCRM (trusted pools in OpenStack Nova) - IBM: Object Storage (Swift enhancements), DCRM (DOVE virtual networking) Task 4.2: - IBM: DCRM (OpenStack, Pulsar scheduler, VM HA, Neutron DOVE plugin) - Intel: DCRM (OCCI) Task 4.3: - TRDF: Cloud Proxy - Thales: Edgelets Management Task 4.4: - TID: SM - IBM: DCRM (PIVOT scheduler in OpenStack) Task 4.5: - TID: PaaS Manager, SDC, Monitoring - UPM: Portal, IdM integration - Inria: Job Scheduler Deviations - UPM - Intel - IBM Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 ----- Forwarded by Alex Glikson/Haifa/IBM on 17/10/2013 03:27 PM ----- From: JAVIER DE PEDRO SANCHEZ > To: Alex Glikson/Haifa/IBM at IBMIL, Cc: "subsidies at tid.es" > Date: 15/10/2013 04:46 PM Subject: RE: FI-WARE: Periodic Report M30 (D.1.2.5) - WP4 ________________________________ Dear Alex, Please find attached the template of WP3. Each involved partner has to be evaluated at task level. Please confirm the reception of this important e-mail. Thank you very much. BR Javier. De: subsidies-bounces at tid.es [mailto:subsidies-bounces at tid.es] En nombre de JAVIER DE PEDRO SANCHEZ Enviado el: martes, 15 de octubre de 2013 15:40 Para: 'fiware-wpl at lists.fi-ware.eu' CC: subsidies at tid.es Asunto: [Subsidies] FI-WARE: Periodic Report M30 (D.1.2.5) Importancia: Alta Dear all, as WPL, I need your contribution to deliver the Periodic Report of M30. We have updated the template due to the following remark of the Commission: So, It is very important that the report shows the contribution of each involved partner at task level. We kindly ask you to follow the template where the first section is about the WP as a team, and each task is evaluated by partner. I?m going to send in a particularized e-mail with the template of your WP to you. Please ask to each involved partner their information. As soon as I have the consumption of PM of each partner, I?ll send it to you. Note: xxx= Missing information in the document. Deadline: November 30th 2013. It is probably that we?ll need a new iteration after this deadline with the effort of each partner, where we?ll need you to evaluate each declaration of effort. Thank you in advance. BR Javier. ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-cloud mailing list Fiware-cloud at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-cloud #### D.1.2.5 - WP4.docx removed & duplicate added to MyAttachments Repository V3.8 (Link) on 20 October 2013 by Alex Glikson. Original attachment record is here (Link). #### D.1.2.5 - WP4.docx has been re-attached on 20 October 2013 by Alex Glikson #### D.1.2.5 - WP4.docx removed & duplicate added to MyAttachments Repository V3.8 (Link) on 21 October 2013 by Alex Glikson. Original attachment record is here (Link). _______________________________________________ Fiware-cloud mailing list Fiware-cloud at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-cloud ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE Periodic Report M30 WP4 - TID.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 281118 bytes Desc: FIWARE Periodic Report M30 WP4 - TID.docx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: PastedGraphic-1.tiff Type: image/tiff Size: 66394 bytes Desc: PastedGraphic-1.tiff URL: From GLIKSON at il.ibm.com Wed Oct 23 09:52:43 2013 From: GLIKSON at il.ibm.com (Alex Glikson) Date: Wed, 23 Oct 2013 10:52:43 +0300 Subject: [Fiware-cloud] today's FI-WARE Cloud meeting, action items Message-ID: I am traveling, so need to cancel today's meeting. Please, make an effort to finish today the updates to progress report and backlog (including tracker and roadmap page), so that I can consolidate after I am back home tomorrow. I know that we still have several outstanding contributions and issues (per Manuel's reports). BTW, one thing that I want to communicate is that it is expected that the project will be extended by 4 months (till end of August 2014), so we will need to proceed with some replanning of our efforts and deliverables. Thanks, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 -------------- next part -------------- An HTML attachment was scrubbed... URL: From fla at tid.es Mon Oct 28 12:21:06 2013 From: fla at tid.es (FERNANDO LOPEZ AGUILAR) Date: Mon, 28 Oct 2013 11:21:06 +0000 Subject: [Fiware-cloud] [FIWARE] Roadmap update Message-ID: <904BF576-8ED2-4A5C-B3EF-2DA3C1E8DEF7@tid.es> Dear Alex et all, I just make some update in the Roadmap document in the wiki in order to reflect the new Release in which we are working now. I could see some Features from your side in the table that I translate to the third release. But, there are lots of missing features for this Release. Besides, it could be necessary to tai a view on the Future Release section. Best regards, Fernando L?pez Aguilar Cloud Computing fla at tid dot es +34 914 832 729 Telef?nica I+D (R&D) Ronda de la Comunicaci?n s/n Distrito C, Edificio Oeste 1, Planta 9 28043 Madrid, Spain [cid:65E3CA3A-3DFE-41B6-8F69-2AD965EA42FA at hi.inet] Follow FI-WARE on the net Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: PastedGraphic-1.tiff Type: image/tiff Size: 66394 bytes Desc: PastedGraphic-1.tiff URL: From joaquin.salvachua at upm.es Wed Oct 30 16:19:21 2013 From: joaquin.salvachua at upm.es (=?iso-8859-1?Q?Joaqu=EDn_Salvach=FAa?=) Date: Wed, 30 Oct 2013 16:19:21 +0100 Subject: [Fiware-cloud] Idm Endpoints In-Reply-To: <904BF576-8ED2-4A5C-B3EF-2DA3C1E8DEF7@tid.es> References: <904BF576-8ED2-4A5C-B3EF-2DA3C1E8DEF7@tid.es> Message-ID: <179B2CB2-AEE5-4AA7-BC6F-49B9DD73132C@upm.es> Dear all, The endpoints for the Idm are : IDM at FI-LAB: account.lab.fi-ware.eu IDM at the Testbed: account.testbed.fi-ware.eu Best Regards Joaqu?n -------------- next part -------------- An HTML attachment was scrubbed... URL: From GLIKSON at il.ibm.com Wed Oct 30 21:10:44 2013 From: GLIKSON at il.ibm.com (Alex Glikson) Date: Wed, 30 Oct 2013 22:10:44 +0200 Subject: [Fiware-cloud] M30 periodic report Message-ID: Comments are welcome (will send the consolidated version to the coordinator tomorrow evening). Regards, Alex ==================================================================================================== Alex Glikson Manager, Cloud Operating System Technologies, IBM Haifa Research Lab http://w3.haifa.ibm.com/dept/stt/cloud_sys.html | http://www.research.ibm.com/haifa/dept/stt/cloud_sys.shtml Email: glikson at il.ibm.com | Phone: +972-4-8281085 | Mobile: +972-54-6466667 | Fax: +972-4-8296112 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D 1 2 5 - WP4 - combined.docx Type: application/octet-stream Size: 225043 bytes Desc: not available URL: