Hi Miguel,
thanks for your feedbacks. My answers inline.
The minute is now available on WP10 forge (1)
(1) https://forge.fi-ware.eu/docman/?group_id=18
Cheers,
Paolo
_____
Da: fiware-testbed-bounces at lists.fi-ware.eu
[mailto:fiware-testbed-bounces at lists.fi-ware.eu] Per conto di Miguel
Carrillo
Inviato: mercoledì 11 aprile 2012 9.10
A: fiware-testbed at lists.fi-ware.eu
Oggetto: Re: [Fiware-testbed] Minutes-WP10-10_04_2012
Dear Paolo
My comments.
"the first testbed release by month 19 (end of October) in place of month 15
(end of July)."
I said that this could well be end of Sept. It is not clearly defined now.
--> I have updated the minute by putting there both the possibilities
declared in the WPL\WPLA minute i.e. month 19 (end
of October) or at least by month 18 (end of September) highlighting that
such possibilities are, anyway, only hypothesis since a check, from PO, was
not yet arrived.
Deliverable D10.3 status. "Paolo informs all that the deliverable D10.3 is
basically in a good shape and that, excerpt that a still missing section
concerning the sanity check - Miguel will provide as soon as possible - " .
This is mixed up. I said that there will be a section with an integration
backlog (related to task2). I will organize a tracker (this means defining
customized fields and a workflow). And this will be a section in the doc,
that will describe it. If you think about it, the doc is in between Task 2
and 3 (and the current draft has elements from Task 3 only )
The TOC for the sanity check and the diagnosis guide will go to the install
& admin guides of the chapters and it is something that we will explicitly
request from them . This will be placed in a the private wiki as a guideline
(all install and admin guides have a more or less free TOC, but not for this
sections). This is a commitment from the WPA/WPL meeting so I will have to
do it.
This is however properly reflected in section 3 of the minutes.
--> Ok I have re-written this part so now it should be fine.
Best regards,
Miguel
El 10/04/2012 18:06, Paolo Zampognaro escribió:
Dear all,
find attached the minutes of the today Phc for your review.
Please let me know your comments before I formally release them on the
forge.
Cheers,
Paolo Zampognaro
Ing. Paolo Zampognaro
Software Engineer
Direzione Centrale Ricerca & Innovazione
<mailto:paolo.zampognaro at eng.it> paolo.zampognaro at eng.it
Engineering Ingegneria Informatica spa
Via Gianturco, 15 - 80146 Napoli
Tel. +39-081.6103524
Mob. +39-3451227587
Fax. +39-081.6103200
www.eng.it
--
----------------------------------------------------------------------
_/ _/_/ Miguel Carrillo Pacheco
_/ _/ _/ _/ Telefónica Distrito Telefónica
_/ _/_/_/ _/ _/ Investigación y Edifico Oeste 1, Planta 9
_/ _/ _/ _/ Desarrollo Ronda de la Comunicación S/N
_/ _/_/ 28050 Madrid (Spain)
Tel: (+34) 91 483 26 77
e-mail: mcp at tid.es
Follow FI-WARE on the net
Website: http://www.fi-ware.eu
Facebook: http://www.facebook.com/pages/FI-WARE/251366491587242
Twitter: http://twitter.com/Fiware
LinkedIn: http://www.linkedin.com/groups/FIWARE-4239932
----------------------------------------------------------------------
_____
Este mensaje se dirige exclusivamente a su destinatario. Puede consultar
nuestra política de envío y recepción de correo electrónico en el enlace
situado más abajo.
This message is intended exclusively for its addressee. We only send and
receive email on the basis of the terms set out at.
http://www.tid.es/ES/PAGINAS/disclaimer.aspx
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.fiware.org/private/old-fiware-testbed/attachments/20120411/fa9dd549/attachment.html>
You can get more information about our cookies and privacy policies clicking on the following links: Privacy policy Cookies policy