Dear Colleagues

 

At the end the final purpose of this "pick and choose" platform strategy, as described the reviewers in M18 review report, is to determinate the real added value provided by FI WARE, selecting among the 90 GEs or potential Instances  the ones with real market potential (USDL, CEP, IoT ..., PaaS+Big Data,...) in identified industries, because is something that is not currently in the market or with very limited presence or with real added value respect to current ones and has been tested by:

-          Market analysis

-          UC feedback on these GE and Instances

-          Individual Exploitation Plans from FI WARE partners for the GEs or Instances identified/prioritized individually by partner

 

Thanks for your collaboration

 

Juan

 

  

  Juan Bareño

  Group Innovation, Business Development & Strategy

  Research & Innovation

  +34 912148859

  Calle Albarracín 25, 28037 Madrid

 juan.bareno at atos.net

   www.atos.net <http://www.atos.net/> 

  

 

From: fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] On Behalf Of Juan Bareño Guerenabarrena
Sent: lunes, 06 de mayo de 2013 11:57
To: fiware-exploitation at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu
Cc: jaimemartin at eprosima.com; antonio.fuentes at rediris.es
Subject: Re: [Fiware-wpl] ACTION 3: To Update of the individual exploitationplans, last version from M18- directly into the ANNEX I from D11.2.2 Document

 

Dear Colleagues

 

Just 2 exploitation plans updated so far please update them in a separate word template as SIEMENS and Intel did, see folders below

 

Regarding the update please take into account the recommendations form the M18 Review cited below, that summarizing want us to identify:

-          The main FIWARE outcomes (which concrete GEs and Instances are we going to exploit and how we are going to exploit or sell these concrete ones: Cloud Stack, PaaS, Big Data....)

-          In which ecosystems are you going to focus or prioritize (M2M, Big Data, PaaS...)including industrial partners as utilities, cities....

 

·         "Given that there is apparently no intention of joint exploitation between the industrial partners of FI-WARE, FI-WARE is in essence a set of independent GEs for "pick-and-choose", rather than a (core) platform. It needs to be positioned as such. The industrial partners are especially urged to improve their own exploitation planning documentation, taking into account the analysis and conclusions reached at the general level

·         Accordingly, Annex I must be fully updated to reflect the more tangible business view of the industrial partner and a lot more substantive in describing the planned integration of the FI-WARE outcomes into the mainstream business of the industrial partners. 

·         Especially at the industrial partner level, leading to concrete plans for fit-for-deployment FI-WARE instances and other productization opportunities

·         Engagement FI WARE outcomes with your corporate strategy

o   In which ecosystems are you going to focus or prioritize. Specifically, ecosystem formation needs to be prioritized strategically. In this respect, we continue to encourage the industrial partners to more actively and extensively engage senior business management to be involved in the exploitation and impact creation activity of the project"

 

 

Thanks

 

Juan

 

 

 

 

  Juan Bareño

  Group Innovation, Business Development & Strategy

  Research & Innovation

  +34 912148859

  Calle Albarracín 25, 28037 Madrid

 juan.bareno at atos.net

   www.atos.net <http://www.atos.net/> 

 

 

From: Juan Bareño Guerenabarrena 
Sent: martes, 30 de abril de 2013 13:08
To: 'fiware-exploitation at lists.fi-ware.eu' (fiware-exploitation at lists.fi-ware.eu); 'fiware-wpl at lists.fi-ware.eu' (fiware-wpl at lists.fi-ware.eu)
Cc: 'jaimemartin at eprosima.com'; 'antonio.fuentes at rediris.es'; Miguel Carrillo (mcp at tid.es)
Subject: RE: ACTION 3: To Update of the individual exploitation plans, last version from M18- directly into the ANNEX I from D11.2.2 Document

 

Dear Colleagues

 

Please update into the Forge, as a separated document, named  XXXX Exploitation plan M24 with all the track changes and I will include it into the deliverable

 

Thanks

 

Juan

 

 

 

  Juan Bareño

  Group Innovation, Business Development & Strategy

  Research & Innovation

  +34 912148859

  Calle Albarracín 25, 28037 Madrid

 juan.bareno at atos.net

   www.atos.net <http://www.atos.net/> 

 

 

From: Juan Bareño Guerenabarrena 
Sent: lunes, 29 de abril de 2013 16:31
To: 'fiware-exploitation at lists.fi-ware.eu' (fiware-exploitation at lists.fi-ware.eu); 'fiware-wpl at lists.fi-ware.eu' (fiware-wpl at lists.fi-ware.eu)
Cc: 'jaimemartin at eprosima.com'; 'antonio.fuentes at rediris.es'; Miguel Carrillo (mcp at tid.es)
Subject: ACTION 3: To Update of the individual exploitation plans, last version from M18- directly into the ANNEX I from D11.2.2 Document

 

Dear Colleagues

 

Regarding ACTION 3:  To Update of the individual exploitation plans, last version from M18, please do that directly into the document  within the folder "Work Versions", "WP11 Final Deliverables M24" WP11.2.2 Exploitation Plan ANNEX I https://forge.fi-ware.eu/docman/index.php?group_id=16 <https://forge.fi-ware.eu/docman/index.php?group_id=16>  - Each FI WARE Partner before 3rd of May. Not use the wiki links as the last version do not content the initial questions answered into the M12 Review

 

"Given that there is apparently no intention of joint exploitation between the industrial partners of FI-WARE, The industrial partners are especially urged to improve their own exploitation planning documentation, taking into account the analysis and conclusions reached at the general level

·         Accordingly, Annex I must be fully updated to reflect the more tangible business view of the industrial partner and a lot more substantive in describing the planned integration of the FI-WARE outcomes into the mainstream business of the industrial partners. 

·         Especially at the industrial partner level, leading to concrete plans for fit-for-deployment FI-WARE instances and other productization opportunities

·         Engagement FI WARE outcomes with your corporate strategy

o   In which ecosystems are you going to focus or prioritize. Specifically, ecosystem formation needs to be prioritized strategically. In this respect, we continue to encourage the industrial partners to more actively and extensively engage senior business management to be involved in the exploitation and impact creation activity of the project"

 

For the new comers eprosima and red.es please follow the same structure and answer the following questions:

 

*	Organization Profile
*	FI-WARE relevance in your current business model
*	Identification of main project outcomes
*	How are you going to exploit the project results in distinct environments? 
*	Which customers do we want to serve?
*	Which channels will be used to reach the various customer segments?
*	Which benefits are the participants going to take to the market thanks to FIWARE?
*	How are the benefits going to be sold?
*	How will the sales process work?
*	Globalisation of the exploitation plan
*	How will make money from FIWARE Platform?

 

 

Thanks

 

Juan

 

 

From: Juan Bareño Guerenabarrena 
Sent: miércoles, 24 de abril de 2013 19:40
To: 'fiware-exploitation at lists.fi-ware.eu' (fiware-exploitation at lists.fi-ware.eu)
Cc: 'fiware-wpl at lists.fi-ware.eu' (fiware-wpl at lists.fi-ware.eu); fiware-pcc at lists.fi-ware.eu
Subject: FW: [Fiware-exploitation] WP11 Deliverables Submission Roadmap for M24

 

Dear Colleagues

 

Please find here enclosed in the following link https://forge.fi-ware.eu/docman/index.php?group_id=16 <https://forge.fi-ware.eu/docman/index.php?group_id=16>  and within the folder "Work Versions", "WP11 Final Deliverables M24" the following first draft deliverables, pending to complete and fine-tuning:

 

-          D11.1.2-Market and Competition Analysis _M24v2404

o   The document describe the following:

§  Rise on 3rd party platforms and Economy of Internet Apps

·         Business Opportunities by Tech (Cloud, Big Data, IoT, USDL...and GE combinations)

·         Business Opportunities by Sector/Industry (Smart Cities, Smart Industry (Grid, logistics, health....) and Smart Home)

§  The new basis of competition and the superiority of ecosystem economics

·         The superiority of ecosystem economics

·         Ecosystems as a new distribution channel     

·         Ecosystem engineering           

·         What is the correct service ecosystem approach with startups and first "external" users of an ICT platform?

§  The biggest challenges for app businesses (and what to do about them)

§  The success factors for app store-like platform businesses from the perspective of third-party developers

§  European Context and trends (barriers, policy...)

o   ACTION1: Please review Business Opportunities by domain (Cloud, Data, Iot....) and complete the identified missing inputs and provide feedback - Each WPL its domain and the rest helping, before 3rd of May

 

-          D11.2.2 Exploitation_Plan,_including_IPR_Managementv_M24v2404

o   The document describe the following

§  FI-WARE Product Vision by domain: Identify the main Generic Enablers+ FI-WARE Instances with most market potential

§  FI WARE Market Positioning: GE Development Prioritization Matrix

§  FI WARE IPR Management

§  FI WARE  Ecosystem Strategy and Business Model

§  Individual Exploitation Plans

o   ACTION 2: Please review it Product Vision by domain (Cloud, Data, Iot....) and complete the identified missing inputs (Use Case Scenarios and Business Canvas)  and provide feedback - Each WPL its domain and the rest helping, before 3rd of May

o   ACTION 3:  To Update of the individual exploitation plans, last version from M18, into the document or into the wiki https://forge.fi-ware.eu/plugins/mediawiki/wiki/exploitation/index.php/Individual- Each FI WARE Partner before 3rd of May

 

"Given that there is apparently no intention of joint exploitation between the industrial partners of FI-WARE, The industrial partners are especially urged to improve their own exploitation planning documentation, taking into account the analysis and conclusions reached at the general level

·         Accordingly, Annex I must be fully updated to reflect the more tangible business view of the industrial partner and a lot more substantive in describing the planned integration of the FI-WARE outcomes into the mainstream business of the industrial partners. 

·         Especially at the industrial partner level, leading to concrete plans for fit-for-deployment FI-WARE instances and other productization opportunities

·         Engagement FI WARE outcomes with your corporate strategy

o   In which ecosystems are you going to focus or prioritize. Specifically, ecosystem formation needs to be prioritized strategically. In this respect, we continue to encourage the industrial partners to more actively and extensively engage senior business management to be involved in the exploitation and impact creation activity of the project"

 

Thanks for your collaboration

 

Juan

 

 

  Juan Bareño

  Group Innovation, Business Development & Strategy

  Research & Innovation

  +34 912148859

  Calle Albarracín 25, 28037 Madrid

 juan.bareno at atos.net

   www.atos.net <http://www.atos.net/> 

 

 

From: fiware-exploitation-bounces at lists.fi-ware.eu [mailto:fiware-exploitation-bounces at lists.fi-ware.eu] On Behalf Of Juan Bareño Guerenabarrena
Sent: miércoles, 17 de abril de 2013 19:08
To: fiware-wpl at lists.fi-ware.eu; fiware-exploitation at lists.fi-ware.eu
Cc: fiware-pcc at lists.fi-ware.eu
Subject: [Fiware-exploitation] WP11 Deliverables Submission Roadmap for M24

 

Dear Colleagues 

 

Following with the submission of Exploitation Deliverables on M24, I enclosed you the following roadmap and the inputs needed to include in each deliverable according to the last comments and recommendations from the last review on M18.

 

Please feel free to suggest some indications or solutions to address the issues identified in each deliverable, based on the recommendations provided by the reviewers. For this work, we are going to leverage on the following draft documents:

 

-          11.1.2- Market Analysis

o   Rise on 3rd party platforms and Economy of Internet Apps

§  Business Opportunities by Tech (Cloud, Big Data, IoT, USDL...and GE combinations)

§  Business Opportunities by Sector/Industry (Smart Cities, Smart Industry (Grid, logistics, health....) and Smart Home)

o   The new basis of competition and the superiority of ecosystem economics

§  The superiority of ecosystem economics

§  Ecosystems as a new distribution channel     

§  Ecosystem engineering           

§  What is the correct service ecosystem approach with startups and first "external" users of an ICT platform?

o   The biggest challenges for app businesses (and what to do about them)

o   The success factors for app store-like platform businesses from the perspective of third-party developers

o   European Context and trends (barriers, policy...)

-          First Draft of the Whitepaper about Product Vision for identify main use case scenarios and demonstrate the main advantages offered by FI WARE in each domain and identify the main and more potential instances or combinations of GE (PaaS+Big Data, IoT+Big Data.....)- Any advance on this whitepaper?

§  What GEs can be used in combinations with what other GEs? 

§  Do certain GEs force you to use other GEs? 

§  How about interoperability? 

§  Where is the integration burden, with FI-WARE or the users?

-          Exploitation and business modeling position paper prepared together with CONCORD and that will be finished on April this month

-          Assessment of market traction of the relevant GEs in those specific domains of the emerging FI-PPP Phase 1- Feedback from UC questionnaire sent by FI WARE

-          Exploring Policy and Regulatory Challenges paper prepared together with CONCORD- Finished

-          Open Innovation Lab

o   Terms and Conditions- Status?

o   Establish the strategy and implementation plan to evolve the FI-WARE Testbed into the "backbone" of the Open Innovation Lab- Any advance on this side?

-          Third party developers' feedback to the available GEs

-          Third party Enablement deliverable new version- Is there a new version available?

-          European Patent System- The policy context for IPR, including the latest development on the matter

 

Resubmission Roadmap: All Deliverables sent on the 15th May

 

-          Monday 22nd April- I will send you an initial and significant completed draft of the following three deliverables trying to address the following recommendations provided by reviewers on M18:

 

o   D11.1.2 Market and Competition Analysis (M24)

§  The consortium is urged to keep the parallel segment of Smart Business in dual focus with Smart Cities

§  Specifically, ecosystem formation needs to be prioritized strategically

·         The challenge for future versions is to apply the new insights to broaden and deepen the analysis of FI-WARE's own business ecosystem, and relate the present high level view of this ecosystem to the more specific analysis within the GE chapters

§  Additionally, it would be useful to provide assessment of market traction of the relevant GEs in those specific domains of the FI-PPP Use Case projects

§  From the conclusion of this document, it is clear that third party innovation enablement will be critical, and it is also intimately linked to building a critical mass for FI-WARE results.

·         This theme should be further developed from a market and competitive perspective, in close synergy with and inputting directly to the forthcoming deliverables D2.5.2 and D2.5.3 regarding third party uptake

 

o   D11.2.2 Exploitation Plan, including IPR Management (M24)

§  Providing usage scenarios, potential usage patterns (including the 'typical' combined use of GEs),  an overview of the status of available GEs including level of Use Case interest, a clear schedule of future GE Releases

§  Give due and sufficient business consideration to the competitiveness of the GEs with respect to their market benchmarking, innovation potential and attractiveness) for both business and development communities.

§  Focus on applying 'promising' technologies such as USDL and high impact areas such as IoT.

·         Provide additional analysis and target promising business ecosystems for GE uptake, beyond Smart Cities. 

§  Provide clear evidence of business planning in the targeted areas through (combined) implementation of GEs. 

·         As a specific suggestion, the market potential of the individual GEs or groupings of GEs could be even more sharply indicated, and possibly even contrasted and prioritized

§  OIL description

·         A significant number of critical issues have to be addressed that will ultimately respond to the third party question "Why and how FI-WARE is going to help me to innovate?" 

o   From a practical standpoint more detail is required relating to access, licensing and utilization rights.

o   Also not yet appropriately addressed is the topic of packaging in terms of what the application developer can access to build FI solutions, such as a starter-kit.

§  The concrete offering and strategy towards attracting relevant communities remains unclear. 

·         Fostering developer communities fall within the scope of Open Call 3 (launched in December 2012). This however does not mean that present partners can derogate all responsibilities of involving potential users and stakeholders to the future Open Call 3 partners

§  IPR Management: Regarding a possible integration strategy, the Month 15 Whitepaper about common usage scenarios (and potential usage patterns) for the GEs is long overdue. The issue was also raised by some of the new Phase 2 projects: 

·         What GEs can be used in combinations with what other GEs? 

·         Do certain GEs force you to use other GEs? 

·         How about interoperability? 

·         Where is the integration burden, with FI-WARE or the users?

§  Establish the strategy and implementation plan to evolve the FI-WARE Testbed into the "backbone" of the Open Innovation Lab, in collaboration and synergy with the upcoming FIPPP Phase 2 Capability Building project.

 

o   D11.3.2 Market and Policy Regulation Awareness Report (M24)

§  Further development of the issues and themes in Section 4.2 from 11.3.1.b is expected, among others, for the next version. 

§  The policy context for IPR, including the latest development on the European Patent System, would deserve greater attention in the next version

§  It is also encouraging to see more consideration of the platform issues from a regulatory perspective, which should be deepened in the next version

 

o   11.4.3 Standardization (M27)

§  Please provide feedback to the NEC requirements as an oral update has to be provided in the next review meeting (M24)

 

 

-          Wednesday 30th April- 

 

o   To Review or complete the identified missing inputs and provide feedback  about the three before mentioned deliverables 11.1.2, 11.2.2 and 11.3.2

o   To Update of the individual exploitation plans into the wiki: 

§  Given that there is apparently no intention of joint exploitation between the industrial partners of FI-WARE, The industrial partners are especially urged to improve their own exploitation planning documentation, taking into account the analysis and conclusions reached at the general level

·         Accordingly, Annex I must be fully updated to reflect the more tangible business view of the industrial partner and a lot more substantive in describing the planned integration of the FI-WARE outcomes into the mainstream business of the industrial partners. 

·         Especially at the industrial partner level, leading to concrete plans for fit-for-deployment FI-WARE instances and other productization opportunities

§  Engagement FI WARE outcomes with your corporate strategy

·         Also welcomed is the emphasis given on "open model", "open solution", "open services", "open innovation", "open ecosystem" etc. How to start an ecosystem or leverage existing ones remains to be answered though. Equally, what does 'openness' mean beyond marketing, and concretely how it is to be applied in corporate strategy such as on the FI-WARE instances, need to be clarified.

·         One good example in this respect is the very specific description provided in the Orange presentation in Seville, which clearly explains how usage of several sets of FI-WARE results is linked to its corporate strategy in engaging with the evolution of the services market.

·         In which ecosystems are you going to focus or prioritize. Specifically, ecosystem formation needs to be prioritized strategically. In this respect, we continue to encourage the industrial partners to more actively and extensively engage senior business management to be involved in the exploitation and impact creation activity of the project.

 

-          Friday 10th May- I will consolidate all the outputs and feedback received

 

-          Monday 13th and Tuesday 14th - Final review and validation will take place

 

-          Wednesday 15th May - We will send the final deliverables

 

 

Thanks for your collaboration  

 

Juan

 

 

 

  Juan Bareño

  Group Innovation, Business Development & Strategy

  Research & Innovation

  +34 912148859

  Calle Albarracín 25, 28037 Madrid

 juan.bareno at atos.net

   www.atos.net <http://www.atos.net/> 

 

 

 

------------------------------------------------------------------
This e-mail and the documents attached are confidential and intended 
solely for the addressee; it may also be privileged. If you receive 
this e-mail in error, please notify the sender immediately and destroy it. 
As its integrity cannot be secured on the Internet, the Atos 
group liability cannot be triggered for the message content. Although 
the sender endeavours to maintain a computer virus-free network, 
the sender does not warrant that this transmission is virus-free and 
will not be liable for any damages resulting from any virus transmitted. 

Este mensaje y los ficheros adjuntos pueden contener informacion confidencial 
destinada solamente a la(s) persona(s) mencionadas anteriormente 
pueden estar protegidos por secreto profesional. 
Si usted recibe este correo electronico por error, gracias por informar 
inmediatamente al remitente y destruir el mensaje. 
Al no estar asegurada la integridad de este mensaje sobre la red, Atos 
no se hace responsable por su contenido. Su contenido no constituye ningun 
compromiso para el grupo Atos, salvo ratificacion escrita por ambas partes. 
Aunque se esfuerza al maximo por mantener su red libre de virus, el emisor 
no puede garantizar nada al respecto y no sera responsable de cualesquiera 
danos que puedan resultar de una transmision de virus. 
------------------------------------------------------------------

 

------------------------------------------------------------------
This e-mail and the documents attached are confidential and intended 
solely for the addressee; it may also be privileged. If you receive 
this e-mail in error, please notify the sender immediately and destroy it. 
As its integrity cannot be secured on the Internet, the Atos 
group liability cannot be triggered for the message content. Although 
the sender endeavours to maintain a computer virus-free network, 
the sender does not warrant that this transmission is virus-free and 
will not be liable for any damages resulting from any virus transmitted. 

Este mensaje y los ficheros adjuntos pueden contener informacion confidencial 
destinada solamente a la(s) persona(s) mencionadas anteriormente 
pueden estar protegidos por secreto profesional. 
Si usted recibe este correo electronico por error, gracias por informar 
inmediatamente al remitente y destruir el mensaje. 
Al no estar asegurada la integridad de este mensaje sobre la red, Atos 
no se hace responsable por su contenido. Su contenido no constituye ningun 
compromiso para el grupo Atos, salvo ratificacion escrita por ambas partes. 
Aunque se esfuerza al maximo por mantener su red libre de virus, el emisor 
no puede garantizar nada al respecto y no sera responsable de cualesquiera 
danos que puedan resultar de una transmision de virus. 
------------------------------------------------------------------

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.fiware.org/private/old-fiware-exploitation/attachments/20130506/cc8f9895/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.png
Type: image/png
Size: 339 bytes
Desc: image002.png
URL: <https://lists.fiware.org/private/old-fiware-exploitation/attachments/20130506/cc8f9895/attachment.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.gif
Type: image/gif
Size: 4064 bytes
Desc: image003.gif
URL: <https://lists.fiware.org/private/old-fiware-exploitation/attachments/20130506/cc8f9895/attachment.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image004.jpg
Type: image/jpeg
Size: 76225 bytes
Desc: image004.jpg
URL: <https://lists.fiware.org/private/old-fiware-exploitation/attachments/20130506/cc8f9895/attachment.jpg>


More information about the Old-Fiware-exploitation mailing list

You can get more information about our cookies and privacy policies clicking on the following links: Privacy policy   Cookies policy