From pierangelo.garino at telecomitalia.it Tue Jan 14 09:30:32 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Tue, 14 Jan 2014 09:30:32 +0100 Subject: [Fiware-i2nd] Anticipating actions concerning deliverables preparation and other important items Message-ID: Dear Partners, in view of the periodic I2ND confcall this week, I anticipate a few items originated in the WPL/WPA call yesterday, that need to be addressed as soon as possible as the deadlines are rather tight (we'll come however back on them during the call). Here are the items: - Deliverables R3 (SW, Inst&Admin, User&Pgmr, Unit Testing) o We need to make them available for final review immediately, but I need to complete first a review on my side. o I'll make a check on the status, but I kindly ask the GEi Teams to provide me the current situation via mail by today (Tue 14th) - Architecture and Open Specs o I'm aware at least one GE architecture is being updated, as well as a number of Open Specs APIs, and the pages are currently in the I2ND wiki (later there will be a common cockpit in the 'fiware-private' wiki) o Deadline here is to release the pages for review by Jan 24th o Again I kindly ask the GEi Teams to provide me the current situation, preferrably via mail or during the I2ND call on Thursday at the latest - Third Party Innovation Enablement o As you know this is a long awaited update to the original D2.5.1 document. I already asked for an update, but I received a feedback only by ALU-D. o During the WPL/WPA call we have agreed that a number of additional information should be added in the current document o I'll send you a detailed mail (and document update) later today (the deadline is deliverable completion is end of this week!) - Technical Roadmap o Deadline for releasing this deliverable is Jan 21st so: o Please make sure that your description is updated before that date o In case of Features that will not be completed in the R3 of FI-WARE e.g. for those GEis the EC recommended to stop further functionality developments, there will be a common description to be inserted, but this will be done in close cooperation with the WPL. Please provide the list of such Features during the call on Thursday. - State of the Art o This deliverable will be updated by adding an executive summary per each chapter, starting from the previous version o No other updates will be done, except in case you feel them very important - Backlog items o Please all check the 'hot topic' and dashboard tables distributed by Manuel yesterday (attached to this mail as well) ? All owners of an item with issues should address them asap ? For the hot topic aspects, it is expected that a reference to the relevant deliverable is placed in the 'Detailed description' field of the ticket (e.g. This item concerns Deliverable=D7.2.3, this was explained by Gianmario some time ago) - Finally, the issue of GEis for which EC recommended to stop developments o The Project Coordinator will ask more details to P.O. asap o It is assumed that ? Development of New Features as in the Materialising/Roadmap should be stopped for those GEis mentioned (Altoclient, VNP, VNEIC, S3C, Cloud Proxy). On the other hand, based on current DoW there shouldn't be new Features developed beyond M33 (i.e. this month) anyway. ? Integration 'packaging' and support activities to UCPs should continue (it is bound to the FI-PPP signed agreements), which includes documentation preparation, SW release, packaging of open source version of GEi, modifications required by UCPs (e.g. integration in cloud proxy of the IoT Protocol Adapter) Please take care of the most urgent actions defined above, and we'll discuss the others in the call on Thursday. BR Pier ------------------------------------------------------------------ Telecom Italia Pierangelo Garino Innovation - Research & Prototyping Via G. Reiss Romoli 274, I-10148 TORINO Tel: +39 011 228 7142 Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [rispetta l'ambiente]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.i2nd.dashboard.20140113.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 336116 bytes Desc: FIWARE.backlog.i2nd.dashboard.20140113.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.deliveryM33.search.20140113.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 125090 bytes Desc: FIWARE.backlog.deliveryM33.search.20140113.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: logo Ambiente_foglia2.jpg Type: image/jpeg Size: 677 bytes Desc: logo Ambiente_foglia2.jpg URL: From pierangelo.garino at telecomitalia.it Wed Jan 15 15:22:57 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Wed, 15 Jan 2014 15:22:57 +0100 Subject: [Fiware-i2nd] I2ND Periodic Conference - FI-WARE Message-ID: Dear All, As usual I send the reminder for the I2ND call tomorrow. The agenda proposed is aligned to the topics of the mail I sent yesterday, i.e. deliverables, backlog and R3 releases (+ the AOB item as usual). Talk to you tomorrow! Pier This is the new calendar reminder for the periodic I2ND call, occurring every two weeks. The following shared doc will be used to collect minutes: https://docs.google.com/document/d/1QYDZ6lHZIupu0scwqENuBTKQH5SLnXEQ8i7H5KRqG0k/edit Call details: PIN: 075102 Dial-in number: 1 415 363 0833, (International Dial-in Numbers +44 844 4 73 73 73 / +49 1803 001 178). Local numbers are available in the attached pdf. Instructions: 1. Dial the conference number at the time indicated above 2. Enter the PIN, when prompted 3. Speak your full name when prompted and then you will join the conference. If you are the first person to arrive on the conference call, you will hear music. As others arrive on the call you will hear them being announced. Find out how much easier your life could be with Powwownow's free conference calling service. Powwownow - get together whenever! http://www.powwownow.com Pier Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [cid:00000000000000000000000000000003 at TI.Disclaimer]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 4926 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: USA_en_pwn-dial-in-numbers.pdf Type: application/pdf Size: 61516 bytes Desc: USA_en_pwn-dial-in-numbers.pdf URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: logo Ambiente_foglia2.jpg Type: image/jpeg Size: 677 bytes Desc: logo Ambiente_foglia2.jpg URL: From pierangelo.garino at telecomitalia.it Wed Jan 22 17:42:50 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Wed, 22 Jan 2014 17:42:50 +0100 Subject: [Fiware-i2nd] R: Anticipating actions concerning deliverables preparation and other important items - DELIVERABLES R3 Message-ID: Dear All, I attach an excel sheet where I have attempted to take a 'snapshot' of current deliverablesR3 development/update status. You'll find two sheets, the first devoted to S3C only, as it contains a lot of components, the second devoted to all other GEis. As you will see, situation is still rather incomplete, green cells mean the manual was ready and sent to Miguel for his final review. Yellow colour means that updates are pending and/or I need to do my review. Red cells are those for which I'm not sure what's going on, and/or situation looks to me rather critical. I kindly ask you to provide me any feedback in case I overlooked some of your feedback and the pages are already available for my review. You're anyway asked to urgently complete the missing or not complete pages, as time is really over (original deadline was 15 December!): I need to go through those pages for my review before sending them to Miguel for his final checks, and this takes a lot of time, as usually I also find inconsistencies which I have to send back to you for other updates. Although this mail is sent to the whole I2ND reflector, and sometimes this might read like 'it's not a mail sent to me', all of you (mandatory for GEi owners...) should carefully check the excel file contents: I have already inserted some reference name, but maybe some other needs to be added. Let me define the following deadlines: - Tomorrow EOB (i.e. Jan 23) I need to have all the pages ready for my review - Friday 24 I'll do their review, please be ready to react to possible comments I might forward you. (BTW, Fri 24 is also the deadline for Architecture updates... don't forget it) - Monday 27 all the pages available and updated according to my review will be sent to Miguel The pages I don't receive tomorrow will be reviewed later, i.e. when I have time, and their delivery to Miguel will be postponed accordingly Thanks a lot for your cooperation on this activity. BR Pier Da: fiware-i2nd-bounces at lists.fi-ware.eu [mailto:fiware-i2nd-bounces at lists.fi-ware.eu] Per conto di Garino Pierangelo Inviato: marted? 14 gennaio 2014 09:31 A: fiware-i2nd at lists.fi-ware.eu Oggetto: [Fiware-i2nd] Anticipating actions concerning deliverables preparation and other important items Dear Partners, in view of the periodic I2ND confcall this week, I anticipate a few items originated in the WPL/WPA call yesterday, that need to be addressed as soon as possible as the deadlines are rather tight (we'll come however back on them during the call). Here are the items: - Deliverables R3 (SW, Inst&Admin, User&Pgmr, Unit Testing) o We need to make them available for final review immediately, but I need to complete first a review on my side. o I'll make a check on the status, but I kindly ask the GEi Teams to provide me the current situation via mail by today (Tue 14th) - Architecture and Open Specs o I'm aware at least one GE architecture is being updated, as well as a number of Open Specs APIs, and the pages are currently in the I2ND wiki (later there will be a common cockpit in the 'fiware-private' wiki) o Deadline here is to release the pages for review by Jan 24th o Again I kindly ask the GEi Teams to provide me the current situation, preferrably via mail or during the I2ND call on Thursday at the latest - Third Party Innovation Enablement o As you know this is a long awaited update to the original D2.5.1 document. I already asked for an update, but I received a feedback only by ALU-D. o During the WPL/WPA call we have agreed that a number of additional information should be added in the current document o I'll send you a detailed mail (and document update) later today (the deadline is deliverable completion is end of this week!) - Technical Roadmap o Deadline for releasing this deliverable is Jan 21st so: o Please make sure that your description is updated before that date o In case of Features that will not be completed in the R3 of FI-WARE e.g. for those GEis the EC recommended to stop further functionality developments, there will be a common description to be inserted, but this will be done in close cooperation with the WPL. Please provide the list of such Features during the call on Thursday. - State of the Art o This deliverable will be updated by adding an executive summary per each chapter, starting from the previous version o No other updates will be done, except in case you feel them very important - Backlog items o Please all check the 'hot topic' and dashboard tables distributed by Manuel yesterday (attached to this mail as well) ? All owners of an item with issues should address them asap ? For the hot topic aspects, it is expected that a reference to the relevant deliverable is placed in the 'Detailed description' field of the ticket (e.g. This item concerns Deliverable=D7.2.3, this was explained by Gianmario some time ago) - Finally, the issue of GEis for which EC recommended to stop developments o The Project Coordinator will ask more details to P.O. asap o It is assumed that ? Development of New Features as in the Materialising/Roadmap should be stopped for those GEis mentioned (Altoclient, VNP, VNEIC, S3C, Cloud Proxy). On the other hand, based on current DoW there shouldn't be new Features developed beyond M33 (i.e. this month) anyway. ? Integration 'packaging' and support activities to UCPs should continue (it is bound to the FI-PPP signed agreements), which includes documentation preparation, SW release, packaging of open source version of GEi, modifications required by UCPs (e.g. integration in cloud proxy of the IoT Protocol Adapter) Please take care of the most urgent actions defined above, and we'll discuss the others in the call on Thursday. BR Pier ------------------------------------------------------------------ Telecom Italia Pierangelo Garino Innovation - Research & Prototyping Via G. Reiss Romoli 274, I-10148 TORINO Tel: +39 011 228 7142 Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [cid:image001.gif at 01CF1793.078A4FD0]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 677 bytes Desc: image001.gif URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: I2ND_wiki_manuals_22-Jan-14.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 22787 bytes Desc: I2ND_wiki_manuals_22-Jan-14.xlsx URL: From pierangelo.garino at telecomitalia.it Mon Jan 27 16:28:43 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Mon, 27 Jan 2014 16:28:43 +0100 Subject: [Fiware-i2nd] R: Anticipating actions concerning deliverables preparation and other important items - DELIVERABLES R3 Message-ID: Dear All, this is an update concerning the deliverableR3 status, according to what I did before 14:00 CET, and that I sent to Coordinator asking for final review. Situation is much better than last week, although there are still a few things to be addressed (see yellow and red entries). Two notes: - Please disregard situation of Open Specs, they are not up to date, as they had less priority until today. - Please owners of yellow/red entries react asap, it's very important we urgently close everything. I expect to have all the pages ready by tomorrow (Jan 28th) EOB One final comment: I had to move a lot of pages which were modified in the wrong place (e.g. in the public wiki instead of private one). Rules were clarified in several I2NC calls and through mails. I had to devote a lot of time to rearrange things, so I will not accept any longer pages modified in the wrong place: please check PhC minutes and mails and follow the rules defined there. In case the pages you have to modify or create are not present, please let me know. Also note that I moved those manual pages still in the i2nd wiki to the fi-ware-private one. In those cases, the page should have the initial header saying that the move was performed. Maybe the link to the newly created is not correct, because I didn't capture that the i2nd page name was not correct. With a minimum of searching in the fi-ware-private wiki, you'll find your moved page, ready for review. Thanks and BR Pier Da: Garino Pierangelo Inviato: mercoled? 22 gennaio 2014 17:43 A: fiware-i2nd at lists.fi-ware.eu Oggetto: R: [Fiware-i2nd] Anticipating actions concerning deliverables preparation and other important items - DELIVERABLES R3 Priorit?: Alta Dear All, I attach an excel sheet where I have attempted to take a 'snapshot' of current deliverablesR3 development/update status. You'll find two sheets, the first devoted to S3C only, as it contains a lot of components, the second devoted to all other GEis. As you will see, situation is still rather incomplete, green cells mean the manual was ready and sent to Miguel for his final review. Yellow colour means that updates are pending and/or I need to do my review. Red cells are those for which I'm not sure what's going on, and/or situation looks to me rather critical. I kindly ask you to provide me any feedback in case I overlooked some of your feedback and the pages are already available for my review. You're anyway asked to urgently complete the missing or not complete pages, as time is really over (original deadline was 15 December!): I need to go through those pages for my review before sending them to Miguel for his final checks, and this takes a lot of time, as usually I also find inconsistencies which I have to send back to you for other updates. Although this mail is sent to the whole I2ND reflector, and sometimes this might read like 'it's not a mail sent to me', all of you (mandatory for GEi owners...) should carefully check the excel file contents: I have already inserted some reference name, but maybe some other needs to be added. Let me define the following deadlines: - Tomorrow EOB (i.e. Jan 23) I need to have all the pages ready for my review - Friday 24 I'll do their review, please be ready to react to possible comments I might forward you. (BTW, Fri 24 is also the deadline for Architecture updates... don't forget it) - Monday 27 all the pages available and updated according to my review will be sent to Miguel The pages I don't receive tomorrow will be reviewed later, i.e. when I have time, and their delivery to Miguel will be postponed accordingly Thanks a lot for your cooperation on this activity. BR Pier Da: fiware-i2nd-bounces at lists.fi-ware.eu [mailto:fiware-i2nd-bounces at lists.fi-ware.eu] Per conto di Garino Pierangelo Inviato: marted? 14 gennaio 2014 09:31 A: fiware-i2nd at lists.fi-ware.eu Oggetto: [Fiware-i2nd] Anticipating actions concerning deliverables preparation and other important items Dear Partners, in view of the periodic I2ND confcall this week, I anticipate a few items originated in the WPL/WPA call yesterday, that need to be addressed as soon as possible as the deadlines are rather tight (we'll come however back on them during the call). Here are the items: - Deliverables R3 (SW, Inst&Admin, User&Pgmr, Unit Testing) o We need to make them available for final review immediately, but I need to complete first a review on my side. o I'll make a check on the status, but I kindly ask the GEi Teams to provide me the current situation via mail by today (Tue 14th) - Architecture and Open Specs o I'm aware at least one GE architecture is being updated, as well as a number of Open Specs APIs, and the pages are currently in the I2ND wiki (later there will be a common cockpit in the 'fiware-private' wiki) o Deadline here is to release the pages for review by Jan 24th o Again I kindly ask the GEi Teams to provide me the current situation, preferrably via mail or during the I2ND call on Thursday at the latest - Third Party Innovation Enablement o As you know this is a long awaited update to the original D2.5.1 document. I already asked for an update, but I received a feedback only by ALU-D. o During the WPL/WPA call we have agreed that a number of additional information should be added in the current document o I'll send you a detailed mail (and document update) later today (the deadline is deliverable completion is end of this week!) - Technical Roadmap o Deadline for releasing this deliverable is Jan 21st so: o Please make sure that your description is updated before that date o In case of Features that will not be completed in the R3 of FI-WARE e.g. for those GEis the EC recommended to stop further functionality developments, there will be a common description to be inserted, but this will be done in close cooperation with the WPL. Please provide the list of such Features during the call on Thursday. - State of the Art o This deliverable will be updated by adding an executive summary per each chapter, starting from the previous version o No other updates will be done, except in case you feel them very important - Backlog items o Please all check the 'hot topic' and dashboard tables distributed by Manuel yesterday (attached to this mail as well) ? All owners of an item with issues should address them asap ? For the hot topic aspects, it is expected that a reference to the relevant deliverable is placed in the 'Detailed description' field of the ticket (e.g. This item concerns Deliverable=D7.2.3, this was explained by Gianmario some time ago) - Finally, the issue of GEis for which EC recommended to stop developments o The Project Coordinator will ask more details to P.O. asap o It is assumed that ? Development of New Features as in the Materialising/Roadmap should be stopped for those GEis mentioned (Altoclient, VNP, VNEIC, S3C, Cloud Proxy). On the other hand, based on current DoW there shouldn't be new Features developed beyond M33 (i.e. this month) anyway. ? Integration 'packaging' and support activities to UCPs should continue (it is bound to the FI-PPP signed agreements), which includes documentation preparation, SW release, packaging of open source version of GEi, modifications required by UCPs (e.g. integration in cloud proxy of the IoT Protocol Adapter) Please take care of the most urgent actions defined above, and we'll discuss the others in the call on Thursday. BR Pier ------------------------------------------------------------------ Telecom Italia Pierangelo Garino Innovation - Research & Prototyping Via G. Reiss Romoli 274, I-10148 TORINO Tel: +39 011 228 7142 Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [cid:image001.gif at 01CF1B7C.D811E5E0]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 677 bytes Desc: image001.gif URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: I2ND_wiki_manuals_27-Jan-14.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 24191 bytes Desc: I2ND_wiki_manuals_27-Jan-14.xlsx URL: From pierangelo.garino at telecomitalia.it Tue Jan 28 11:28:55 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Tue, 28 Jan 2014 11:28:55 +0100 Subject: [Fiware-i2nd] I: [Fiware-wpl] Roadmap about to be delivered - incorporate any pending changes, please In-Reply-To: <52E77EE9.4030301@tid.es> References: <52E77EE9.4030301@tid.es> Message-ID: Dear GE Coords, Concerning the message by Miguel below, I introduced some changes to the technical Roadmap, which I want to check and agree with you before giving a final ok to the delivery. The most important action is that I removed from R3 table the Features which were declared for R3.3 and should not complete due to EC recommendation to stop some GEi implementations. As you know this concerns the SW functionalities which should stop, while all other actions (integration, manual completion, support to UCPs) can continue, and will be reflected in the backlog as WorkItem tickets. Although there is not yet a final decision on how to manage such Features, I believe that if we release a deliverable which includes these updates it surely doesn't go in contrast with the recommendation, and eventually we can reintroduce the Features later, if required. Can you confirm that the modification is agreed, and can you possibly check that the R3 text before the table doesn't require updates as well, to reflect that some Feature has now disappeared. Thanks and BR Pier Da: fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] Per conto di Miguel Carrillo Inviato: marted? 28 gennaio 2014 10:57 A: fiware-ge-owners at lists.fi-ware.eu Cc: fiware at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu Oggetto: [Fiware-wpl] Roadmap about to be delivered - incorporate any pending changes, please Dear all, As you may be aware, the latest issue of the roadmap reflected in the DoW is about to be delivered to the EC. This is basically the information under: * http://wiki.fi-ware.eu/FI-WARE_Technical_Roadmap Please make sure that the roadmap of your GEs is properly updated and avoid any ugly details (broken links, for instance). We will take a snapshot on Wednesday at 3pm and will deliver it to the EC. Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [rispetta l'ambiente]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: logo Ambiente_foglia2.jpg Type: image/jpeg Size: 677 bytes Desc: logo Ambiente_foglia2.jpg URL: From pierangelo.garino at telecomitalia.it Tue Jan 28 15:40:12 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Tue, 28 Jan 2014 15:40:12 +0100 Subject: [Fiware-i2nd] R: I: [Fiware-wpl] Roadmap about to be delivered - incorporate any pending changes, please In-Reply-To: References: <52E77EE9.4030301@tid.es> Message-ID: Dear All, I'm sorry I made a wrong assumption concerning the modifications concerning R3.3 for the stopped GEis. I have tried to re-establish the situation as it was before my modifications, except for those cases where there were heavy updates which introduced however soma additional point to be addressed (i.e. NetIC). So for GEis for which a stop is pending the rule is the following (see IoT roadmap page as comparison): - Features originally planned for Release 3.3 stay in the roadmap, *but* under the 'title' 'Release 3.X' - The following sentence is added: 'These features will be considered in coming releases but not in R3.3' Note that this applies to S3C, while for other GEis it shouldn't have specific impacts. I wait a feedback about NetIC by Thomas, we are already in contact through another thread of mails (I have added back the OFNIC features, if you don't see them try with a refresh of the page or by emptying the cache of the browser). Sorry again for the confusion. BR Pier Da: fiware-i2nd-bounces at lists.fi-ware.eu [mailto:fiware-i2nd-bounces at lists.fi-ware.eu] Per conto di Garino Pierangelo Inviato: marted? 28 gennaio 2014 11:29 A: Banniza, Thomas-Rolf (Thomas-Rolf); Woods, Chris; Heijnen Henk (henk.heijnen at technicolor.com); Hans Einsiedler Cc: fiware-i2nd at lists.fi-ware.eu Oggetto: [Fiware-i2nd] I: [Fiware-wpl] Roadmap about to be delivered - incorporate any pending changes, please Dear GE Coords, Concerning the message by Miguel below, I introduced some changes to the technical Roadmap, which I want to check and agree with you before giving a final ok to the delivery. The most important action is that I removed from R3 table the Features which were declared for R3.3 and should not complete due to EC recommendation to stop some GEi implementations. As you know this concerns the SW functionalities which should stop, while all other actions (integration, manual completion, support to UCPs) can continue, and will be reflected in the backlog as WorkItem tickets. Although there is not yet a final decision on how to manage such Features, I believe that if we release a deliverable which includes these updates it surely doesn't go in contrast with the recommendation, and eventually we can reintroduce the Features later, if required. Can you confirm that the modification is agreed, and can you possibly check that the R3 text before the table doesn't require updates as well, to reflect that some Feature has now disappeared. Thanks and BR Pier Da: fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] Per conto di Miguel Carrillo Inviato: marted? 28 gennaio 2014 10:57 A: fiware-ge-owners at lists.fi-ware.eu Cc: fiware at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu Oggetto: [Fiware-wpl] Roadmap about to be delivered - incorporate any pending changes, please Dear all, As you may be aware, the latest issue of the roadmap reflected in the DoW is about to be delivered to the EC. This is basically the information under: * http://wiki.fi-ware.eu/FI-WARE_Technical_Roadmap Please make sure that the roadmap of your GEs is properly updated and avoid any ugly details (broken links, for instance). We will take a snapshot on Wednesday at 3pm and will deliver it to the EC. Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [cid:image001.gif at 01CF1C3C.76D3A0F0]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 677 bytes Desc: image001.gif URL: From henk.heijnen at technicolor.com Tue Jan 28 16:41:46 2014 From: henk.heijnen at technicolor.com (Heijnen Henk) Date: Tue, 28 Jan 2014 15:41:46 +0000 Subject: [Fiware-i2nd] I: [Fiware-wpl] Roadmap about to be delivered - incorporate any pending changes, please In-Reply-To: References: <52E77EE9.4030301@tid.es> Message-ID: <36C739D8C5D8EB4C9CA1F132EB89BBD001C85C@MOPESMBX02.eu.thmulti.com> I've updated R3.3 and removed what I wrongly put in R2 I've added the stopped features in R3.x in the table I've removed some text saying that we will develop new features if asked by the use cases (we will not: we will only provide basic support). Technicolor will not participate to the project extension after M36 if our developments are really stopped (I've not put that in the wiki !) From: Garino Pierangelo [mailto:pierangelo.garino at telecomitalia.it] Sent: mardi 28 janvier 2014 15:40 To: Banniza, Thomas-Rolf (Thomas-Rolf); Woods, Chris; Heijnen Henk; Hans Einsiedler Cc: fiware-i2nd at lists.fi-ware.eu Subject: R: [Fiware-i2nd] I: [Fiware-wpl] Roadmap about to be delivered - incorporate any pending changes, please Dear All, I'm sorry I made a wrong assumption concerning the modifications concerning R3.3 for the stopped GEis. I have tried to re-establish the situation as it was before my modifications, except for those cases where there were heavy updates which introduced however soma additional point to be addressed (i.e. NetIC). So for GEis for which a stop is pending the rule is the following (see IoT roadmap page as comparison): - Features originally planned for Release 3.3 stay in the roadmap, *but* under the 'title' 'Release 3.X' - The following sentence is added: 'These features will be considered in coming releases but not in R3.3' Note that this applies to S3C, while for other GEis it shouldn't have specific impacts. I wait a feedback about NetIC by Thomas, we are already in contact through another thread of mails (I have added back the OFNIC features, if you don't see them try with a refresh of the page or by emptying the cache of the browser). Sorry again for the confusion. BR Pier Da: fiware-i2nd-bounces at lists.fi-ware.eu [mailto:fiware-i2nd-bounces at lists.fi-ware.eu] Per conto di Garino Pierangelo Inviato: marted? 28 gennaio 2014 11:29 A: Banniza, Thomas-Rolf (Thomas-Rolf); Woods, Chris; Heijnen Henk (henk.heijnen at technicolor.com); Hans Einsiedler Cc: fiware-i2nd at lists.fi-ware.eu Oggetto: [Fiware-i2nd] I: [Fiware-wpl] Roadmap about to be delivered - incorporate any pending changes, please Dear GE Coords, Concerning the message by Miguel below, I introduced some changes to the technical Roadmap, which I want to check and agree with you before giving a final ok to the delivery. The most important action is that I removed from R3 table the Features which were declared for R3.3 and should not complete due to EC recommendation to stop some GEi implementations. As you know this concerns the SW functionalities which should stop, while all other actions (integration, manual completion, support to UCPs) can continue, and will be reflected in the backlog as WorkItem tickets. Although there is not yet a final decision on how to manage such Features, I believe that if we release a deliverable which includes these updates it surely doesn't go in contrast with the recommendation, and eventually we can reintroduce the Features later, if required. Can you confirm that the modification is agreed, and can you possibly check that the R3 text before the table doesn't require updates as well, to reflect that some Feature has now disappeared. Thanks and BR Pier Da: fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] Per conto di Miguel Carrillo Inviato: marted? 28 gennaio 2014 10:57 A: fiware-ge-owners at lists.fi-ware.eu Cc: fiware at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu Oggetto: [Fiware-wpl] Roadmap about to be delivered - incorporate any pending changes, please Dear all, As you may be aware, the latest issue of the roadmap reflected in the DoW is about to be delivered to the EC. This is basically the information under: * http://wiki.fi-ware.eu/FI-WARE_Technical_Roadmap Please make sure that the roadmap of your GEs is properly updated and avoid any ugly details (broken links, for instance). We will take a snapshot on Wednesday at 3pm and will deliver it to the EC. Best regards, Miguel -- ---------------------------------------------------------------------- _/ _/_/ Miguel Carrillo Pacheco _/ _/ _/ _/ Telef?nica Distrito Telef?nica _/ _/_/_/ _/ _/ Investigaci?n y Edifico Oeste 1, Planta 9 _/ _/ _/ _/ Desarrollo Ronda de la Comunicaci?n S/N _/ _/_/ 28050 Madrid (Spain) Tel: (+34) 91 483 26 77 e-mail: mcp at tid.es Follow FI-WARE on the net Website: http://www.fi-ware.eu Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 Twitter: http://twitter.com/Fiware LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ---------------------------------------------------------------------- ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [rispetta l'ambiente]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 677 bytes Desc: image001.gif URL: From mev at tid.es Tue Jan 28 18:35:35 2014 From: mev at tid.es (MANUEL ESCRICHE VICENTE) Date: Tue, 28 Jan 2014 17:35:35 +0000 Subject: [Fiware-i2nd] Backlog - updated dashboards Message-ID: <65CDBE2E7E5A964BB8BC5F4328FDE90BA30130A0@EX10-MB2-MAD.hi.inet> Dear Partners, Get updated dashboards for I2ND chapter. Henk, please be aware that you have nothing scheduled at sprint level. If you were doing documentation, (any workitem), it would be wrong. Again, please, be aware that I won't allow cost to be charged when activity is not reflected in the tracker. [cid:image001.png at 01CF1C57.5DF937A0] Thanks for cooperation!! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 14223 bytes Desc: image001.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.i2nd.dashboard.20140128.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 278187 bytes Desc: FIWARE.backlog.i2nd.dashboard.20140128.xlsx URL: From henk.heijnen at technicolor.com Wed Jan 29 09:31:19 2014 From: henk.heijnen at technicolor.com (Heijnen Henk) Date: Wed, 29 Jan 2014 08:31:19 +0000 Subject: [Fiware-i2nd] Backlog - updated dashboards In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90BA30130A0@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90BA30130A0@EX10-MB2-MAD.hi.inet> Message-ID: <36C739D8C5D8EB4C9CA1F132EB89BBD001CC12@MOPESMBX02.eu.thmulti.com> Manuel, I don't understand: during the last weeks (after the review in December), we have stopped our developments as asked. We concentrated on unplanned and unexpected tasks: packaging our SW so we have a clear endpoint and closing our documentation / examples apps. So, of course, the tracker was not updated (ie: postponed features) Do you want an entry in the tracker saying we are working on packaging / closing / documenting ? Please remember that internally, as I already said, we are NOT using an agile methodology (no choice: I must follow the company's process) and that everything related to the tracker is just an extra bureaucratic effort we have accepted just to ease the global project management (I guess it is the same for many other partners). I will therefore: - Add entries in the tracker (on WP4 and WP7 sides) to describe the "packaging" effort - Ask for costs from the time between the Commission decision (end of Dec) and the end of Jan for "packaging / documenting / closing properly our SW devt" (no new feature = nothing in the tracker). - Ask for costs in both WP4 and in WP7 as we have been doing from the beginning of the project. I don't believe it is really the right time to change anything now that we are at 4 days of the end of our development phase !!! - Officially announce that we will not go for the project extension after M36 as initially planned Note that our SW will NOT be open source as it was announced because we had to stop our developments and we still have proprietary code inside (unexpected stop). All the expenses starting on 1st of Feb will be for support (of course, if the Commission decides the Cloud Edge is to be kept in the list of funded GEs, we can still change all that). I hope you will share our vision Regards Henk PS: don't hesitate to call !!! From: MANUEL ESCRICHE VICENTE [mailto:mev at tid.es] Sent: mardi 28 janvier 2014 18:36 To: fiware-i2nd at lists.fi-ware.eu Cc: Heijnen Henk Subject: Backlog - updated dashboards Dear Partners, Get updated dashboards for I2ND chapter. Henk, please be aware that you have nothing scheduled at sprint level. If you were doing documentation, (any workitem), it would be wrong. Again, please, be aware that I won't allow cost to be charged when activity is not reflected in the tracker. [cid:image001.png at 01CF1CD4.4272FBB0] Thanks for cooperation!! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 14223 bytes Desc: image001.png URL: From mev at tid.es Wed Jan 29 09:58:06 2014 From: mev at tid.es (MANUEL ESCRICHE VICENTE) Date: Wed, 29 Jan 2014 08:58:06 +0000 Subject: [Fiware-i2nd] Backlog - updated dashboards In-Reply-To: <36C739D8C5D8EB4C9CA1F132EB89BBD001CC12@MOPESMBX02.eu.thmulti.com> References: <65CDBE2E7E5A964BB8BC5F4328FDE90BA30130A0@EX10-MB2-MAD.hi.inet> <36C739D8C5D8EB4C9CA1F132EB89BBD001CC12@MOPESMBX02.eu.thmulti.com> Message-ID: <65CDBE2E7E5A964BB8BC5F4328FDE90BA301415B@EX10-MB2-MAD.hi.inet> Thanks Henk, I appreciate your email!! Yes, Work Items for Documentation, Packaging, etc are required since time ago, and it's been my request for many times during this month each week and more intensively during the last days because of the delivery. Please, bear in mind the tracker is not only for development (epics, features and user stories) it's also for bugs (support) and work items (documentation, etc). Please, observe the patterns in use we use: https://forge.fi-ware.eu/plugins/mediawiki/wiki/fi-ware-private/index.php/Backlog_items_patterns#Patterns_in_use You can consider my request as reporting (you don't need to associate it to AGILE) - I hope you're aware that delivery happens with the backlog snapshot to be taken on Friday. And please, observe your corresponding WP Leaders indications in each WP. When you have finished your activities please, drop me an email so that I can update the GEI status to closed. Please, give me your phone number, in case I see updates don't follow the rules. Thanks for cooperation!! Kind regards, Manuel From: Heijnen Henk [mailto:henk.heijnen at technicolor.com] Sent: mi?rcoles, 29 de enero de 2014 9:31 To: MANUEL ESCRICHE VICENTE Cc: Lionnais Morgane; Alex Glikson (GLIKSON at il.ibm.com); MIGUEL CARRILLO PACHECO; JUAN JOSE HIERRO SUREDA; fiware-i2nd at lists.fi-ware.eu Subject: RE: Backlog - updated dashboards Manuel, I don't understand: during the last weeks (after the review in December), we have stopped our developments as asked. We concentrated on unplanned and unexpected tasks: packaging our SW so we have a clear endpoint and closing our documentation / examples apps. So, of course, the tracker was not updated (ie: postponed features) Do you want an entry in the tracker saying we are working on packaging / closing / documenting ? Please remember that internally, as I already said, we are NOT using an agile methodology (no choice: I must follow the company's process) and that everything related to the tracker is just an extra bureaucratic effort we have accepted just to ease the global project management (I guess it is the same for many other partners). I will therefore: - Add entries in the tracker (on WP4 and WP7 sides) to describe the "packaging" effort - Ask for costs from the time between the Commission decision (end of Dec) and the end of Jan for "packaging / documenting / closing properly our SW devt" (no new feature = nothing in the tracker). - Ask for costs in both WP4 and in WP7 as we have been doing from the beginning of the project. I don't believe it is really the right time to change anything now that we are at 4 days of the end of our development phase !!! - Officially announce that we will not go for the project extension after M36 as initially planned Note that our SW will NOT be open source as it was announced because we had to stop our developments and we still have proprietary code inside (unexpected stop). All the expenses starting on 1st of Feb will be for support (of course, if the Commission decides the Cloud Edge is to be kept in the list of funded GEs, we can still change all that). I hope you will share our vision Regards Henk PS: don't hesitate to call !!! From: MANUEL ESCRICHE VICENTE [mailto:mev at tid.es] Sent: mardi 28 janvier 2014 18:36 To: fiware-i2nd at lists.fi-ware.eu Cc: Heijnen Henk Subject: Backlog - updated dashboards Dear Partners, Get updated dashboards for I2ND chapter. Henk, please be aware that you have nothing scheduled at sprint level. If you were doing documentation, (any workitem), it would be wrong. Again, please, be aware that I won't allow cost to be charged when activity is not reflected in the tracker. [cid:image001.png at 01CF1CD4.4272FBB0] Thanks for cooperation!! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 14223 bytes Desc: image001.png URL: From pierangelo.garino at telecomitalia.it Thu Jan 30 08:47:10 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Thu, 30 Jan 2014 08:47:10 +0100 Subject: [Fiware-i2nd] I2ND Periodic Conference - FI-WARE Message-ID: Dear All, I?m having troubles to make a long confcall (and also some of you told me they have same troubles), so I?d like to have the call anyway for approx. 30 (max 45) minutes, but focusing on the most important things which are: * Deliverables preparation: * Open Specs * Architecture * Tech Roadmap If you need to urgently discuss other topics in the call, please let me know in advance, thanks. Talk to you soon. BR Pier This is the new calendar reminder for the periodic I2ND call, occurring every two weeks. The following shared doc will be used to collect minutes: https://docs.google.com/document/d/1QYDZ6lHZIupu0scwqENuBTKQH5SLnXEQ8i7H5KRqG0k/edit Call details: PIN: 075102 Dial-in number: 1 415 363 0833, (International Dial-in Numbers +44 844 4 73 73 73 / +49 1803 001 178). Local numbers are available in the attached pdf. Instructions: 1. Dial the conference number at the time indicated above 2. Enter the PIN, when prompted 3. Speak your full name when prompted and then you will join the conference. If you are the first person to arrive on the conference call, you will hear music. As others arrive on the call you will hear them being announced. Find out how much easier your life could be with Powwownow's free conference calling service. Powwownow - get together whenever! http://www.powwownow.com Pier Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [rispetta l'ambiente]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 5000 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: USA_en_pwn-dial-in-numbers.pdf Type: application/pdf Size: 61516 bytes Desc: USA_en_pwn-dial-in-numbers.pdf URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: logo Ambiente_foglia2.jpg Type: image/jpeg Size: 677 bytes Desc: logo Ambiente_foglia2.jpg URL: From pierangelo.garino at telecomitalia.it Thu Jan 30 16:34:54 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Thu, 30 Jan 2014 16:34:54 +0100 Subject: [Fiware-i2nd] Open Specs and API pages copied to the fi-ware-private wiki Message-ID: Dear All, as defined in the PhC today, all the i2nd Open Specs and API pages are now available on the fi-ware-private wiki: Page of Open Specs: Interface to Networks and Devices (I2ND) Open Specs Page of Open Specs API: Interface to Networks and Devices (I2ND) Open Specs APIs You can go to the link 'What links here' of the toolbox on the left side of the page, to clearly understand where are these pages located in the wiki (although all of you should know how to find them starting from the main fi-ware-private wiki page). A few important notes: - I changed several page names, to: o make them standard o remove the (PRELIMINARY) or (DRAFT) name in the title ? AP: Please tell me if, for whatever reasons, a page should still be under such incomplete conditions, and these should be clearly motivated (then explained in the page) - You should check that the pages are those up to date (I might have done mistakes when doing the porting) - You should carefully check that the figures are correct (we experienced some trouble with porting process in the past) - AP: report to Pier that everything is fine when done all checks Many thanks and BR Pier ------------------------------------------------------------------ Telecom Italia Pierangelo Garino Innovation - Research & Prototyping Via G. Reiss Romoli 274, I-10148 TORINO Tel: +39 011 228 7142 Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [rispetta l'ambiente]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: logo Ambiente_foglia2.jpg Type: image/jpeg Size: 677 bytes Desc: logo Ambiente_foglia2.jpg URL: From pierangelo.garino at telecomitalia.it Fri Jan 31 16:29:03 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Fri, 31 Jan 2014 16:29:03 +0100 Subject: [Fiware-i2nd] I: [Fiware-wpl] Reviews of R3 Architecture In-Reply-To: <52EA9D8F.2030900@tid.es> References: <52EA9D02.8010803@tid.es> <52EA9D8F.2030900@tid.es> Message-ID: Dear All, as announced in the I2ND PhC on Thursday, we have to perform a peer review of the Architecture deliverable drafts, and we have been assigned the review of IoT chapter architecture. The mail below by Miguel explains where finding the file to download, how to do the review, how uploading a revised doc on the Forge site (Private project) and publish the link in the created cockpit, and most importantly When, i.e. by Monday (Feb 3rd). There is however an issue: the IoT document is not ready yet, so we need to wait until we receive the right link. I'm in contact with the IoT WPL to understand when the file is available. Here I start proposing an assignment of reviewers to every GE/GEi of IoT, please let me know immediately, in case you really cannot do it by the given deadline: GE GEi Owner Backend IoT Broker Pier Backend Configuration Manager Orion Context Broker Roman Backend Device Manager IDAS Thomas Gateway Device Manager Marius Gateway Protocol Adapter ZPA Henk Gateway Protocol Adapter EPCGE Chris Gateway Protocol Adapter COAP Jozsef Gateway Data Handling Esper4FastData Gianmario Gateway Data Handling Sol/CEP Letterio Gateway Security Matthias So please start having a look at the proposed assignments, I'll inform you as soon as the IoT doc is ready for download. BR Pier Da: fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] Per conto di Miguel Carrillo Inviato: gioved? 30 gennaio 2014 19:45 A: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Oggetto: Re: [Fiware-wpl] Reviews of R3 Architecture Dear all, I resend my previous message, I do not know why the embedded figure got swapped with a wrong one. Let us hope that it works now. BR Miguel ====================================== Dear all, Despite the failure to deliver in part of the chapters, I do not think we should wait any longer for those who are already there. Manuel and I have prepared the cockpit and the procedure. Usual one with a single round of reviews. Each WPL has to distribute work in his WP and make sure that everyone knows the schedule: * 03/Feb/2014 - Comments on first draft (.docx with traced changes). Each person has 2 days to do this. It is feasible if there is actual will of doing it * In the case of those who do not have their inputs ready, the case is different. We'll see what to do with them. * Use the cockpit and the right folder on docman: * https://docs.google.com/spreadsheet/ccc?key=0AnxxmzdEZ1WtdDF0UDNfUjZ0R01wWHFtczNUMi1weGc&usp=sharing#gid=0 * The assignment of reviewers is in the tab "Assignments" * The GEi list may have small discrepancies (mistakes in the GEi list). Let us know if we need to change something. * URGENT: Will the WPL/WPLA please take a look at the list of their WPs and see if there are missing GE/GEi rows in the cockpit? * The folder to upload contributions is on the private project of the forge, here: [cid:part2.09000000.03060905 at tid.es] Best regards, Miguel ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [rispetta l'ambiente]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: hhfhggeg.png Type: image/png Size: 8979 bytes Desc: hhfhggeg.png URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: logo Ambiente_foglia2.jpg Type: image/jpeg Size: 677 bytes Desc: logo Ambiente_foglia2.jpg URL: From pierangelo.garino at telecomitalia.it Fri Jan 31 16:30:26 2014 From: pierangelo.garino at telecomitalia.it (Garino Pierangelo) Date: Fri, 31 Jan 2014 16:30:26 +0100 Subject: [Fiware-i2nd] I: Backlog Dashboard - SPRINT CLOSING - LAST CALL In-Reply-To: <65CDBE2E7E5A964BB8BC5F4328FDE90BA3015CF4@EX10-MB2-MAD.hi.inet> References: <65CDBE2E7E5A964BB8BC5F4328FDE90BA3015CF4@EX10-MB2-MAD.hi.inet> Message-ID: Hi again, I forward this message, in case some of you dind't receive it through the other lists. Please take care of updating your tickets, in order to have the situation reflected correctly in the snapshot taken by Manuel late this afternoon. BR Pier Da: fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] Per conto di MANUEL ESCRICHE VICENTE Inviato: venerd? 31 gennaio 2014 10:59 A: fiware-ge-owners at lists.fi-ware.eu Cc: fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Oggetto: [Fiware-wpl] Backlog Dashboard - SPRINT CLOSING - LAST CALL Dear GE Owners: Please be aware today is deadline to close sprint 3.3.1. I'd appreciate you proceed to close in the tracker all entries finished during M33 (=Sprint 3.3.1) Let me remind you I'm delivering on Monday morning the backlog snapshot taken today at 18:00. Current status: Apps: [cid:image001.png at 01CF1E72.A6AE9CC0] Cloud: [cid:image002.png at 01CF1E72.A6AE9CC0] IoT: [cid:image003.png at 01CF1E73.57909840] Data: [cid:image004.png at 01CF1E73.57909840] I2ND: [cid:image005.png at 01CF1E73.57909840] Security: [cid:image006.png at 01CF1E73.57909840] MiWi: [cid:image007.png at 01CF1E73.57909840] Thanks for cooperation!! Have a nice weekend!! Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx Questo messaggio e i suoi allegati sono indirizzati esclusivamente alle persone indicate. La diffusione, copia o qualsiasi altra azione derivante dalla conoscenza di queste informazioni sono rigorosamente vietate. Qualora abbiate ricevuto questo documento per errore siete cortesemente pregati di darne immediata comunicazione al mittente e di provvedere alla sua distruzione, Grazie. This e-mail and any attachments is confidential and may contain privileged information intended for the addressee(s) only. Dissemination, copying, printing or use by anybody else is unauthorised. If you are not the intended recipient, please delete this message and any attachments and advise the sender by return e-mail, Thanks. [rispetta l'ambiente]Rispetta l'ambiente. Non stampare questa mail se non ? necessario. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 13333 bytes Desc: image001.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image002.png Type: image/png Size: 13676 bytes Desc: image002.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image003.png Type: image/png Size: 13501 bytes Desc: image003.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image004.png Type: image/png Size: 13966 bytes Desc: image004.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image005.png Type: image/png Size: 13749 bytes Desc: image005.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image006.png Type: image/png Size: 13118 bytes Desc: image006.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image007.png Type: image/png Size: 13452 bytes Desc: image007.png URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.iot.dashboard.20140131.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 387275 bytes Desc: FIWARE.backlog.iot.dashboard.20140131.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.miwi.dashboard.20140131.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 377575 bytes Desc: FIWARE.backlog.miwi.dashboard.20140131.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.i2nd.dashboard.20140131.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 279211 bytes Desc: FIWARE.backlog.i2nd.dashboard.20140131.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.cloud.dashboard.20140131.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 379716 bytes Desc: FIWARE.backlog.cloud.dashboard.20140131.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.data.dashboard.20140131.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 406303 bytes Desc: FIWARE.backlog.data.dashboard.20140131.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.apps.dashboard.20140131.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 397448 bytes Desc: FIWARE.backlog.apps.dashboard.20140131.xlsx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: FIWARE.backlog.security.dashboard.20140131.xlsx Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet Size: 523649 bytes Desc: FIWARE.backlog.security.dashboard.20140131.xlsx URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: logo Ambiente_foglia2.jpg Type: image/jpeg Size: 677 bytes Desc: logo Ambiente_foglia2.jpg URL: