From pascal.bisson at thalesgroup.com Tue Sep 3 09:34:11 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Tue, 3 Sep 2013 09:34:11 +0200 Subject: [Fiware-security] TR: Sprint transition - from S3.1.2 to S3.1.3 Message-ID: <13764_1378193653_522590F5_13764_418_1_1586fbf2-0297-49b7-b406-c42d2fb7d834@THSONEA01HUB02P.one.grp> FYI and update for the tracker forwhat concerns Sprint Change and corrections. And Yes congratulations to ATOS Colleagues who did perfom all this already as checked and reported in Manuel's email below. So counting on others to perform the same. Regrds, Pascal De : fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] De la part de MANUEL ESCRICHE VICENTE Envoy? : lundi 2 septembre 2013 18:09 ? : fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Objet : [Fiware-wpl] Sprint transition - from S3.1.2 to S3.1.3 Dear Partners, Let me remind you that we have finished sprint S3.1.2-M28 and have started S3.1.3-M29 http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Releases_and_Sprints_numbering,_with_mapping_to_calendar_dates Please, update your GE backlog accordingly: * Close the backlog items finished during M28. * Update on-going items not finished yet to belong to S3.1.3 This task shouldn't take you more than 5 minutes!! Find below the links to the backlog reports, there you'll find tabs for each GE. By clicking on the ticket number you can easily access each item on the tracker and update its status and sprint. WP3: https://forge.fi-ware.eu/docman/view.php/27/2791/FIWARE.backlog.apps.report.20130831-1531.xlsx WP4: https://forge.fi-ware.eu/docman/view.php/27/2792/FIWARE.backlog.cloud.report.20130831-1531.xlsx WP5: https://forge.fi-ware.eu/docman/view.php/27/2795/FIWARE.backlog.iot.report.20130831-1532.xlsx WP6: https://forge.fi-ware.eu/docman/view.php/27/2793/FIWARE.backlog.data.report.20130831-1531.xlsx WP7: https://forge.fi-ware.eu/docman/view.php/27/2794/FIWARE.backlog.i2nd.report.20130831-1532.xlsx WP8: https://forge.fi-ware.eu/docman/view.php/27/2796/FIWARE.backlog.security.report.20130831-1532.xlsx Once the previous task is over, you've got this week to plan and schedule tasks for your GE and update your GE tracker. You can use the previous spreadsheet for items already declared, it's all about changing status and sprints. Changing these items on the tracker shouldn't take you more than 5 minutes. Next week I'll meet WP Leaders in order to review all GE's backlog. I expect your contribution to have all of them reflecting your activities. I'll be also available to meet GE owners if needed and requested. Congratulations to Susana Gonzalez-Zarzosa and Antonio Garc?a who have their GE Context-based Security & Compliance in the security chapter in perfect shape: already closed the sprint and already scheduled next sprint!!! Thanks all for cooperation!! If anything, don't hesitate to let me know. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From Adrian.Waller at uk.thalesgroup.com Tue Sep 3 13:07:51 2013 From: Adrian.Waller at uk.thalesgroup.com (WALLER Adrian) Date: Tue, 3 Sep 2013 12:07:51 +0100 Subject: [Fiware-security] [FIWARE-Security] Journal of Information Security and Applications - Special Issue on Identity Management and Protection References: <26125_1355397494_50C9B975_26125_5782_1_CBBCD6C304123F4AB23FAAE3055C8C0E0206DE1DE637@THSONEA01CMS04P.one.grp> Message-ID: <7C80A1EAA66A4F45BA3A574774382B9BA999480A7C@THSONEP02CMB01P.one-02-priv.grp> Dear all, I am editing a Special Issue of the Elsevier JISA journal on Identity Protection and Management. This could be appropriate for some of the work you have done in FI-WARE (or elsewhere) on IdM, so please consider submitting something. The Call for Papers is below and more information can be found at http://www.journals.elsevier.com/journal-of-information-security-and-applications/call-for-papers/special-issue-on-identity-protection-and-management/. Deadline for submission is September 30th. Regards, Adrian Special Issue on Identity Protection and Management Motivation The increasing move to online business and e-government requires management of various aspects of peoples' identities on information systems. Usernames, passwords, personal profiles, social security numbers, patient identifiers, e-mail addresses, credit card numbers, etc. are used to uniquely identify individuals. Many of these identifiers are highly mobile, and spread into many information systems and purposes. As a result, individuals increasingly leave trails of personal data when using the Internet, which allow them to be profiled and which persist for long periods of time. At the same time, trends such as Cloud Computing make it increasingly difficult for both information managers and individuals to control and manage this personal information. To make systems more usable for both individuals and information managers, Identity Management systems are needed that are interoperable and can be reused in multiple systems. In addition, as a result of increasing cyber fraud and cyber terrorism, the demand for better technical methods of identification is growing, not only in companies and organisations but also in the world at large. This special issue on Identity Protection and Management is intended to bring forth the recent advancements in this area. Original and unpublished contributions covering, but not limited to, the following and related issues concerning Identity Management and Privacy are solicited. Extended editions of published conference papers are also welcome. * New Identity Management technologies and approaches * Interoperable Identity Management solutions * Privacy-Enhancing Technologies (PETs) * Identity Management solutions for e-Government * Identity Protection and Management in and for Cloud Computing * Privacy and Identity Management in social networks * Risk analysis techniques for privacy risk and privacy impact assessment * Identity theft prevention * User-centric and usable Identity Management * Legal, social, economic, philosophical and ethical aspects * Attacks on Identity Management systems * Methods of identification and authentication * Anonymity, pseudonymity, unlinkability and unobservability mechanisms * Surveillance, monitoring and profiling methods * Federated Identity Management * Tracing, monitoring and forensics * Privacy and anonymity in the Web Important Dates * Paper submission: September 30, 2013 * First-round acceptance notification: November 29, 2013 * Revision: December 20, 2013 * Final decision: January 31, 2014 * Submission of final paper: February 14, 2014 * Publication date: March 31, 2014 Submission Details Paper submissions for the special issue should follow the submission format and guidelines for regular Elsevier Information Security Technical Report (ISTR) papers. Author guidelines can be found at http://www.elsevier.com/wps/find/journaldescription.cws_home/31185/authorinstructions. All the papers will be peer-reviewed following the ISTR reviewing procedures. Guest editors will make an initial determination of the suitability and scope of all submissions. Papers that either lack originality, clarity in presentation or fall outside the scope of the special issue will not be sent for review and the authors will be promptly informed in such cases. Guest Editors Dr Adrian Waller Thales UK Research and Technology, Worton Drive, Reading RG2 0SB United Kingdom Phone: +44 (0) 118 9868601 Email: adrian.waller at uk.thalesgroup.com Dr Gregorio Martinez University of Murcia Facultad de Informatica Campus de Espinardo, s/n 30.100 Murcia Spain Phone: +34 868 887646 Email: gregorio at um.es Dr Felix Gomez Marmol NEC Laboratories Europe Kurfuersten-Anlage, 36 69115, Heidelberg Germany Phone: +49 6221 4342 124 Email: felix.gomez-marmol at neclab.eu Short Biographies of Guest Editors: Dr Adrian Waller Dr Adrian Waller is a Chief Technical Consultant in Information Security at Thales UK Research and Technology, responsible for providing consultancy and research expertise on a wide variety of security projects. His research interests include most areas of information and cyber security, but particularly data protection, security architectures, cryptography, network security, access control and identity management. Dr Gregorio Martinez Dr Gregorio Martinez is associate professor in the Department of Information and Communications Engineering of the University of Murcia. His research interests include security and management of networks and services as well as advanced computational models and paradigms. Dr Felix Gomez Marmol Dr Felix Gomez Marmol is a senior researcher in the security group at NEC Laboratories Europe, Heidelberg, Germany. His research interests include authorisation, authentication and trust management in distributed and heterogeneous systems, security management in mobile devices and design and implementation of security solutions for mobile and heterogeneous environments. -------------- next part -------------- An HTML attachment was scrubbed... URL: From pascal.bisson at thalesgroup.com Wed Sep 4 10:55:17 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Wed, 4 Sep 2013 10:55:17 +0200 Subject: [Fiware-security] TR: [Fiware-wpl] New templates for FI-WARE presentation Message-ID: <1028_1378284923_5226F57B_1028_2561_1_CBBCD6C304123F4AB23FAAE3055C8C0E02081A76A129@THSONEA01CMS04P.one.grp> FYI De : fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] De la part de Juanjo Hierro Envoy? : mardi 3 septembre 2013 20:40 ? : fiware at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Objet : [Fiware-wpl] New templates for FI-WARE presentation Dear partners, Please find the links from which you may download the templates for FI-WARE presentations to be used from now on. They are adapted to the new branding design by Ogilvy. One of them is adapted to 16:9 screens (we have to create it for our presentations at Campus Party) * https://forge.fi-ware.eu/docman/view.php/7/1056/FI-WARE+presentation+template+13-08-30.pptx * https://forge.fi-ware.eu/docman/view.php/7/1057/FI-WARE+presentation+template+16x9+13-08-30.pptx Best regards, -- Juanjo ------------- Product Development and Innovation (PDI) - Telefonica Digital website: www.tid.es email: jhierro at tid.es twitter: twitter.com/JuanjoHierro FI-WARE (European Future Internet Core Platform) Coordinator and Chief Architect FI-PPP Architecture Board chairman You can follow FI-WARE at: website: http://www.fi-ware.eu facebook: http://www.facebook.com/pages/FI-WARE/251366491587242 twitter: http://twitter.com/FIware linkedIn: http://www.linkedin.com/groups/FIWARE-4239932 ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From pascal.bisson at thalesgroup.com Thu Sep 5 12:31:13 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Thu, 5 Sep 2013 12:31:13 +0200 Subject: [Fiware-security] Fi-WARE Security - WP8 audio of September 6th will start at 11am Message-ID: <28654_1378377076_52285D73_28654_17619_1_CBBCD6C304123F4AB23FAAE3055C8C0E02081A7F7B68@THSONEA01CMS04P.one.grp> Dear All, Due to another audio I have now at 10am let me inform you that our audio conference of tomorrow on FI-WARE Security Chapter will start at 11am and not 10am as planned. Apologize for the inconvenience. Best Regards, Pascal -------------- next part -------------- An HTML attachment was scrubbed... URL: From xavier.aghina at orange.com Fri Sep 6 08:55:35 2013 From: xavier.aghina at orange.com (xavier.aghina at orange.com) Date: Fri, 6 Sep 2013 06:55:35 +0000 Subject: [Fiware-security] Fi-WARE Security - WP8 audio of September 6th will start at 11am In-Reply-To: <28654_1378377076_52285D73_28654_17619_1_CBBCD6C304123F4AB23FAAE3055C8C0E02081A7F7B68@THSONEA01CMS04P.one.grp> References: <28654_1378377076_52285D73_28654_17619_1_CBBCD6C304123F4AB23FAAE3055C8C0E02081A7F7B68@THSONEA01CMS04P.one.grp> Message-ID: <10646_1378450536_52297C68_10646_16670_1_81FF741594681345A3FBB024B01054B906FC3A6C@PEXCVZYM11.corporate.adroot.infra.ftgroup> Hello, I have another commitment in this time slot :( , good audio you, next week. Xavier De : fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] De la part de BISSON Pascal Envoy? : jeudi 5 septembre 2013 12:31 ? : fiware-security at lists.fi-ware.eu Objet : [Fiware-security] Fi-WARE Security - WP8 audio of September 6th will start at 11am Importance : Haute Dear All, Due to another audio I have now at 10am let me inform you that our audio conference of tomorrow on FI-WARE Security Chapter will start at 11am and not 10am as planned. Apologize for the inconvenience. Best Regards, Pascal _________________________________________________________________________________________________________________________ Ce message et ses pieces jointes peuvent contenir des informations confidentielles ou privilegiees et ne doivent donc pas etre diffuses, exploites ou copies sans autorisation. Si vous avez recu ce message par erreur, veuillez le signaler a l'expediteur et le detruire ainsi que les pieces jointes. Les messages electroniques etant susceptibles d'alteration, Orange decline toute responsabilite si ce message a ete altere, deforme ou falsifie. Merci. This message and its attachments may contain confidential or privileged information that may be protected by law; they should not be distributed, used or copied without authorisation. If you have received this email in error, please notify the sender and delete this message and its attachments. As emails may be altered, Orange is not liable for messages that have been modified, changed or falsified. Thank you. -------------- next part -------------- An HTML attachment was scrubbed... URL: From FRP at zurich.ibm.com Fri Sep 6 11:52:10 2013 From: FRP at zurich.ibm.com (Franz-Stefan Preiss) Date: Fri, 6 Sep 2013 11:52:10 +0200 Subject: [Fiware-security] Fw: [Fiware-cp-workshops] Published workshop 1 final slides Message-ID: Dear Pascal, Dear All, these are the links that I'm aware of concerning the campus party. Best Regards, Franz-Stefan ----- Forwarded by Franz-Stefan Preiss/Zurich/IBM on 09/06/2013 11:50 AM ----- From: Ferm?n Gal?n M?rquez To: Miguel Jimenez , CARLOS RALLI UCENDO Cc: fiware-cp-workshops at lists.fi-ware.eu Date: 09/04/2013 05:43 PM Subject: [Fiware-cp-workshops] Published workshop 1 final slides Sent by: fiware-cp-workshops-bounces at lists.fi-ware.eu Hi, I have integrated the 3 slide decks into one (in addition, I have change the template to use the one that Juanjo sent recently) and published it at SlideShare: http://www.slideshare.net/fermingalan/developing-your-first-application-using-fi-ware-20130903 I have updated the workshop 1 homepage to include the new link: http://www.fi-ware.eu/campus-party-europedeveloping-your-first-application-workshop/ In addition, I have removed the old PDF presentation drafts in the Dropbox folder, replacing them with a PDF of the integrated presentation. Best regards, ------ Ferm?n ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-cp-workshops mailing list Fiware-cp-workshops at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-cp-workshops -------------- next part -------------- An HTML attachment was scrubbed... URL: From susana.gzarzosa at atosresearch.eu Fri Sep 6 11:55:26 2013 From: susana.gzarzosa at atosresearch.eu (Susana Gonzalez Zarzosa) Date: Fri, 6 Sep 2013 11:55:26 +0200 Subject: [Fiware-security] Fw: [Fiware-cp-workshops] Published workshop 1 final slides In-Reply-To: References: Message-ID: Dear all, You can also find the CP workshops documentation in the following links: http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Workshop_1:_Developing_your_first_application http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Workshop_2:_Developing_and_publishing_applications_on_the_FI-WARE_Cloud_%E2%80%93_a_next_level_of_OpenStack http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Workshop_3:_Powerful_web_3D,_AR_and_media_processing_features Regards, Susana From: fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] On Behalf Of Franz-Stefan Preiss Sent: viernes, 06 de septiembre de 2013 11:52 To: fiware-security at lists.fi-ware.eu Subject: [Fiware-security] Fw: [Fiware-cp-workshops] Published workshop 1 final slides Dear Pascal, Dear All, these are the links that I'm aware of concerning the campus party. Best Regards, Franz-Stefan ----- Forwarded by Franz-Stefan Preiss/Zurich/IBM on 09/06/2013 11:50 AM ----- From: Ferm?n Gal?n M?rquez To: Miguel Jimenez , CARLOS RALLI UCENDO Cc: fiware-cp-workshops at lists.fi-ware.eu Date: 09/04/2013 05:43 PM Subject: [Fiware-cp-workshops] Published workshop 1 final slides Sent by: fiware-cp-workshops-bounces at lists.fi-ware.eu ________________________________ Hi, I have integrated the 3 slide decks into one (in addition, I have change the template to use the one that Juanjo sent recently) and published it at SlideShare: http://www.slideshare.net/fermingalan/developing-your-first-application-using-fi-ware-20130903 I have updated the workshop 1 homepage to include the new link: http://www.fi-ware.eu/campus-party-europedeveloping-your-first-application-workshop/ In addition, I have removed the old PDF presentation drafts in the Dropbox folder, replacing them with a PDF of the integrated presentation. Best regards, ------ Ferm?n ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx _______________________________________________ Fiware-cp-workshops mailing list Fiware-cp-workshops at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-cp-workshops ------------------------------------------------------------------ This e-mail and the documents attached are confidential and intended solely for the addressee; it may also be privileged. If you receive this e-mail in error, please notify the sender immediately and destroy it. As its integrity cannot be secured on the Internet, the Atos group liability cannot be triggered for the message content. Although the sender endeavours to maintain a computer virus-free network, the sender does not warrant that this transmission is virus-free and will not be liable for any damages resulting from any virus transmitted. Este mensaje y los ficheros adjuntos pueden contener informacion confidencial destinada solamente a la(s) persona(s) mencionadas anteriormente pueden estar protegidos por secreto profesional. Si usted recibe este correo electronico por error, gracias por informar inmediatamente al remitente y destruir el mensaje. Al no estar asegurada la integridad de este mensaje sobre la red, Atos no se hace responsable por su contenido. Su contenido no constituye ningun compromiso para el grupo Atos, salvo ratificacion escrita por ambas partes. Aunque se esfuerza al maximo por mantener su red libre de virus, el emisor no puede garantizar nada al respecto y no sera responsable de cualesquiera danos que puedan resultar de una transmision de virus. ------------------------------------------------------------------ -------------- next part -------------- An HTML attachment was scrubbed... URL: From pascal.bisson at thalesgroup.com Thu Sep 12 10:12:10 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Thu, 12 Sep 2013 10:12:10 +0200 Subject: [Fiware-security] =?utf-8?q?Annul=C3=A9=3A_FI-WARE_WP8_Weekly_aud?= =?utf-8?q?io_conf?= Message-ID: <29608_1378973531_5231775B_29608_5464_1_CBBCD6C304123F4AB23FAAE3055C8C0E02081A9B1425@THSONEA01CMS04P.one.grp> Quand : vendredi 13 septembre 2013 10:00-12:00 (GMT+01:00) Bruxelles, Copenhague, Madrid, Paris. Emplacement : Meeting Room Number: 391581 Remarque : le d?calage GMT ci-dessus ne tient pas compte des r?glages de l'heure d'?t?. *~*~*~*~*~*~*~*~*~* Liste des num?ros LocalConnect: Australia Australia Toll Free 1800 005 574 Australia Sydney +61 (0) 282 239 767 Austria Vienna +43 (0) 2682 205 6609 Belgium Brussels +32 (0) 2 789 8678 Denmark Copenhagen +45 3271 4340 Finland Helsinki +358 (0) 923 142 830 France Lyon +33 (0) 426 840 285 France Marseille +33 (0) 488 915 385 France Paris +33 (0) 170 994 816 Germany Berlin +49 (0) 3072 616 7342 Germany D?sseldorf +49 (0) 2115 407 3902 Germany Frankfurt +49 (0) 6971 044 5635 Germany Hamburg +49 (0) 4080 902 0684 Germany Munich +49 (0) 8924 443 2893 Germany Stuttgart +49 (0) 7111 856 2130 Greece Greece Toll Free 0080 012 6344 Hong Kong Hong Kong +852 301 145 59 Hungary Budapest +36 (06) 1-889-3286 Ireland Dublin +353 (0) 14 860 780 Israel Israel Toll Free 1809 245 981 Italy Milan +39 0 230 413 017 Italy Rome +39 0 645 217 056 Italy Turin +39 0 112 179 2159 Japan Japan Toll Free 005 311 212 65 Japan Tokyo +81 (0) 357 675 025 Korea, Republic Of Seoul +82 (0) 234 831 224 Luxembourg Luxemburg City +352 2700 41 42 Malaysia Kuala Lumpur +60 (0) 377 124 640 Netherlands Amsterdam +31 (0) 207 948 529 New Zealand Auckland +64 (0) 9 919 2428 Norway Oslo +47 2153 3919 Poland Poland Toll Free 0080 0121 1304 Portugal Portugal Toll Free 800 814 183 Russia Russia Toll Free 81080 02209 4011 Singapore Singapore +65 6622 1068 Spain Barcelona +34 93 492 3235 Spain Madrid +34 91 788 9908 Sweden Stockholm +46 (0) 850 520 145 Switzerland Geneva +41 (0) 225 927 428 United Kingdom Birmingham +44 (0) 121 260 4686 United Kingdom London +44 (0) 207 153 9902 United Kingdom Manchester +44 (0) 161 250 0679 United States USA & Canada Toll Free 1888 249 0050 United States USA Toll +1 954 334 1559 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 4367 bytes Desc: not available URL: From pascal.bisson at thalesgroup.com Thu Sep 12 10:16:04 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Thu, 12 Sep 2013 10:16:04 +0200 Subject: [Fiware-security] FI-WARE - Security -Audio conf of this Friday cancelled Message-ID: <21557_1378973766_52317846_21557_918_1_CBBCD6C304123F4AB23FAAE3055C8C0E02081A9B1455@THSONEA01CMS04P.one.grp> Dear All, This email to let you know that Audio conference of this Friday has just been cancelled. Please use that time to work on actions items and make your duties. Thanks in advance. Regards, Pascal -------------- next part -------------- An HTML attachment was scrubbed... URL: From pascal.bisson at thalesgroup.com Wed Sep 18 10:40:15 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Wed, 18 Sep 2013 10:40:15 +0200 Subject: [Fiware-security] TR: [Fiware-wpl] IMPORTANT: eLearning courses Message-ID: <9585_1379493611_523966EB_9585_1078_4_CBBCD6C304123F4AB23FAAE3055C8C0E02081AB482C5@THSONEA01CMS04P.one.grp> FYI Also to be discussed at our next audio-conf. Regards, Pascal De : fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] De la part de Davide Dalle Carbonare Envoy? : mardi 17 septembre 2013 18:06 ? : fiware at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Objet : [Fiware-wpl] IMPORTANT: eLearning courses Dear Partners, this is a reminder for you to create training courses to publish in the eLearning platform. The priority is for those GEis already available in FI-LAB. It is expected to have their courses published by the end of September. The manual is on the public wiki: https://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/How_to_create_a_SCORM_course (FAQ section will evolve accordingly to your request of support) Kind Regards, Davide -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From slim.trabelsi at sap.com Wed Sep 18 10:45:29 2013 From: slim.trabelsi at sap.com (TRABELSI, Slim) Date: Wed, 18 Sep 2013 08:45:29 +0000 Subject: [Fiware-security] [Fiware-wpl] IMPORTANT: eLearning courses In-Reply-To: <9585_1379493611_523966EB_9585_1078_4_CBBCD6C304123F4AB23FAAE3055C8C0E02081AB482C5@THSONEA01CMS04P.one.grp> References: <9585_1379493611_523966EB_9585_1078_4_CBBCD6C304123F4AB23FAAE3055C8C0E02081AB482C5@THSONEA01CMS04P.one.grp> Message-ID: <31F2B8F7A6BAD749A28AE406B8EF25096A321544@DEWDFEMB19A.global.corp.sap> Hi Pascal, I thought that eLearnings were optional, but it seems that now it became mandatory ? Best slim From: fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] On Behalf Of BISSON Pascal Sent: mercredi 18 septembre 2013 10:40 To: fiware-security at lists.fi-ware.eu Subject: [Fiware-security] TR: [Fiware-wpl] IMPORTANT: eLearning courses FYI Also to be discussed at our next audio-conf. Regards, Pascal De : fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] De la part de Davide Dalle Carbonare Envoy? : mardi 17 septembre 2013 18:06 ? : fiware at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Objet : [Fiware-wpl] IMPORTANT: eLearning courses Dear Partners, this is a reminder for you to create training courses to publish in the eLearning platform. The priority is for those GEis already available in FI-LAB. It is expected to have their courses published by the end of September. The manual is on the public wiki: https://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/How_to_create_a_SCORM_course (FAQ section will evolve accordingly to your request of support) Kind Regards, Davide -------------- next part -------------- An HTML attachment was scrubbed... URL: From pascal.bisson at thalesgroup.com Wed Sep 18 10:52:24 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Wed, 18 Sep 2013 10:52:24 +0200 Subject: [Fiware-security] [Fiware-wpl] IMPORTANT: eLearning courses In-Reply-To: <31F2B8F7A6BAD749A28AE406B8EF25096A321544@DEWDFEMB19A.global.corp.sap> References: <9585_1379493611_523966EB_9585_1078_4_CBBCD6C304123F4AB23FAAE3055C8C0E02081AB482C5@THSONEA01CMS04P.one.grp> <31F2B8F7A6BAD749A28AE406B8EF25096A321544@DEWDFEMB19A.global.corp.sap> Message-ID: <9591_1379494345_523969C9_9591_15970_1_98d7844b-4e22-4181-a33e-17eb3845953a@THSONEA01HUB06P.one.grp> For me it comes from the way it has now been presented by Davide in his email. This is something I will try to get clarified. In the meantime feel free to also ask Davide for clarification from his side. For me this remains something highly appreciated and so that we can encourage but in the meantime compatible with effort we have to or can devote. Please notice this priority for GE already available in FI-LAB ... As you know only a few have been made so far available and at last WPL/WPA audio conf it was asked to Juanjo to define process and rules that apply for a GE to get published there ... This should come in the coming days I hope ... Best Regards, Pascal De : TRABELSI, Slim [mailto:slim.trabelsi at sap.com] Envoy? : mercredi 18 septembre 2013 10:45 ? : BISSON Pascal; fiware-security at lists.fi-ware.eu Objet : RE: [Fiware-wpl] IMPORTANT: eLearning courses Hi Pascal, I thought that eLearnings were optional, but it seems that now it became mandatory ? Best slim From: fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] On Behalf Of BISSON Pascal Sent: mercredi 18 septembre 2013 10:40 To: fiware-security at lists.fi-ware.eu Subject: [Fiware-security] TR: [Fiware-wpl] IMPORTANT: eLearning courses FYI Also to be discussed at our next audio-conf. Regards, Pascal De : fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] De la part de Davide Dalle Carbonare Envoy? : mardi 17 septembre 2013 18:06 ? : fiware at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Objet : [Fiware-wpl] IMPORTANT: eLearning courses Dear Partners, this is a reminder for you to create training courses to publish in the eLearning platform. The priority is for those GEis already available in FI-LAB. It is expected to have their courses published by the end of September. The manual is on the public wiki: https://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/How_to_create_a_SCORM_course (FAQ section will evolve accordingly to your request of support) Kind Regards, Davide -------------- next part -------------- An HTML attachment was scrubbed... URL: From pascal.bisson at thalesgroup.com Thu Sep 19 10:30:56 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Thu, 19 Sep 2013 10:30:56 +0200 Subject: [Fiware-security] FI-WARE Security Chapter - Message-ID: <1227_1379579463_523AB647_1227_1053_1_bf9dc915-70ed-4d74-9648-2397ce4618c4@THSONEA01HUB01P.one.grp> Dear All, The last report I received from TID (Manuel) - see below - clearly shows that there was no progress this month on our Chapter which is not good at all. Even more that some good progress had been performed the month before. So we do have the capacity to improve. So counting on each of you and first and foremost GE owners/Task leads to helps us to recover from this situation and make us progress on fixing the issues identified and reported to us. WP8-Security https://forge.fi-ware.eu/docman/view.php/27/2822/FIWARE.backlog.security.review.20130918-1832.xlsx Progress (Tracker:75.9%->76,0%; Flat Structure 59.1%->59.1%; 72.15%->72.33%) Please devote necessary time and attention this even more that as reminded by Manuel the backlog has a delivery scheduled by 30th October. Thanks in advance for your cooperation and support. Regards, Pascal -------------- next part -------------- An HTML attachment was scrubbed... URL: From pascal.bisson at thalesgroup.com Thu Sep 19 14:25:29 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Thu, 19 Sep 2013 14:25:29 +0200 Subject: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow Message-ID: <6294_1379593533_523AED3D_6294_268_1_8dd4cbaa-da0d-4080-91c0-1adbd9bf7344@THSONEA01HUB06P.one.grp> Dear All, Tomorrow I have another commitment that will impede me to chair as usual our WP8 Weekly audio. Apologize for that. Also why I'm asking here Daniel to share it on my behalf. Please Daniel confirm you can do so. As for the Agenda it would be as usual to review progress on the various actions items as per last minutes and also address actions that came out during week(e.g. dedicated task force to progress across chapter on IdM GE & security monitoring GE ; improvement of needed of our Security Backlog, ...) Best Regards, Pascal -------------- next part -------------- An HTML attachment was scrubbed... URL: From daniel.gidoin at thalesgroup.com Thu Sep 19 15:18:40 2013 From: daniel.gidoin at thalesgroup.com (GIDOIN Daniel) Date: Thu, 19 Sep 2013 15:18:40 +0200 Subject: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow In-Reply-To: References: Message-ID: <6423_1379596758_523AF9D6_6423_6054_1_cb6503aa-e297-42f9-89c9-0a25283726d4@THSONEA01HUB04P.one.grp> Dear All, I agree to review with you progress on the on-going actions, but exceptionally, I should like to postpone this audio at early afternoon (2:30 PM). Please confirm your participation. Best regards Daniel De : BISSON Pascal Envoy? : jeudi 19 septembre 2013 14:25 ? : fiware-security at lists.fi-ware.eu Cc : BISSON Pascal; GIDOIN Daniel Objet : FI-WARE - WP8 Audio conference of tomorrow Dear All, Tomorrow I have another commitment that will impede me to chair as usual our WP8 Weekly audio. Apologize for that. Also why I'm asking here Daniel to share it on my behalf. Please Daniel confirm you can do so. As for the Agenda it would be as usual to review progress on the various actions items as per last minutes and also address actions that came out during week(e.g. dedicated task force to progress across chapter on IdM GE & security monitoring GE ; improvement of needed of our Security Backlog, ...) Best Regards, Pascal -------------- next part -------------- An HTML attachment was scrubbed... URL: From gulden.yilmaz at atos.net Thu Sep 19 15:27:31 2013 From: gulden.yilmaz at atos.net (Gulden Yilmaz) Date: Thu, 19 Sep 2013 15:27:31 +0200 Subject: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow Message-ID: <894637B74089824697518494D61F529902A8F6EC@INTMAIL02.es.int.atosorigin.com> Hi Daniel, I will attend the audio call on behalf of Atos. Best Regards, G?lden From: fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] On Behalf Of GIDOIN Daniel Sent: Thursday, September 19, 2013 4:19 PM To: fiware-security at lists.fi-ware.eu Subject: Re: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow Dear All, I agree to review with you progress on the on-going actions, but exceptionally, I should like to postpone this audio at early afternoon (2:30 PM). Please confirm your participation. Best regards Daniel De : BISSON Pascal Envoy? : jeudi 19 septembre 2013 14:25 ? : fiware-security at lists.fi-ware.eu Cc : BISSON Pascal; GIDOIN Daniel Objet : FI-WARE - WP8 Audio conference of tomorrow Dear All, Tomorrow I have another commitment that will impede me to chair as usual our WP8 Weekly audio. Apologize for that. Also why I'm asking here Daniel to share it on my behalf. Please Daniel confirm you can do so. As for the Agenda it would be as usual to review progress on the various actions items as per last minutes and also address actions that came out during week(e.g. dedicated task force to progress across chapter on IdM GE & security monitoring GE ; improvement of needed of our Security Backlog, ...) Best Regards, Pascal ------------------------------------------------------------------ This e-mail and the documents attached are confidential and intended solely for the addressee; it may also be privileged. If you receive this e-mail in error, please notify the sender immediately and destroy it. As its integrity cannot be secured on the Internet, the Atos group liability cannot be triggered for the message content. Although the sender endeavours to maintain a computer virus-free network, the sender does not warrant that this transmission is virus-free and will not be liable for any damages resulting from any virus transmitted. Este mensaje y los ficheros adjuntos pueden contener informacion confidencial destinada solamente a la(s) persona(s) mencionadas anteriormente pueden estar protegidos por secreto profesional. Si usted recibe este correo electronico por error, gracias por informar inmediatamente al remitente y destruir el mensaje. Al no estar asegurada la integridad de este mensaje sobre la red, Atos no se hace responsable por su contenido. Su contenido no constituye ningun compromiso para el grupo Atos, salvo ratificacion escrita por ambas partes. Aunque se esfuerza al maximo por mantener su red libre de virus, el emisor no puede garantizar nada al respecto y no sera responsable de cualesquiera danos que puedan resultar de una transmision de virus. ------------------------------------------------------------------ -------------- next part -------------- An HTML attachment was scrubbed... URL: From Wolfgang.Steigerwald at telekom.de Thu Sep 19 15:31:26 2013 From: Wolfgang.Steigerwald at telekom.de (Wolfgang.Steigerwald at telekom.de) Date: Thu, 19 Sep 2013 15:31:26 +0200 Subject: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow In-Reply-To: <6423_1379596758_523AF9D6_6423_6054_1_cb6503aa-e297-42f9-89c9-0a25283726d4@THSONEA01HUB04P.one.grp> References: <6423_1379596758_523AF9D6_6423_6054_1_cb6503aa-e297-42f9-89c9-0a25283726d4@THSONEA01HUB04P.one.grp> Message-ID: Hello Daniel, I can't attend the meeting in the afternoon. Best regards Wolfgang Von: fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] Im Auftrag von GIDOIN Daniel Gesendet: Donnerstag, 19. September 2013 15:19 An: fiware-security at lists.fi-ware.eu Betreff: Re: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow Dear All, I agree to review with you progress on the on-going actions, but exceptionally, I should like to postpone this audio at early afternoon (2:30 PM). Please confirm your participation. Best regards Daniel De : BISSON Pascal Envoy? : jeudi 19 septembre 2013 14:25 ? : fiware-security at lists.fi-ware.eu Cc : BISSON Pascal; GIDOIN Daniel Objet : FI-WARE - WP8 Audio conference of tomorrow Dear All, Tomorrow I have another commitment that will impede me to chair as usual our WP8 Weekly audio. Apologize for that. Also why I'm asking here Daniel to share it on my behalf. Please Daniel confirm you can do so. As for the Agenda it would be as usual to review progress on the various actions items as per last minutes and also address actions that came out during week(e.g. dedicated task force to progress across chapter on IdM GE & security monitoring GE ; improvement of needed of our Security Backlog, ...) Best Regards, Pascal -------------- next part -------------- An HTML attachment was scrubbed... URL: From xavier.aghina at orange.com Thu Sep 19 15:37:11 2013 From: xavier.aghina at orange.com (xavier.aghina at orange.com) Date: Thu, 19 Sep 2013 13:37:11 +0000 Subject: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow In-Reply-To: <6423_1379596758_523AF9D6_6423_6054_1_cb6503aa-e297-42f9-89c9-0a25283726d4@THSONEA01HUB04P.one.grp> References: <6423_1379596758_523AF9D6_6423_6054_1_cb6503aa-e297-42f9-89c9-0a25283726d4@THSONEA01HUB04P.one.grp> Message-ID: <26198_1379597832_523AFE08_26198_19377_1_81FF741594681345A3FBB024B01054B906FD36E2@PEXCVZYM11.corporate.adroot.infra.ftgroup> Hi Daniel, I am already a phone call in this time slot, should have an exchange next week for a release of code. Brgds. Xavier. De : fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] De la part de GIDOIN Daniel Envoy? : jeudi 19 septembre 2013 15:19 ? : fiware-security at lists.fi-ware.eu Objet : Re: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow Dear All, I agree to review with you progress on the on-going actions, but exceptionally, I should like to postpone this audio at early afternoon (2:30 PM). Please confirm your participation. Best regards Daniel De : BISSON Pascal Envoy? : jeudi 19 septembre 2013 14:25 ? : fiware-security at lists.fi-ware.eu Cc : BISSON Pascal; GIDOIN Daniel Objet : FI-WARE - WP8 Audio conference of tomorrow Dear All, Tomorrow I have another commitment that will impede me to chair as usual our WP8 Weekly audio. Apologize for that. Also why I'm asking here Daniel to share it on my behalf. Please Daniel confirm you can do so. As for the Agenda it would be as usual to review progress on the various actions items as per last minutes and also address actions that came out during week(e.g. dedicated task force to progress across chapter on IdM GE & security monitoring GE ; improvement of needed of our Security Backlog, ...) Best Regards, Pascal _________________________________________________________________________________________________________________________ Ce message et ses pieces jointes peuvent contenir des informations confidentielles ou privilegiees et ne doivent donc pas etre diffuses, exploites ou copies sans autorisation. Si vous avez recu ce message par erreur, veuillez le signaler a l'expediteur et le detruire ainsi que les pieces jointes. Les messages electroniques etant susceptibles d'alteration, Orange decline toute responsabilite si ce message a ete altere, deforme ou falsifie. Merci. This message and its attachments may contain confidential or privileged information that may be protected by law; they should not be distributed, used or copied without authorisation. If you have received this email in error, please notify the sender and delete this message and its attachments. As emails may be altered, Orange is not liable for messages that have been modified, changed or falsified. Thank you. -------------- next part -------------- An HTML attachment was scrubbed... URL: From daniel.gidoin at thalesgroup.com Thu Sep 19 15:43:39 2013 From: daniel.gidoin at thalesgroup.com (GIDOIN Daniel) Date: Thu, 19 Sep 2013 15:43:39 +0200 Subject: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow In-Reply-To: <6423_1379596758_523AF9D6_6423_6054_1_cb6503aa-e297-42f9-89c9-0a25283726d4@THSONEA01HUB04P.one.grp> References: <6423_1379596758_523AF9D6_6423_6054_1_cb6503aa-e297-42f9-89c9-0a25283726d4@THSONEA01HUB04P.one.grp> Message-ID: <12852_1379598221_523AFF8C_12852_2431_1_8c2d4c78-133a-49bd-9606-6c62b56e2d86@THSONEA01HUB01P.one.grp> I apologize, the audio is anticipated between 1:00 PM to 2:00 PM. Best regards Daniel De : fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] De la part de GIDOIN Daniel Envoy? : jeudi 19 septembre 2013 15:19 ? : fiware-security at lists.fi-ware.eu Objet : Re: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow Dear All, I agree to review with you progress on the on-going actions, but exceptionally, I should like to postpone this audio at early afternoon (2:30 PM). Please confirm your participation. Best regards Daniel De : BISSON Pascal Envoy? : jeudi 19 septembre 2013 14:25 ? : fiware-security at lists.fi-ware.eu Cc : BISSON Pascal; GIDOIN Daniel Objet : FI-WARE - WP8 Audio conference of tomorrow Dear All, Tomorrow I have another commitment that will impede me to chair as usual our WP8 Weekly audio. Apologize for that. Also why I'm asking here Daniel to share it on my behalf. Please Daniel confirm you can do so. As for the Agenda it would be as usual to review progress on the various actions items as per last minutes and also address actions that came out during week(e.g. dedicated task force to progress across chapter on IdM GE & security monitoring GE ; improvement of needed of our Security Backlog, ...) Best Regards, Pascal -------------- next part -------------- An HTML attachment was scrubbed... URL: From lucie.gaspard at thalesgroup.com Thu Sep 19 16:16:27 2013 From: lucie.gaspard at thalesgroup.com (GASPARD Lucie) Date: Thu, 19 Sep 2013 16:16:27 +0200 Subject: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow In-Reply-To: <12852_1379598221_523AFF8C_12852_2431_1_8c2d4c78-133a-49bd-9606-6c62b56e2d86@THSONEA01HUB01P.one.grp> References: <6423_1379596758_523AF9D6_6423_6054_1_cb6503aa-e297-42f9-89c9-0a25283726d4@THSONEA01HUB04P.one.grp> <12852_1379598221_523AFF8C_12852_2431_1_8c2d4c78-133a-49bd-9606-6c62b56e2d86@THSONEA01HUB01P.one.grp> Message-ID: <14553_1379600193_523B0741_14553_229_1_5c7a2165-2b15-45d1-af2d-a9b1eca6b93d@THSONEA01HUB03P.one.grp> Hi Daniel, I will attend on behalf of TCS. Best regards, Lucie [@@ THALES GROUP INTERNAL @@] De : fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] De la part de GIDOIN Daniel Envoy? : jeudi 19 septembre 2013 15:44 ? : GIDOIN Daniel; fiware-security at lists.fi-ware.eu Objet : Re: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow I apologize, the audio is anticipated between 1:00 PM to 2:00 PM. Best regards Daniel De : fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] De la part de GIDOIN Daniel Envoy? : jeudi 19 septembre 2013 15:19 ? : fiware-security at lists.fi-ware.eu Objet : Re: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow Dear All, I agree to review with you progress on the on-going actions, but exceptionally, I should like to postpone this audio at early afternoon (2:30 PM). Please confirm your participation. Best regards Daniel De : BISSON Pascal Envoy? : jeudi 19 septembre 2013 14:25 ? : fiware-security at lists.fi-ware.eu Cc : BISSON Pascal; GIDOIN Daniel Objet : FI-WARE - WP8 Audio conference of tomorrow Dear All, Tomorrow I have another commitment that will impede me to chair as usual our WP8 Weekly audio. Apologize for that. Also why I'm asking here Daniel to share it on my behalf. Please Daniel confirm you can do so. As for the Agenda it would be as usual to review progress on the various actions items as per last minutes and also address actions that came out during week(e.g. dedicated task force to progress across chapter on IdM GE & security monitoring GE ; improvement of needed of our Security Backlog, ...) Best Regards, Pascal -------------- next part -------------- An HTML attachment was scrubbed... URL: From slim.trabelsi at sap.com Thu Sep 19 17:15:56 2013 From: slim.trabelsi at sap.com (TRABELSI, Slim) Date: Thu, 19 Sep 2013 15:15:56 +0000 Subject: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow In-Reply-To: <12852_1379598221_523AFF8C_12852_2431_1_8c2d4c78-133a-49bd-9606-6c62b56e2d86@THSONEA01HUB01P.one.grp> References: <6423_1379596758_523AF9D6_6423_6054_1_cb6503aa-e297-42f9-89c9-0a25283726d4@THSONEA01HUB04P.one.grp> <12852_1379598221_523AFF8C_12852_2431_1_8c2d4c78-133a-49bd-9606-6c62b56e2d86@THSONEA01HUB01P.one.grp> Message-ID: <31F2B8F7A6BAD749A28AE406B8EF25096A321DC2@DEWDFEMB19A.global.corp.sap> Hi Daniel, >From 1 to 2 is not possible for us. Best Slim From: fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] On Behalf Of GIDOIN Daniel Sent: jeudi 19 septembre 2013 15:44 To: GIDOIN Daniel; fiware-security at lists.fi-ware.eu Subject: Re: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow I apologize, the audio is anticipated between 1:00 PM to 2:00 PM. Best regards Daniel De : fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] De la part de GIDOIN Daniel Envoy? : jeudi 19 septembre 2013 15:19 ? : fiware-security at lists.fi-ware.eu Objet : Re: [Fiware-security] FI-WARE - WP8 Audio conference of tomorrow Dear All, I agree to review with you progress on the on-going actions, but exceptionally, I should like to postpone this audio at early afternoon (2:30 PM). Please confirm your participation. Best regards Daniel De : BISSON Pascal Envoy? : jeudi 19 septembre 2013 14:25 ? : fiware-security at lists.fi-ware.eu Cc : BISSON Pascal; GIDOIN Daniel Objet : FI-WARE - WP8 Audio conference of tomorrow Dear All, Tomorrow I have another commitment that will impede me to chair as usual our WP8 Weekly audio. Apologize for that. Also why I'm asking here Daniel to share it on my behalf. Please Daniel confirm you can do so. As for the Agenda it would be as usual to review progress on the various actions items as per last minutes and also address actions that came out during week(e.g. dedicated task force to progress across chapter on IdM GE & security monitoring GE ; improvement of needed of our Security Backlog, ...) Best Regards, Pascal -------------- next part -------------- An HTML attachment was scrubbed... URL: From daniel.gidoin at thalesgroup.com Fri Sep 20 10:51:28 2013 From: daniel.gidoin at thalesgroup.com (GIDOIN Daniel) Date: Fri, 20 Sep 2013 10:51:28 +0200 Subject: [Fiware-security] FI-WARE catalogue Message-ID: <18650_1379667090_523C0C92_18650_16625_1_df8a8e8b-27ce-4726-9123-658deedbe2fe@THSONEA01HUB01P.one.grp> Dear Pedro, Can you publish the new version of the security Monitoring GE by amending the "Terms and conditions" (FI-LAB replacing Open Innovation Lab) Thank you. Best regards Daniel -------------- next part -------------- An HTML attachment was scrubbed... URL: From FRP at zurich.ibm.com Fri Sep 20 18:51:04 2013 From: FRP at zurich.ibm.com (Franz-Stefan Preiss) Date: Fri, 20 Sep 2013 18:51:04 +0200 Subject: [Fiware-security] Transition between ticket states in FI-Ware tracker Message-ID: Hi Richard, All, to continue our discussion from today's conf call: it seems that if you want to go from Under Execution back to Open for a ticket in the FI-Ware tracker (without deleting it), you have to take a small detour: Under Execution -> Under Verification -> Closed -> Open Under Execution -> Dismissed -> Open I also found this in a mail from Miguel Carillo on June 4th 2013, which shows the permitted transitions: Best Regards, Franz-Stefan -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: image/png Size: 44936 bytes Desc: not available URL: From pascal.bisson at thalesgroup.com Tue Sep 24 14:00:04 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Tue, 24 Sep 2013 14:00:04 +0200 Subject: [Fiware-security] FI-WARE Securiy Backlog - last chance to improve before next review report Message-ID: <26309_1380024005_52417EC5_26309_15477_1_CBBCD6C304123F4AB23FAAE3055C8C0E02081ACF8B5F@THSONEA01CMS04P.one.grp> Dear All, This email just to let you know you still have till EOB today to work on security Chapter backlog improvement before next review report to be produced by TID (Manuel). So counting on you all to work on it to continue to get it improved and fix the issues which were reported. And yes I know that some of you did work on it already. The problem is simply that we need all to work on it and not only a few. Regards, Pascal PS: WP8-Security(@Pascal) https://forge.fi-ware.eu/docman/view.php/27/2822/FIWARE.backlog.security.review.20130918-1832.xlsx Progress (Tracker:75.9%->76,0%; Flat Structure 59.1%->59.1%; 72.15%->72.33%) -------------- next part -------------- An HTML attachment was scrubbed... URL: From FRP at zurich.ibm.com Tue Sep 24 17:57:15 2013 From: FRP at zurich.ibm.com (Franz-Stefan Preiss) Date: Tue, 24 Sep 2013 17:57:15 +0200 Subject: [Fiware-security] FI-WARE Security Chapter - In-Reply-To: <1227_1379579463_523AB647_1227_1053_1_bf9dc915-70ed-4d74-9648-2397ce4618c4@THSONEA01HUB01P.one.grp> References: <1227_1379579463_523AB647_1227_1053_1_bf9dc915-70ed-4d74-9648-2397ce4618c4@THSONEA01HUB01P.one.grp> Message-ID: Hi Pascal, Hi All, I made some major updates to our tracker backlog and hope that most issues are fixed. However, there are still some open questions (which may also be interested for the other partners in the WP): a) There is a feature that I just now (Sprint 3.1.3) started to work on, so I set it to "Under execution". However, the feature will only be finished beginning of December, so I set it to Sprint 3.2.3 (and Release 3.2). Does this sound reasonable? I'm afraid it will be flagged by TID because it is "Under execution" but not set to the current Sprint. b) I assumed that when I close a ticket, I set it's Release and Sprint to the one when it was closed/finished. Apparently, this assumption is wrong, because in the last backlog review under category T-C1, closed tickets that have Release and Sprint set are flagged. Can you explain to us why? c) In the review under category T-C3, epics that have no "sons" are flagged. I fixed this issue by renaming all our tickets such that "sons" partially contain the name of the "father" as prefix. For example, FIWARE.Feature.Security.Privacy.Authentication.CredentialIssuance is the son of FIWARE.Epic.Security.Privacy.Authentication. Is this the correct way of defining father-son relations? There is no corresponding field in the tracker tickets, and I don't know how else one can define such relationships. d) Epics and Features have to be documented on the Wiki. Category T-C5 of the review flags Epics and Features that have both the field "Wiki URL" and "Detailed Description" set and suggests to remove the description. But the Detailed Description is a mandatory field in the tracker, so it cannot be removed and thus it's unclear to me what to do here. Best Regards, Franz-Stefan From: BISSON Pascal To: "fiware-security at lists.fi-ware.eu" Date: 09/19/2013 10:31 AM Subject: [Fiware-security] FI-WARE Security Chapter - Sent by: fiware-security-bounces at lists.fi-ware.eu Dear All, The last report I received from TID (Manuel) ? see below - clearly shows that there was no progress this month on our Chapter which is not good at all. Even more that some good progress had been performed the month before. So we do have the capacity to improve. So counting on each of you and first and foremost GE owners/Task leads to helps us to recover from this situation and make us progress on fixing the issues identified and reported to us. WP8-Security< an lang=EN-GB> https://forge.fi-ware.eu/docman/view.php/27/2822/FIWARE.backlog.security.review.20130918-1832.xlsx Progress (Tracker:75.9%->76,0%; Flat Structure 59.1%->59.1%; 72.15%->72.33%) Please devote necessary time and attention this even more that as reminded by Manuel the backlog has a delivery scheduled by 30th October. Thanks in advance for your cooperation and support. Regards, Pascal_______________________________________________ Fiware-security mailing list Fiware-security at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-security -------------- next part -------------- An HTML attachment was scrubbed... URL: From robert.seidl at nsn.com Tue Sep 24 18:07:25 2013 From: robert.seidl at nsn.com (Seidl, Robert (NSN - DE/Munich)) Date: Tue, 24 Sep 2013 16:07:25 +0000 Subject: [Fiware-security] FI-WARE Security Chapter - In-Reply-To: References: <1227_1379579463_523AB647_1227_1053_1_bf9dc915-70ed-4d74-9648-2397ce4618c4@THSONEA01HUB01P.one.grp> Message-ID: Hi Pascal, as discussed in our IDM telco yesterday with Juanjo, we will completely rearrange the backlog for IDM GE. This will take some time and cannot be done until tomorrow, but this was agreed with Juanjo. However I did already some changes in order to solve some of the issues. Greetings Robert From: fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] On Behalf Of ext Franz-Stefan Preiss Sent: Tuesday, September 24, 2013 5:57 PM To: ext BISSON Pascal; GIDOIN Daniel Cc: fiware-security at lists.fi-ware.eu Subject: Re: [Fiware-security] FI-WARE Security Chapter - Hi Pascal, Hi All, I made some major updates to our tracker backlog and hope that most issues are fixed. However, there are still some open questions (which may also be interested for the other partners in the WP): a) There is a feature that I just now (Sprint 3.1.3) started to work on, so I set it to "Under execution". However, the feature will only be finished beginning of December, so I set it to Sprint 3.2.3 (and Release 3.2). Does this sound reasonable? I'm afraid it will be flagged by TID because it is "Under execution" but not set to the current Sprint. b) I assumed that when I close a ticket, I set it's Release and Sprint to the one when it was closed/finished. Apparently, this assumption is wrong, because in the last backlog review under category T-C1, closed tickets that have Release and Sprint set are flagged. Can you explain to us why? c) In the review under category T-C3, epics that have no "sons" are flagged. I fixed this issue by renaming all our tickets such that "sons" partially contain the name of the "father" as prefix. For example, FIWARE.Feature.Security.Privacy.Authentication.CredentialIssuance is the son of FIWARE.Epic.Security.Privacy.Authentication. Is this the correct way of defining father-son relations? There is no corresponding field in the tracker tickets, and I don't know how else one can define such relationships. d) Epics and Features have to be documented on the Wiki. Category T-C5 of the review flags Epics and Features that have both the field "Wiki URL" and "Detailed Description" set and suggests to remove the description. But the Detailed Description is a mandatory field in the tracker, so it cannot be removed and thus it's unclear to me what to do here. Best Regards, Franz-Stefan From: BISSON Pascal > To: "fiware-security at lists.fi-ware.eu" > Date: 09/19/2013 10:31 AM Subject: [Fiware-security] FI-WARE Security Chapter - Sent by: fiware-security-bounces at lists.fi-ware.eu ________________________________ Dear All, The last report I received from TID (Manuel) ? see below - clearly shows that there was no progress this month on our Chapter which is not good at all. Even more that some good progress had been performed the month before. So we do have the capacity to improve. So counting on each of you and first and foremost GE owners/Task leads to helps us to recover from this situation and make us progress on fixing the issues identified and reported to us. WP8-Security< an lang=EN-GB>https://forge.fi-ware.eu/docman/view.php/27/2822/FIWARE.backlog.security.review.20130918-1832.xlsx Progress (Tracker:75.9%->76,0%; Flat Structure 59.1%->59.1%; 72.15%->72.33%) Please devote necessary time and attention this even more that as reminded by Manuel the backlog has a delivery scheduled by 30th October. Thanks in advance for your cooperation and support. Regards, Pascal_______________________________________________ Fiware-security mailing list Fiware-security at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-security -------------- next part -------------- An HTML attachment was scrubbed... URL: From pascal.bisson at thalesgroup.com Tue Sep 24 18:16:19 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Tue, 24 Sep 2013 18:16:19 +0200 Subject: [Fiware-security] FI-WARE Security Chapter - In-Reply-To: References: <1227_1379579463_523AB647_1227_1053_1_bf9dc915-70ed-4d74-9648-2397ce4618c4@THSONEA01HUB01P.one.grp> Message-ID: <10717_1380039388_5241BAD9_10717_52_3_38b061ca-e4e0-46c3-bd38-721f2f58643e@THSONEA01HUB04P.one.grp> Yes What I did ask was not for you who had (as agreed with Juanjo) to reshuffle your entries. And yes I know it will take time but please provide me with a date at which you think it would be done (one week, two weeks from now ?). Hearing from you ? As for your effort in addressing the issues as per today backlog entries. Thanks for your effort ! Regards, Pascal De : Seidl, Robert (NSN - DE/Munich) [mailto:robert.seidl at nsn.com] Envoy? : mardi 24 septembre 2013 18:07 ? : BISSON Pascal; GIDOIN Daniel Cc : fiware-security at lists.fi-ware.eu Objet : RE: [Fiware-security] FI-WARE Security Chapter - Hi Pascal, as discussed in our IDM telco yesterday with Juanjo, we will completely rearrange the backlog for IDM GE. This will take some time and cannot be done until tomorrow, but this was agreed with Juanjo. However I did already some changes in order to solve some of the issues. Greetings Robert From: fiware-security-bounces at lists.fi-ware.eu [mailto:fiware-security-bounces at lists.fi-ware.eu] On Behalf Of ext Franz-Stefan Preiss Sent: Tuesday, September 24, 2013 5:57 PM To: ext BISSON Pascal; GIDOIN Daniel Cc: fiware-security at lists.fi-ware.eu Subject: Re: [Fiware-security] FI-WARE Security Chapter - Hi Pascal, Hi All, I made some major updates to our tracker backlog and hope that most issues are fixed. However, there are still some open questions (which may also be interested for the other partners in the WP): a) There is a feature that I just now (Sprint 3.1.3) started to work on, so I set it to "Under execution". However, the feature will only be finished beginning of December, so I set it to Sprint 3.2.3 (and Release 3.2). Does this sound reasonable? I'm afraid it will be flagged by TID because it is "Under execution" but not set to the current Sprint. b) I assumed that when I close a ticket, I set it's Release and Sprint to the one when it was closed/finished. Apparently, this assumption is wrong, because in the last backlog review under category T-C1, closed tickets that have Release and Sprint set are flagged. Can you explain to us why? c) In the review under category T-C3, epics that have no "sons" are flagged. I fixed this issue by renaming all our tickets such that "sons" partially contain the name of the "father" as prefix. For example, FIWARE.Feature.Security.Privacy.Authentication.CredentialIssuance is the son of FIWARE.Epic.Security.Privacy.Authentication. Is this the correct way of defining father-son relations? There is no corresponding field in the tracker tickets, and I don't know how else one can define such relationships. d) Epics and Features have to be documented on the Wiki. Category T-C5 of the review flags Epics and Features that have both the field "Wiki URL" and "Detailed Description" set and suggests to remove the description. But the Detailed Description is a mandatory field in the tracker, so it cannot be removed and thus it's unclear to me what to do here. Best Regards, Franz-Stefan From: BISSON Pascal > To: "fiware-security at lists.fi-ware.eu" > Date: 09/19/2013 10:31 AM Subject: [Fiware-security] FI-WARE Security Chapter - Sent by: fiware-security-bounces at lists.fi-ware.eu ________________________________ Dear All, The last report I received from TID (Manuel) ? see below - clearly shows that there was no progress this month on our Chapter which is not good at all. Even more that some good progress had been performed the month before. So we do have the capacity to improve. So counting on each of you and first and foremost GE owners/Task leads to helps us to recover from this situation and make us progress on fixing the issues identified and reported to us. WP8-Security< an lang=EN-GB>https://forge.fi-ware.eu/docman/view.php/27/2822/FIWARE.backlog.security.review.20130918-1832.xlsx Progress (Tracker:75.9%->76,0%; Flat Structure 59.1%->59.1%; 72.15%->72.33%) Please devote necessary time and attention this even more that as reminded by Manuel the backlog has a delivery scheduled by 30th October. Thanks in advance for your cooperation and support. Regards, Pascal_______________________________________________ Fiware-security mailing list Fiware-security at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-security -------------- next part -------------- An HTML attachment was scrubbed... URL: From pascal.bisson at thalesgroup.com Wed Sep 25 17:31:02 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Wed, 25 Sep 2013 17:31:02 +0200 Subject: [Fiware-security] FI-WARE Security Chapter - In-Reply-To: References: <1227_1379579463_523AB647_1227_1053_1_bf9dc915-70ed-4d74-9648-2397ce4618c4@THSONEA01HUB01P.one.grp> Message-ID: <16585_1380123069_524301BC_16585_13974_1_89246f4f-40cc-4176-aaa7-dbfbc485e039@THSONEA01HUB01P.one.grp> Dear Franz-Stefan, Dear Franz-Stefan, Thanks for your effort. Here are my answer also checked/confirmed by Manuel. Hope it help you and others. Regards, Pascal De : Franz-Stefan Preiss [mailto:FRP at zurich.ibm.com] Envoy? : mardi 24 septembre 2013 17:57 ? : BISSON Pascal; GIDOIN Daniel Cc : fiware-security at lists.fi-ware.eu Objet : Re: [Fiware-security] FI-WARE Security Chapter - Hi Pascal, Hi All, I made some major updates to our tracker backlog and hope that most issues are fixed. However, there are still some open questions (which may also be interested for the other partners in the WP): a) There is a feature that I just now (Sprint 3.1.3) started to work on, so I set it to "Under execution". However, the feature will only be finished beginning of December, so I set it to Sprint 3.2.3 (and Release 3.2). Does this sound reasonable? I'm afraid it will be flagged by TID because it is "Under execution" but not set to the current Sprint. >> For Feature you don?t need to mention a Sprint. So just set the Release (here Release 3.2) b) I assumed that when I close a ticket, I set it's Release and Sprint to the one when it was closed/finished. >> Correct Apparently, this assumption is wrong, because in the last backlog review under category T-C1, closed tickets that have Release and Sprint set are flagged. Can you explain to us why? >> Probably due to the fact that you didn?t comply to the following rules: ? Feature only need Release ? Stories & WorkItems need both Release and Sprint ? As for EPIC so don?t need any of those. c) In the review under category T-C3, epics that have no "sons" are flagged. I fixed this issue by renaming all our tickets such that "sons" partially contain the name of the "father" as prefix. For example, FIWARE.Feature.Security.Privacy.Authentication.CredentialIssuance is the son of FIWARE.Epic.Security.Privacy.Authentication. Is this the correct way of defining father-son relations? >>> YES There is no corresponding field in the tracker tickets, and I don't know how else one can define such relationships. d) Epics and Features have to be documented on the Wiki. Category T-C5 of the review flags Epics and Features that have both the field "Wiki URL" and "Detailed Description" set and suggests to remove the description. >>> Don?t care too much for TC-5 issues. Manuel is working on getting them addressed automatically. The objective being not to duplicate things. But the Detailed Description is a mandatory field in the tracker, so it cannot be removed and thus it's unclear to me what to do here. >>> You are right Detailed Description is mandatory (confirmed By Manuel). So the only thing we can do here would be to remove the content and only leave blank/white space as content. Best Regards, Franz-Stefan From: BISSON Pascal > To: "fiware-security at lists.fi-ware.eu" > Date: 09/19/2013 10:31 AM Subject: [Fiware-security] FI-WARE Security Chapter - Sent by: fiware-security-bounces at lists.fi-ware.eu ________________________________ Dear All, The last report I received from TID (Manuel) ? see below - clearly shows that there was no progress this month on our Chapter which is not good at all. Even more that some good progress had been performed the month before. So we do have the capacity to improve. So counting on each of you and first and foremost GE owners/Task leads to helps us to recover from this situation and make us progress on fixing the issues identified and reported to us. WP8-Security< an lang=EN-GB>https://forge.fi-ware.eu/docman/view.php/27/2822/FIWARE.backlog.security.review.20130918-1832.xlsx Progress (Tracker:75.9%->76,0%; Flat Structure 59.1%->59.1%; 72.15%->72.33%) Please devote necessary time and attention this even more that as reminded by Manuel the backlog has a delivery scheduled by 30th October. Thanks in advance for your cooperation and support. Regards, Pascal_______________________________________________ Fiware-security mailing list Fiware-security at lists.fi-ware.eu https://lists.fi-ware.eu/listinfo/fiware-security -------------- next part -------------- An HTML attachment was scrubbed... URL: From pascal.bisson at thalesgroup.com Fri Sep 27 10:04:10 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Fri, 27 Sep 2013 10:04:10 +0200 Subject: [Fiware-security] TR: Dashboards for release/sprint transition - available Message-ID: <16980_1380269056_52453BFB_16980_18_2_CBBCD6C304123F4AB23FAAE3055C8C0E02081ED09B85@THSONEA01CMS04P.one.grp> Dear All, Here is the link to Backlog Security report produced by TID. See the tips provided by Manuel and his email. WP8->https://forge.fi-ware.eu/docman/view.php/27/2856/FIWARE.backlog.security.dashboard.20130926-1153.xlsx As you, will see there was some good progress this week (probably thanks to the reminder I sent and work we all performed after)so let's continue like this ! And yes to be further discuss with you at our audio . Will start it now ! Regards, Pascal De : fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] De la part de MANUEL ESCRICHE VICENTE Envoy? : jeudi 26 septembre 2013 16:03 ? : fiware-ge-owners at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Objet : [Fiware-wpl] Dashboards for release/sprint transition - available Dear Partners, Let me share with you the Backlog dashboards in order to help the release and sprint transition, which is coming in a few days. The dashboards give both WP Leaders and GEi owners their corresponding views for both chapter and GEi's activity and roadmap. I think they can be understood better, and therefore organised. WP3 - >https://forge.fi-ware.eu/docman/view.php/27/2851/FIWARE.backlog.apps.dashboard.20130926-1152.xlsx WP4 ->https://forge.fi-ware.eu/docman/view.php/27/2852/FIWARE.backlog.cloud.dashboard.20130926-1152.xlsx WP5 ->https://forge.fi-ware.eu/docman/view.php/27/2855/FIWARE.backlog.iot.dashboard.20130926-1153.xlsx WP6 ->https://forge.fi-ware.eu/docman/view.php/27/2853/FIWARE.backlog.data.dashboard.20130926-1153.xlsx WP7->https://forge.fi-ware.eu/docman/view.php/27/2854/FIWARE.backlog.i2nd.dashboard.20130926-1153.xlsx WP8->https://forge.fi-ware.eu/docman/view.php/27/2856/FIWARE.backlog.security.dashboard.20130926-1153.xlsx If you don't find the tab for your GEi, please, let me know so that I can produce the right information for better management. Let me give you a few tips for better understanding and use. 1. The roadmap section is there for you to identify and schedule items properly - it needs to be aligned with the technical roadmap defined on the wiki. Allowed status are open and schedule. You move from open to schedule when you know the timeframe. 2. The backlog section contains the items which are processed in the current release and sprint. Under execution, under verification and closed/dismissed are allowed status here. If you had the roadmap well scheduled, the items will be moved automatically to the backlog when the month changes. 3. The finished section contains all items finished. The only status allowed is closed/dismissed. Let me emphasize there's need for all of us to cooperate to setup the right agile dynamic. It is neither difficult nor time-consuming, and allows better mutual understanding among the many people involved in the project. I know it's always a trade-off between different values, but you can be sure that risk management or mitigating significant deviations is not possible without the proper reliable information. If anything, please, don't hesitate to let me know. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: From pascal.bisson at thalesgroup.com Mon Sep 30 16:59:12 2013 From: pascal.bisson at thalesgroup.com (BISSON Pascal) Date: Mon, 30 Sep 2013 16:59:12 +0200 Subject: [Fiware-security] TR: Sprint transition from S3.1.3-M29 to S3.2.1-M30 Message-ID: <27705_1380553166_524991CE_27705_16121_1_962af40c-f44e-4df9-b15d-70a101a3b599@THSONEA01HUB04P.one.grp> FYI And yes please all address the way needed and according to the set deadline ! Thanks and Yes next Manuel Snapshop will tell us ! Regards, Pascal De : fiware-wpl-bounces at lists.fi-ware.eu [mailto:fiware-wpl-bounces at lists.fi-ware.eu] De la part de MANUEL ESCRICHE VICENTE Envoy? : lundi 30 septembre 2013 10:39 ? : fiware-ge-owners at lists.fi-ware.eu; fiware-wpl at lists.fi-ware.eu; fiware-wpa at lists.fi-ware.eu Objet : [Fiware-wpl] Sprint transition from S3.1.3-M29 to S3.2.1-M30 Dear Partners, Let me remind you of the release and sprint transition. We move from S3.1.3-M29 to S3.2.1-M30, it means we also close Release 3.1 today. http://forge.fi-ware.eu/plugins/mediawiki/wiki/fiware/index.php/Releases_and_Sprints_numbering Let me remind you the dashboards are placed at the backlog folder: https://forge.fi-ware.eu/docman/?group_id=27# [cid:image001.png at 01CEBDC9.1427C570] This task shouldn't take you more than 5 minutes. Otherwise, we're doing something wrong. I'll take a backlog snapshot today at 18:00 CET, please, do your updates before that time. Let me remind you that S3.2.1-M30 sprint planning last until Friday 4th October, when I'll take another snapshot for the planning meeting I'll be holding with your WP Leader. Thanks for cooperation! If anything, please, don't hesitate to let me know. Kind regards, Manuel ---------------------------- Manuel Escriche Vicente Agile Project Manager/Leader FI-WARE Initiative Telef?nica Digital Parque Tecnol?gico C/ Abraham Zacuto, 10 47151 - Boecillo Valladolid - Spain Tfno: +34.91.312.99.72 Fax: +34.983.36.75.64 http://www.tid.es ________________________________ Este mensaje se dirige exclusivamente a su destinatario. Puede consultar nuestra pol?tica de env?o y recepci?n de correo electr?nico en el enlace situado m?s abajo. This message is intended exclusively for its addressee. We only send and receive email on the basis of the terms set out at: http://www.tid.es/ES/PAGINAS/disclaimer.aspx -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.png Type: image/png Size: 13805 bytes Desc: image001.png URL: -------------- next part -------------- An embedded and charset-unspecified text was scrubbed... Name: ATT00001.txt URL: