[Fiware-cloud] RV: [Fiware-testbed] Fwd: URGENT: GEis installation and test

HENAR MUÑOZ FRUTOS henar at tid.es
Wed Apr 16 08:09:35 CEST 2014


Hi Alex

Stefano commented to me about this google docs file, that we need to fill in, regarding installation and testing.
Regard,s
Henar

De: fiware-testbed-bounces at lists.fi-ware.org [mailto:fiware-testbed-bounces at lists.fi-ware.org] En nombre de stefano de panfilis
Enviado el: martes, 15 de abril de 2014 10:12
Para: fiware-testbed at lists.fi-ware.eu
Asunto: [Fiware-testbed] Fwd: URGENT: GEis installation and test

ciao,
stefano

---------- Forwarded message ----------
From: stefano de panfilis <stefano.depanfilis at eng.it<mailto:stefano.depanfilis at eng.it>>
Date: 2014-04-08 20:32 GMT+02:00
Subject: URGENT: GEis installation and test
To: "fiware-wpl at lists.fi-ware.eu<mailto:fiware-wpl at lists.fi-ware.eu>" <fiware-wpl at lists.fi-ware.eu<mailto:fiware-wpl at lists.fi-ware.eu>>, "fiware-wpa at lists.fi-ware.eu<mailto:fiware-wpa at lists.fi-ware.eu>" <fiware-wpa at lists.fi-ware.eu<mailto:fiware-wpa at lists.fi-ware.eu>>

dear all,

as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is “Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed – not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3.”

the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0)
this doc contains all the geis implemented at the moment or in the very near future.

1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are:
1.1 no geis of wp4 for what concerns fi-lab installation and test
1.2 only the geis of wp7 which do not require special network environment
1.3 no geis for which do not exist an oss version

2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36.

3. all the remaining installations and tests must be fulfilled by 30 june 2014.

the installation and tests must be documented using the form described in the attached document.

please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested:
1. manual deplyoment, which involves all oss released geis
2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption)

it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment.

this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday.

for any clarification you migth need, please do not hesitate to contact me.

ciao,
stefano

--
Stefano De Panfilis
Chief Innovation Officer
Engineering Ingegneria Informatica S.p.A.
via Riccardo Morandi 32
00148 Roma
Italy

tel (direct): +39-068307-4295<tel:%2B39-068307-4295>
tel (secr.): +39-068307-4513<tel:%2B39-068307-4513>
fax: +39-068307-4200<tel:%2B39-068307-4200>
cell: +39-335-7542-567<tel:%2B39-335-7542-567>
skype: depa01




--
Stefano De Panfilis
Chief Innovation Officer
Engineering Ingegneria Informatica S.p.A.
via Riccardo Morandi 32
00148 Roma
Italy

tel (direct): +39-068307-4295
tel (secr.): +39-068307-4513
fax: +39-068307-4200
cell: +39-335-7542-567
skype: depa01


________________________________

Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra política de envío y recepción de correo electrónico en el enlace situado más abajo.
This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at:
http://www.tid.es/ES/PAGINAS/disclaimer.aspx
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.fiware.org/private/old-fiware-cloud/attachments/20140416/a4393ee1/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: I10.2_Installation_and_Test_Template_v2.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 220183 bytes
Desc: I10.2_Installation_and_Test_Template_v2.docx
URL: <https://lists.fiware.org/private/old-fiware-cloud/attachments/20140416/a4393ee1/attachment.docx>
-------------- next part --------------
An embedded and charset-unspecified text was scrubbed...
Name: ATT00001.txt
URL: <https://lists.fiware.org/private/old-fiware-cloud/attachments/20140416/a4393ee1/attachment.txt>


More information about the Old-Fiware-cloud mailing list

You can get more information about our cookies and privacy policies clicking on the following links: Privacy policy   Cookies policy