From Lindsay.Frost at neclab.eu Tue Apr 8 20:54:16 2014 From: Lindsay.Frost at neclab.eu (Lindsay Frost) Date: Tue, 8 Apr 2014 18:54:16 +0000 Subject: [Fiware-exploitation] WP11 Tasks for partners leaving on M36 --- alphabet soup, pasta and Chili con Carne Message-ID: <58967817BA9AEA4E92A38F89CE2EA93269695484@DAPHNIS.office.hd> A non-text attachment was scrubbed... Name: smime.p7m Type: application/pkcs7-mime Size: 80470 bytes Desc: not available URL: From juan.bareno at atos.net Tue Apr 8 20:08:43 2014 From: juan.bareno at atos.net (Bareno Guerenabarrena, Juan) Date: Tue, 8 Apr 2014 18:08:43 +0000 Subject: [Fiware-exploitation] WP11 Tasks for partners leaving on M36 Message-ID: <08F06C5778F5DE41AD2ACEF1BBD8EC9306A96C@DEFTHW99EX5MSX.ww931.my-it-solutions.net> Dear Colleagues I need your contributions to WP11 deliverables before you leave the project on M36. My colleague Lindsay Frost from NEC, in cc, should demand your contributions for standardization deliverable. Basically I need the following: - Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. o All the individual exploitation plans should be described in the Annex 1 of the D11.2.3 o Just additional/significative info that should be consider as confidential could be delivered in a confidential basis to Arian (Arian.ZWEGERS at ec.europa.eu) o We will make a follow-up in the next WPL meetings - WP3 contribution, as SAP leads it, regarding D11.1.3- Apps - Market Analysis (state of art, competitors, similar solutions in the market, potential added value, potential business models...) and D11.2.3- FI WARE Apps building block Exploitation (added value, business model selected, FI-Lab modus operandi.....)- SEE Initial draft TOCs attached and add or provide reference documents to complete - Please take into account the following recommendations for the next review, some contribution (reference text, studies, references...) for the following recommendations for the review, will be very welcome and appreciated: D11.1.3- Market Analysis * Analysis of last review recommendations analysis o Continue to analyze ICT Market situation in relation with GEs o The exploitation of FI technologies in the three main market sectors of Smart Cities, Smart Business, and Smart Home needs to be deepened o The perspectives of the demand side are comparatively lacking even for the main verticals identified, e.g. business related services and manufacturing o The policy and regulatory analysis in relation to the specific themes (Data protection, Cloud Computing, FI-LAB modus operandi) D11.2.3- Exploitation Plan * FI-LAB Modus Operandi, Financing and Business model definition is needed and even how this vehicle is to be created in the first instance is totally opaque and uncertain. * To define the extent of collaboration with the EIT ICT lab * The potential policy issues and impact on the specific exploitation activities of FI-WARE partners and the evolution of the FI LAB should be more specifically identified and described * At a detailed level, the document is less concrete in the examples and scenario descriptions provided in the Apps market sections. Some statements might be (even) more convincing if backed up by survey results; e.g. the business opportunity of the M2M market * Individual exploitation plans, from the partners in the list below, following the instructions defined in each individual partner profile, see Annex 1- D11.2.3 attached. D11.4.3- Standardization * A Standardization Global Picture is required, as an effective means to enable market uptake of FI WARE results Juan Bare?o Research & Innovation Account Executive European Union Institutions-Iberia T. +34 912 148 859 M. +34 625 598 216 juan.bareno at atos.net Albarrac?n, 25 28037 Madrid - Spain atos.net [cid:image002.png at 01CF21D2.D8BA98F0] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: Picture (Device Independent Bitmap) 1.jpg Type: image/jpeg Size: 9354 bytes Desc: Picture (Device Independent Bitmap) 1.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: Picture (Device Independent Bitmap) 2.jpg Type: image/jpeg Size: 3257 bytes Desc: Picture (Device Independent Bitmap) 2.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: Picture (Device Independent Bitmap) 3.jpg Type: image/jpeg Size: 4657 bytes Desc: Picture (Device Independent Bitmap) 3.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D11.2.3 Exploitation_Plan,_including_IPR_Managementv_M36 v1.doc Type: application/msword Size: 3511808 bytes Desc: D11.2.3 Exploitation_Plan,_including_IPR_Managementv_M36 v1.doc URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: D11.1.3-Market and Competition Analysis _M36v3.doc Type: application/msword Size: 5323776 bytes Desc: D11.1.3-Market and Competition Analysis _M36v3.doc URL: