Dear WP colleagues,
Looking at the agenda, it seems that the Data WP has no meetings on
Monday.
I would like to check with the BigData and Pub/Sub representatives if some
are available for meeting on Monday.
This way, we could come with more sound directions for integration between
the BigData, Pub/Sub and CEP GEs, since I'm not sure that the 1.5h planned
slot in the overall agenda would be sufficient.
Best Regards,
Tali Yatzkar-Haham
Event-based Middleware & Solutions Group
IBM Haifa Research Lab
Phone: 972-4-829-6320 | Mobile: 972-54-4388482
E-mail: TALI at il.ibm.com
Haifa University, Mount Carmel
Haifa, 31905
Israel
From: CARLOS RALLI UCENDO <ralli at tid.es>
To: "Fiware-data at lists.fi-ware.eu" <Fiware-data at lists.fi-ware.eu>
Date: 17/01/2012 06:34 PM
Subject: [Fiware-data] Draft proposal of Data/Context Agenda for
Madrid meeting
Sent by: fiware-data-bounces at lists.fi-ware.eu
Dear WP colleagues,
Find enclosed here a first draft proposal of the Data/Context WP agenda
for Madrid meeting:
***************************************************************************************************
---> Slot 1a: Data/Context Assets Status (5x30' = 2h 30'). Max Number
Attendants: 14.
Each Baseline asset should provide a maximum of 8 slides to make a 20'
presentation covering:
- Key development milestones achieved within Sprints 1, 2 & 3.
- Issues/deviations occurred during this period and countermeasure
actions.
- Status/Roadmap/Considerations regarding alignment with the chapter
context: REST API/interfaces, NGSI paradigm.
---> Slot 1b: Data/Context Assets Status (CONT. of Slot 1a). (5x30' = 2h
30'). Max Number Attendants: 14.
---> Slot 2: Architectural Roundtable. Max Number Attendants: 14 (2h 30').
Max Number Attendants: 14
- BigDATA - CEP - P/S Integration. Follow up, continuation and wrap up of
previous discussions (1h30')
- Middleware and REST APIs (30')
- Deliverables Guidelines/Progress (30')
---> Slot 3: UC projects Backlog review (10x15' = 2h 30'). Max Number
Attendants: 14
- 10 min discussions per baseline asset regarding assigned UC project
tickets.
Instead of going one by one, we expect here to collect the overall
status, kind of requirements and issues.
The feedback provided should be relevant to the cooperation tasks with UC
projects (Architecture Board, dissemination, exploitation, etc...)
---> Slot 4: Action Points / Next Steps (Roundtable. 2h30'). Max Number
Attendants: 14
- Specific Data/Context AP related to baseline assets, backlog, etc.
- How the chapter does/will contribute to
dissemination/Standardization/Exploitation/coordination with UC projects,
etc
- How the chapter does/will increase FIWARE impact with technical
presentations, workshops, actions, etc.
- Specific chapter actions/ideas for dissemination/technical impact/etc...
?
***************************************************************************************************
Should you have feedback or missing key items to be discussed, just drop
me an e-mail.
What I need from your side at this point is each baseline asset
presentation confirmation for slots 1a, 1b and 3 before this Thu evening.
(we do not need the presentation files, just the confirmation of your
participation).
Please, remind that we are scheduling coordination meetings with other WPs
too. You can see the overall current status at:
https://docs.google.com/spreadsheet/ccc?key=0AqGGeaQGro3fdFVQMzYzOFJvNzFncTR3YjdOVVNTVnc#gid=0
In the same link you can see all previous slots placed in the overall
agenda (All on Tue, Wed and Thu).
Best regards.
-
------------------------------------------------------------------------------------------------------------------------
Carlos Ralli Ucendo (ralli at tid.es)
Cell: +34696923588
Twitter: @carlosralli
Telefónica I+D SAU
Madrid, Spain
------------------------------------------------------------------------------------------------------------------------
Follow FI-WARE project (Future Internet Services Core Platform):
Website: http://www.fi-ware.eu
Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242
Twitter: @fiware
LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932
------------------------------------------------------------------------------------------------------------------------
Este mensaje se dirige exclusivamente a su destinatario. Puede consultar
nuestra política de envío y recepción de correo electrónico en el enlace
situado más abajo.
This message is intended exclusively for its addressee. We only send and
receive email on the basis of the terms set out at
http://www.tid.es/ES/PAGINAS/disclaimer.aspx
_______________________________________________
Fiware-data mailing list
Fiware-data at lists.fi-ware.eu
http://lists.fi-ware.eu/listinfo/fiware-data
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.fiware.org/private/old-fiware-data/attachments/20120119/7354adab/attachment.html>
You can get more information about our cookies and privacy policies clicking on the following links: Privacy policy Cookies policy