From sergg at tid.es Wed Apr 2 13:23:03 2014 From: sergg at tid.es (SERGIO GARCIA GOMEZ) Date: Wed, 02 Apr 2014 11:23:03 +0000 Subject: [Fiware-data] Virtual Meeting Message-ID: <03BE306058976141B4883174DF62D54D0102DF899D@EX10-MB2-MAD.hi.inet> Hi all, I was preparing the agenda and pre-minutes and I realized that it will be mostly a list of reminders. So let?s use the lemma ?Meetings are Toxic? (Fermin is nodding now) and let?s transform it into a virtual meeting with three conditions: ? Please read carefully the mail and react to the action points appropriately. ? Please, take advantage of this 90 extra minutes of today for fixing backlog issues and others (special message for TI and ATOS) . ? Should you have any doubt, just get in touch with me, even through skype (serggtid). Link to the Virtual Meeting minutes: https://docs.google.com/document/d/1-NMyTkU1Vxt0aDK4AAScDEh0d0B1j5KtEZKljMqV1gE/edit# First of all, thanks for your contributions during this week, specially to Orange, TID , IBM and URJC/NAEVA Action Points @ALL, please check the support you plan to offer beyond FI-WARE. Check the information (license, platform, channels), fix it if needed and paint it in green. It?s a 5 minutes task. Deadline: ASAP/Today. https://docs.google.com/spreadsheet/ccc?key=0AgKkYKvfz1EsdDhFZFh5dWw5cWQ0a3JPQlpRS1VlNWc#gid=19 @SIEMENS, fill in the periodic management report. Deadline 20th April EOB. https://docs.google.com/document/d/1FDeL960k5m53SJPDnMtL_0bhvawCHrVCD5tzvWgIrG8/edit @SIEMENS, ATOS, TI. Please fix the issues detected in R3.2 guides and delivery. Drop me an email when you?re done. Deadline: End of Week. https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGZ0ekFhREgyMFdoT1owZ1BYdFlnbGc&usp=docslist_api#gid=5 @TI, ATOS, TID (Cosmos). Please fix the backlog. TI, ATOS, the status of your GEs is appalling? Deadline: ASAP? https://forge.fi-ware.org/docman/view.php/27/3722/FIWARE.backlog.data.review.20140401.xlsx Reminders: @ATOS, TI, Deadline for R.3.3 documentation is 11th of April. Best Regards, Sergio. -- Sergio Garcia Gomez Telefonica (TI+D) FI-WARE [http://www.fi-ware.org] Parque Tecnologico de Boecillo. 47151 Boecillo (Valladolid), SPAIN. E-mail: sergg at tid.es Phone: (+34) 9131.29098 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From sergg at tid.es Wed Apr 2 13:23:43 2014 From: sergg at tid.es (SERGIO GARCIA GOMEZ) Date: Wed, 02 Apr 2014 11:23:43 +0000 Subject: [Fiware-data] Canceled: FI-WARE WP6 Call Message-ID: <03BE306058976141B4883174DF62D54D0102DF89D1@EX10-MB2-MAD.hi.inet> Minutes and agendas: https://docs.google.com/spreadsheet/ccc?key=0AgKkYKvfz1EsdDhFZFh5dWw5cWQ0a3JPQlpRS1VlNWc#gid=6 Bridge: PIN 001633 * Belgium 070 35 99 94 * France 0821 230 748 * Germany 01803 001 178 * Italy 848 390 166 * Netherlands 0870 001 909 * Spain 902 885 318 * Sweden 0939 2066 400 * Switzerland 0848 560 190 * United Kingdom 0844 4 73 73 73 cell number 87373 * Other countries and details http://pdf.powwownow.com/pdf/USA_en_pwn-dial-in-numbers.pdf * Worldwide & SkypeOut +49 1803 001 178 +44 844 4 73 73 73 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 3761 bytes Desc: not available URL: From frb at tid.es Wed Apr 2 13:50:12 2014 From: frb at tid.es (FRANCISCO ROMERO BUENO) Date: Wed, 02 Apr 2014 11:50:12 +0000 Subject: [Fiware-data] Virtual Meeting In-Reply-To: <03BE306058976141B4883174DF62D54D0102DF899D@EX10-MB2-MAD.hi.inet> References: <03BE306058976141B4883174DF62D54D0102DF899D@EX10-MB2-MAD.hi.inet> Message-ID: Hi, Regarding the AP for Cosmos, the backlog is fixed since past Friday (28th March). Attached you can find the last report personally sent by Manuel that day. Regards, Francisco De: fiware-data-bounces at lists.fi-ware.org [mailto:fiware-data-bounces at lists.fi-ware.org] En nombre de SERGIO GARCIA GOMEZ Enviado el: mi?rcoles, 02 de abril de 2014 13:23 Para: FI-WARE Data/Context Mgmt. Chapter (fiware-data at lists.fi-ware.org) Asunto: [Fiware-data] Virtual Meeting Hi all, I was preparing the agenda and pre-minutes and I realized that it will be mostly a list of reminders. So let?s use the lemma ?Meetings are Toxic? (Fermin is nodding now) and let?s transform it into a virtual meeting with three conditions: ? Please read carefully the mail and react to the action points appropriately. ? Please, take advantage of this 90 extra minutes of today for fixing backlog issues and others (special message for TI and ATOS) . ? Should you have any doubt, just get in touch with me, even through skype (serggtid). Link to the Virtual Meeting minutes: https://docs.google.com/document/d/1-NMyTkU1Vxt0aDK4AAScDEh0d0B1j5KtEZKljMqV1gE/edit# First of all, thanks for your contributions during this week, specially to Orange, TID , IBM and URJC/NAEVA Action Points @ALL, please check the support you plan to offer beyond FI-WARE. Check the information (license, platform, channels), fix it if needed and paint it in green. It?s a 5 minutes task. Deadline: ASAP/Today. https://docs.google.com/spreadsheet/ccc?key=0AgKkYKvfz1EsdDhFZFh5dWw5cWQ0a3JPQlpRS1VlNWc#gid=19 @SIEMENS, fill in the periodic management report. Deadline 20th April EOB. https://docs.google.com/document/d/1FDeL960k5m53SJPDnMtL_0bhvawCHrVCD5tzvWgIrG8/edit @SIEMENS, ATOS, TI. Please fix the issues detected in R3.2 guides and delivery. Drop me an email when you?re done. Deadline: End of Week. https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGZ0ekFhREgyMFdoT1owZ1BYdFlnbGc&usp=docslist_api#gid=5 @TI, ATOS, TID (Cosmos). Please fix the backlog. TI, ATOS, the status of your GEs is appalling? Deadline: ASAP? https://forge.fi-ware.org/docman/view.php/27/3722/FIWARE.backlog.data.review.20140401.xlsx Reminders: @ATOS, TI, Deadline for R.3.3 documentation is 11th of April. Best Regards, Sergio. -- Sergio Garcia Gomez Telefonica (TI+D) FI-WARE [http://www.fi-ware.org] Parque Tecnologico de Boecillo. 47151 Boecillo (Valladolid), SPAIN. E-mail: sergg at tid.es Phone: (+34) 9131.29098 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.data.review.20140328.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 389309 bytes Desc: FIWARE.backlog.data.review.20140328.xlsx URL: From sergg at tid.es Thu Apr 3 12:09:34 2014 From: sergg at tid.es (SERGIO GARCIA GOMEZ) Date: Thu, 03 Apr 2014 10:09:34 +0000 Subject: [Fiware-data] Virtual Meeting In-Reply-To: <03BE306058976141B4883174DF62D54D0102DF899D@EX10-MB2-MAD.hi.inet> References: <03BE306058976141B4883174DF62D54D0102DF899D@EX10-MB2-MAD.hi.inet> Message-ID: <03BE306058976141B4883174DF62D54D0102DF9FBE@EX10-MB2-MAD.hi.inet> Dear all, I?m about to close this issue @ALL, please check the support you plan to offer beyond FI-WARE. Check the information (license, platform, channels), fix it if needed and paint it in green. It?s a 5 minutes task. Deadline: ASAP/Today. https://docs.google.com/spreadsheet/ccc?key=0AgKkYKvfz1EsdDhFZFh5dWw5cWQ0a3JPQlpRS1VlNWc#gid=19 This afternoon I will release the result. Please let me know if you agree with the content, or you want to change anything. Best Regards, Sergio. From: fiware-data-bounces at lists.fi-ware.org [mailto:fiware-data-bounces at lists.fi-ware.org] On Behalf Of SERGIO GARCIA GOMEZ Sent: Wednesday, April 02, 2014 13:23 To: FI-WARE Data/Context Mgmt. Chapter (fiware-data at lists.fi-ware.org) Subject: [Fiware-data] Virtual Meeting Hi all, I was preparing the agenda and pre-minutes and I realized that it will be mostly a list of reminders. So let?s use the lemma ?Meetings are Toxic? (Fermin is nodding now) and let?s transform it into a virtual meeting with three conditions: ? Please read carefully the mail and react to the action points appropriately. ? Please, take advantage of this 90 extra minutes of today for fixing backlog issues and others (special message for TI and ATOS) . ? Should you have any doubt, just get in touch with me, even through skype (serggtid). Link to the Virtual Meeting minutes: https://docs.google.com/document/d/1-NMyTkU1Vxt0aDK4AAScDEh0d0B1j5KtEZKljMqV1gE/edit# First of all, thanks for your contributions during this week, specially to Orange, TID , IBM and URJC/NAEVA Action Points @ALL, please check the support you plan to offer beyond FI-WARE. Check the information (license, platform, channels), fix it if needed and paint it in green. It?s a 5 minutes task. Deadline: ASAP/Today. https://docs.google.com/spreadsheet/ccc?key=0AgKkYKvfz1EsdDhFZFh5dWw5cWQ0a3JPQlpRS1VlNWc#gid=19 @SIEMENS, fill in the periodic management report. Deadline 20th April EOB. https://docs.google.com/document/d/1FDeL960k5m53SJPDnMtL_0bhvawCHrVCD5tzvWgIrG8/edit @SIEMENS, ATOS, TI. Please fix the issues detected in R3.2 guides and delivery. Drop me an email when you?re done. Deadline: End of Week. https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdGZ0ekFhREgyMFdoT1owZ1BYdFlnbGc&usp=docslist_api#gid=5 @TI, ATOS, TID (Cosmos). Please fix the backlog. TI, ATOS, the status of your GEs is appalling? Deadline: ASAP? https://forge.fi-ware.org/docman/view.php/27/3722/FIWARE.backlog.data.review.20140401.xlsx Reminders: @ATOS, TI, Deadline for R.3.3 documentation is 11th of April. Best Regards, Sergio. -- Sergio Garcia Gomez Telefonica (TI+D) FI-WARE [http://www.fi-ware.org] Parque Tecnologico de Boecillo. 47151 Boecillo (Valladolid), SPAIN. E-mail: sergg at tid.es Phone: (+34) 9131.29098 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From mcp at tid.es Mon Apr 7 15:11:09 2014 From: mcp at tid.es (Miguel Carrillo) Date: Mon, 07 Apr 2014 15:11:09 +0200 Subject: [Fiware-data] Launch of Release 3.3 (reminder) In-Reply-To: <5328184A.403@tid.es> References: <5328184A.403@tid.es> Message-ID: <5342A3ED.1030601@tid.es> Dear all, This is just to remind you the deadline on April,11 ( a)User & Prog., b)Unit Testing Plan, c)Install & Admin manual ) Best regards, Miguel El 18/03/2014 10:56, Miguel Carrillo escribi?: Dear all, This message is to inform you that we have created the links to edit the R3.3 manuals. If you follow the links, you will see that there are two blocks per WP (R3.2 & R3.3) in each one of the three manuals (User & Prog., Unit Testing Plan, Install & Admin). * https://forge.fi-ware.org/plugins/mediawiki/wiki/fi-ware-private/index.php/FiwareDeliverablesR3 For the WPLs: * Please check that the manuals under R3.2 and R3.3 are the right ones and delete/add as needed. Do not trust the ones you see now. If there are any changes please inform me in private. * Of course, take into account those GEs that are stopped and delete them For each GE owner: * Please edit the R3.3 manuals. Deadline to have the manuals ready: April, 11. At this point we will provide a dedicated google doc for the R3.3 reviews. The reviews of R3.2 are not superseded and the review will continue in parallel. They continue and all changes from R3.2 should be synchronized in the R3.3 manuals. We will try to reactivate the reviews of R3.2 shortly. Best regards, Manuel & Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.org Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From sergg at tid.es Wed Apr 9 12:55:21 2014 From: sergg at tid.es (SERGIO GARCIA GOMEZ) Date: Wed, 09 Apr 2014 10:55:21 +0000 Subject: [Fiware-data] Call today focused on GEis installation tests Message-ID: <03BE306058976141B4883174DF62D54D0102E082B9@EX10-MB2-MAD.hi.inet> Dear all, I would like to focus today?s call on coordinating an activity related to cross testing installation and deployment of GEs derived from a recommendation from the review. Have a look at the email below from the WP10 leader. Finally, thanks for the last minute efforts to have the backlog ready, specially to ATOS who have solved most of their issues. The report will be sent to the EC this afternoon. Best Regards, Sergio. [cid:image003.png at 01CF53F2.F696C220] From: fiware-wpa-bounces at lists.fi-ware.org [mailto:fiware-wpa-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Tuesday, April 08, 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is ?Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed ? not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3.? the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image003.png Type: image/png Size: 33806 bytes Desc: image003.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: I10.2_Installation_and_Test_Template_v2.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 220183 bytes Desc: I10.2_Installation_and_Test_Template_v2.docx URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From sergg at tid.es Wed Apr 9 13:10:07 2014 From: sergg at tid.es (SERGIO GARCIA GOMEZ) Date: Wed, 09 Apr 2014 11:10:07 +0000 Subject: [Fiware-data] Call today focused on GEis installation tests In-Reply-To: <03BE306058976141B4883174DF62D54D0102E082B9@EX10-MB2-MAD.hi.inet> References: <03BE306058976141B4883174DF62D54D0102E082B9@EX10-MB2-MAD.hi.inet> Message-ID: <03BE306058976141B4883174DF62D54D0102E08328@EX10-MB2-MAD.hi.inet> Sorry, I forgot to include the link to the minutes. https://docs.google.com/document/d/1-dTve9IHiFWYb6TsisgSttZhF52GL44QXEunUsZQ_FI/edit# I guess it will be short, I beg your punctuality. Best regards, Sergio. From: fiware-data-bounces at lists.fi-ware.org [mailto:fiware-data-bounces at lists.fi-ware.org] On Behalf Of SERGIO GARCIA GOMEZ Sent: Wednesday, April 09, 2014 12:55 To: FI-WARE Data/Context Mgmt. Chapter (fiware-data at lists.fi-ware.org) Subject: [Fiware-data] Call today focused on GEis installation tests Dear all, I would like to focus today?s call on coordinating an activity related to cross testing installation and deployment of GEs derived from a recommendation from the review. Have a look at the email below from the WP10 leader. Finally, thanks for the last minute efforts to have the backlog ready, specially to ATOS who have solved most of their issues. The report will be sent to the EC this afternoon. Best Regards, Sergio. [cid:image001.png at 01CF53F5.06D77470] From: fiware-wpa-bounces at lists.fi-ware.org [mailto:fiware-wpa-bounces at lists.fi-ware.org] On Behalf Of stefano de panfilis Sent: Tuesday, April 08, 2014 20:32 To: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Subject: [Fiware-wpa] URGENT: GEis installation and test dear all, as discussed yesterday during our call and refined this morning in the wp10 call, here is the procedure to install and test the geis as requested in the scope of recommendation 18 of the review report 6 excerpt of which is ?Obviously, hardly any of the documentation can claim completeness in the remaining time, but should at least cover all known grounds. To this end, extensive and directed installation and usage tests should be performed ? not only through the Use Case projects, but also within the consortium. For example, partners not involved in the development of a specific Generic Enabler can verify it through installation and testing. The according results and findings should be incorporated in the forthcoming Release 3 and the validation reporting of deliverable D10.5.3.? the wpl migth already have received at this time an invitation from me to access a googledoc (here again the link for your convenience: https://docs.google.com/spreadsheet/ccc?key=0AqLSWp0KXaaDdDBPb2gwYm11aUVQZzBPU3ZZZHowREE&usp=docslist_api#gid=0) this doc contains all the geis implemented at the moment or in the very near future. 1. each wpl must, within this friday (11 april 2014), fill, in agreement with their wp participants, the name of the organisation responsible for installing a testing a specific gei. in addition the wpl should declare which geis will be tested. the overal rules are: 1.1 no geis of wp4 for what concerns fi-lab installation and test 1.2 only the geis of wp7 which do not require special network environment 1.3 no geis for which do not exist an oss version 2. within 25 april 2014 all the installations and tests must be completed either by the organisations leaving the project at m36, and by those organisation if a test assigned to them involve a gei owned by an organisation leaving the project at m36. 3. all the remaining installations and tests must be fulfilled by 30 june 2014. the installation and tests must be documented using the form described in the attached document. please note that, as you can easily guess from point 1 above, there are two different kind of installations to be tested: 1. manual deplyoment, which involves all oss released geis 2. recipes supported deployment in the fi-ware testbed. this case the person making the test must create a vm, which should be removed immediately after the installation and test is completed (due to the obvious resource cosumption) it would be great if the persons who will make the installation and tests are completely outside the fi-ware environment. this procedure refines and superseeds what sent by thorsten, thank you for triggering the process, on last wednesday. for any clarification you migth need, please do not hesitate to contact me. ciao, stefano -- Stefano De Panfilis Chief Innovation Officer Engineering Ingegneria Informatica S.p.A. via Riccardo Morandi 32 00148 Roma Italy tel (direct): +39-068307-4295 tel (secr.): +39-068307-4513 fax: +39-068307-4200 cell: +39-335-7542-567 skype: depa01 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 33806 bytes Desc: image001.png URL: From ralli at tid.es Wed Apr 9 15:20:11 2014 From: ralli at tid.es (CARLOS RALLI UCENDO) Date: Wed, 09 Apr 2014 13:20:11 +0000 Subject: [Fiware-data] Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB In-Reply-To: <5342A3ED.1030601@tid.es> Message-ID: Dear colleagues, It is time to collect all information regarding dissemination, communication & collaboration actions you performed in the last WP12 reporting period (M30 = Oct 2013 to M36 = Apr 2014, all included). Please, bear in mind that the EC may reject one of your trips for these activities if they are not correctly reported in this new edition of D12.2 and D12.3 documents. This time, to make things easier for all of you I have prepared a Googledoc where you can place your contribs and then I may transfer them myself to the wiki: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_73M/edit#heading=h.o4j1rtrg6tzx However, you may always contribute to the wiki directly as in previous times. The contribs have to be added here: http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Dissemination_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Communication_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Collaboration_activities Even when you add your contribs straight into the wiki, do not forget to add your partner name to the googledoc and add "(Wiki)" so I keep informed. As said in the googledoc the 6 possible sections you may contribute with entries (the googledoc includes examples) are: 1. Participation in Events (Presentations, round tables, keynotes...) 2. Scientific Papers and Panels 3. Book chapters 4. Training materials & Tutorials 5. Collaboration Meetings/Actions 6. Press Releases and other relevant Communication actions Normally, most partners will have contribs to 1 and 2 sections. Deadline for this is next monday April 14th EoB. Should you have any question/comment, please do contact me. Thanks in advance for your kind cooperation. Best regards, -- ------------------------------------------------------------------------------------------------------------------------ Carlos Ralli Ucendo (ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ------------------------------------------------------------------------------------------------------------------------ Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ------------------------------------------------------------------------------------------------------------------------ ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From sergg at tid.es Tue Apr 15 16:31:10 2014 From: sergg at tid.es (SERGIO GARCIA GOMEZ) Date: Tue, 15 Apr 2014 14:31:10 +0000 Subject: [Fiware-data] Canceled: FI-WARE WP6 Call Message-ID: <03BE306058976141B4883174DF62D54D0102E114C4@EX10-MB2-MAD.hi.inet> Easter Minutes and agendas: https://docs.google.com/spreadsheet/ccc?key=0AgKkYKvfz1EsdDhFZFh5dWw5cWQ0a3JPQlpRS1VlNWc#gid=6 Bridge: PIN 001633 * Belgium 070 35 99 94 * France 0821 230 748 * Germany 01803 001 178 * Italy 848 390 166 * Netherlands 0870 001 909 * Spain 902 885 318 * Sweden 0939 2066 400 * Switzerland 0848 560 190 * United Kingdom 0844 4 73 73 73 cell number 87373 * Other countries and details http://pdf.powwownow.com/pdf/USA_en_pwn-dial-in-numbers.pdf * Worldwide & SkypeOut +49 1803 001 178 +44 844 4 73 73 73 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 3771 bytes Desc: not available URL: From ralli at tid.es Mon Apr 21 11:55:10 2014 From: ralli at tid.es (CARLOS RALLI UCENDO) Date: Mon, 21 Apr 2014 09:55:10 +0000 Subject: [Fiware-data] LAST CALL - Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB In-Reply-To: Message-ID: Dear Colleagues, So far I can only see the contributions from: iMinds, NEC, IBM-CH, ALU-D, Playsign, SAP(WP3), NSN-H, DT (sent to Carlos by e-mail) ATOS and Ogilvy have committed to send it tomorrow EoB. Please, let me extend the deadline until this wednesday at 12CET. However there will be no further extensions and all contribs not received will not be included in the document to be delivered this friday. As said before, the European Commission may reject the costs of dissemination trips within M30 and M36 not included in this document. Obviously, for partners leaving the project on M36 is extremely important if you want to get all funds related to dissemination of FI-WARE. The googledoc to contribute is still active here: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_73M/edit#heading=h.kgxusv5ldjp Thanks for your understanding and contributions, Best regards. -- ------------------------------------------------------------------------------------------------------------------------ Carlos Ralli Ucendo (ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ------------------------------------------------------------------------------------------------------------------------ Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ------------------------------------------------------------------------------------------------------------------------ De: Carlos Ralli Ucendo > Fecha: mi?rcoles, 9 de abril de 2014 15:20 Para: "fiware at lists.fi-ware.org" > CC: "fiware-cloud at lists.fi-ware.org" >, "fiware-iot at lists.fi-ware.org" >, "Fiware-data at lists.fi-ware.org" >, "FI-WARE, MiWi" >, "fiware-i2nd at lists.fi-ware.org" >, "fiware-apps at lists.fi-ware.eorg" >, "fiware-security at lists.fi-ware.org" > Asunto: Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB Dear colleagues, It is time to collect all information regarding dissemination, communication & collaboration actions you performed in the last WP12 reporting period (M30 = Oct 2013 to M36 = Apr 2014, all included). Please, bear in mind that the EC may reject one of your trips for these activities if they are not correctly reported in this new edition of D12.2 and D12.3 documents. This time, to make things easier for all of you I have prepared a Googledoc where you can place your contribs and then I may transfer them myself to the wiki: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_73M/edit#heading=h.o4j1rtrg6tzx However, you may always contribute to the wiki directly as in previous times. The contribs have to be added here: http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Dissemination_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Communication_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Collaboration_activities Even when you add your contribs straight into the wiki, do not forget to add your partner name to the googledoc and add "(Wiki)" so I keep informed. As said in the googledoc the 6 possible sections you may contribute with entries (the googledoc includes examples) are: 1. Participation in Events (Presentations, round tables, keynotes...) 2. Scientific Papers and Panels 3. Book chapters 4. Training materials & Tutorials 5. Collaboration Meetings/Actions 6. Press Releases and other relevant Communication actions Normally, most partners will have contribs to 1 and 2 sections. Deadline for this is next monday April 14th EoB. Should you have any question/comment, please do contact me. Thanks in advance for your kind cooperation. Best regards, -- ------------------------------------------------------------------------------------------------------------------------ Carlos Ralli Ucendo (ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ------------------------------------------------------------------------------------------------------------------------ Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ------------------------------------------------------------------------------------------------------------------------ ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: From suraci at dis.uniroma1.it Mon Apr 21 19:41:06 2014 From: suraci at dis.uniroma1.it (Vincenzo Suraci) Date: Mon, 21 Apr 2014 19:41:06 +0200 Subject: [Fiware-data] R: [Fiware-i2nd] LAST CALL - Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB In-Reply-To: References: Message-ID: <005401cf5d88$e07d09a0$a1771ce0$@dis.uniroma1.it> Dear Carlos, find attached the UNIROMA1 contribution to WP12 periodic report. Best Regards, Vincenzo Suraci _____________________________________ Dr. Vincenzo Suraci "Sapienza" - Universit? di Roma Dipartimento di Ingegneria Informatica, Automatica e Gestionale (DIAG) Via Ariosto, 25 - 00185 Rome - Italy Phone +39 06 77274 037 Fax +39 06 77274 033 Mobile +39 340 156 2258 Mail suraci at dis.uniroma1.it Web Site http://www.dis.uniroma1.it/~suraci Da: fiware-i2nd-bounces at lists.fi-ware.org [mailto:fiware-i2nd-bounces at lists.fi-ware.org] Per conto di CARLOS RALLI UCENDO Inviato: luned? 21 aprile 2014 11:55 A: fiware at lists.fi-ware.org; fiware-cloud at lists.fi-ware.org; fiware-iot at lists.fi-ware.org; Fiware-data at lists.fi-ware.org; FI-WARE, MiWi; fiware-i2nd at lists.fi-ware.org; fiware-apps at lists.fi-ware.eorg; fiware-security at lists.fi-ware.org Oggetto: [Fiware-i2nd] LAST CALL - Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB Dear Colleagues, So far I can only see the contributions from: iMinds, NEC, IBM-CH, ALU-D, Playsign, SAP(WP3), NSN-H, DT (sent to Carlos by e-mail) ATOS and Ogilvy have committed to send it tomorrow EoB. Please, let me extend the deadline until this wednesday at 12CET. However there will be no further extensions and all contribs not received will not be included in the document to be delivered this friday. As said before, the European Commission may reject the costs of dissemination trips within M30 and M36 not included in this document. Obviously, for partners leaving the project on M36 is extremely important if you want to get all funds related to dissemination of FI-WARE. The googledoc to contribute is still active here: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_ 73M/edit#heading=h.kgxusv5ldjp Thanks for your understanding and contributions, Best regards. -- ---------------------------------------------------------------------------- -------------------------------------------- Carlos Ralli Ucendo ( ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ---------------------------------------------------------------------------- -------------------------------------------- Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------------- -------------------------------------------- De: Carlos Ralli Ucendo < ralli at tid.es> Fecha: mi?rcoles, 9 de abril de 2014 15:20 Para: " fiware at lists.fi-ware.org" < fiware at lists.fi-ware.org> CC: " fiware-cloud at lists.fi-ware.org" < fiware-cloud at lists.fi-ware.org>, " fiware-iot at lists.fi-ware.org" < fiware-iot at lists.fi-ware.org>, " Fiware-data at lists.fi-ware.org" < Fiware-data at lists.fi-ware.org>, "FI-WARE, MiWi" < fiware-miwi at lists.fi-ware.org>, " fiware-i2nd at lists.fi-ware.org" < fiware-i2nd at lists.fi-ware.org>, " fiware-apps at lists.fi-ware.eorg" < fiware-apps at lists.fi-ware.org>, " fiware-security at lists.fi-ware.org" < fiware-security at lists.fi-ware.org> Asunto: Dissemination Deliverables (WP12) - Contribs Request (Fast&Easy to complete!) - Deadline Apr 14th EoB Dear colleagues, It is time to collect all information regarding dissemination, communication & collaboration actions you performed in the last WP12 reporting period (M30 = Oct 2013 to M36 = Apr 2014, all included). Please, bear in mind that the EC may reject one of your trips for these activities if they are not correctly reported in this new edition of D12.2 and D12.3 documents. This time, to make things easier for all of you I have prepared a Googledoc where you can place your contribs and then I may transfer them myself to the wiki: https://docs.google.com/document/d/1yijmVTzawgTKayW6aNH_L5LSn7r26yVIpZGh-Wb_ 73M/edit#heading=h.o4j1rtrg6tzx However, you may always contribute to the wiki directly as in previous times. The contribs have to be added here: http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Disseminati on_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Communicati on_activities http://forge.fi-ware.org/plugins/mediawiki/wiki/fiware/index.php/Collaborati on_activities Even when you add your contribs straight into the wiki, do not forget to add your partner name to the googledoc and add "(Wiki)" so I keep informed. As said in the googledoc the 6 possible sections you may contribute with entries (the googledoc includes examples) are: 1. Participation in Events (Presentations, round tables, keynotes...) 2. Scientific Papers and Panels 3. Book chapters 4. Training materials & Tutorials 5. Collaboration Meetings/Actions 6. Press Releases and other relevant Communication actions Normally, most partners will have contribs to 1 and 2 sections. Deadline for this is next monday April 14th EoB. Should you have any question/comment, please do contact me. Thanks in advance for your kind cooperation. Best regards, -- ---------------------------------------------------------------------------- -------------------------------------------- Carlos Ralli Ucendo ( ralli at tid.es) Cell: +34696923588 Twitter: @carlosralli Blog: http://the-internet6.blogspot.com.es Telef?nica I+D SAU Madrid, Spain ---------------------------------------------------------------------------- -------------------------------------------- Follow FI-WARE project (Future Internet Services Core Platform): Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: @fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------------- -------------------------------------------- _____ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx --- Questa e-mail ? priva di virus e malware perch? ? attiva la protezione avast! Antivirus. http://www.avast.com -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.jpg Type: image/jpeg Size: 1646 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D.1.2.6 - WP12 - M31-M36 - UNIROMA1_2014_04_10.doc Type: application/msword Size: 47104 bytes Desc: not available URL: From sergg at tid.es Wed Apr 23 13:09:44 2014 From: sergg at tid.es (SERGIO GARCIA GOMEZ) Date: Wed, 23 Apr 2014 11:09:44 +0000 Subject: [Fiware-data] Canceled: FI-WARE WP6 Call Message-ID: <03BE306058976141B4883174DF62D54D012AABD673@EX10-MB1-MAD.hi.inet> Just in case... I remove the calendar entry. As I told you in the last call, today is a local holiday. Funny way to spend it ... ;-) Minutes and agendas: https://docs.google.com/spreadsheet/ccc?key=0AgKkYKvfz1EsdDhFZFh5dWw5cWQ0a3JPQlpRS1VlNWc#gid=6 Bridge: PIN 001633 * Belgium 070 35 99 94 * France 0821 230 748 * Germany 01803 001 178 * Italy 848 390 166 * Netherlands 0870 001 909 * Spain 902 885 318 * Sweden 0939 2066 400 * Switzerland 0848 560 190 * United Kingdom 0844 4 73 73 73 cell number 87373 * Other countries and details http://pdf.powwownow.com/pdf/USA_en_pwn-dial-in-numbers.pdf * Worldwide & SkypeOut +49 1803 001 178 +44 844 4 73 73 73 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 3907 bytes Desc: not available URL: From sergg at tid.es Wed Apr 30 11:46:30 2014 From: sergg at tid.es (SERGIO GARCIA GOMEZ) Date: Wed, 30 Apr 2014 09:46:30 +0000 Subject: [Fiware-data] Call today focused on M36 -> Siemens Message-ID: <03BE306058976141B4883174DF62D54D012AAD7E34@EX10-MB1-MAD.hi.inet> Hi all, I will dedicate today?s call to review and close Siemens? contributions, who are stopping their participation now. For the rest of the people, your attendance is not required. Best Regards, Sergio. -- Sergio Garcia Gomez Telefonica (TI+D) SmartCity Solutions / FI-WARE Parque Tecnologico de Boecillo. 47151 Boecillo (Valladolid), SPAIN. E-mail: sergg at tid.es Phone: (+34) 9131.29098 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: